447 Quincy Avenue
Bronx, NY 10465BBL 2-05579-0014Map
Owner of record: Rolfi Alonzo
447 Quincy Avenue is an one-family home built in 1925 in Bronx, 10465. It has 1 residential unit across 2.5 floors. The owner of record is Rolfi Alonzo. HPD has recorded 54 housing violations here, most recently on October 17, 2022. 48 of the 50 most recent violations are still open.
- HPD violations
- 54
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 3
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 54
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 17, 2022
Open — Info nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 4th room from north at west located at apt ph, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt PH
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from north at east located at apt ph, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt PH
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 3rd bathroom from north at center located at apt ph, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt PH
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from north at west located at apt ph, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt PH
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from north at east located at apt ph, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt PH
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from north at west located at apt ph, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt PH
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from north at west located at apt ph, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt PH
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt ph, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt PH
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Oct 12, 2022
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the 1st room from north at east located at apt ph lower level, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt PH
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt ph lower level, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt PH
Open — First no access to re- inspect violation - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door entrance and rear metal security gate located at apt ph, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt PH
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 2, 2021
Open — Info nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall and ceiling. in the 1st room from east located at apt ph, 1st story, 1st apartment from south at west
Aug 10, 2019 · Apt PH
Open — Not complied with - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd room from east at south located at apt ph, 1st story, 1st apartment from south at west
Aug 10, 2019 · Apt PH
Open — Not complied with - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and east wall in the 1st room from east located at apt ph upper level, 1st story, 1st apartment from south at west
Aug 10, 2019 · Apt PH
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall. in the bathroom located at apt ph upper level, 1st story, 1st apartment from south at west
Aug 10, 2019 · Apt PH
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceiling. in the bathroom located at apt ph lower level, 1st story, 1st apartment from south at west
Aug 10, 2019 · Apt PH
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... evidence of mold at ceiling in the 1st room from north at west located at apt ph, 1st story, 1st apartment from south at west
Aug 10, 2019 · Apt PH
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... evidence of mold at ceiling in the 1st room from north at west located at apt ph, 1st story, 1st apartment from south at west original violation 13221316 issued 10-aug-19 has been upgraded to class c per administrative code §27-2017.3a(5)(a) or (b).
Aug 10, 2019 · Apt PH
Open — Notice of issuance sent to tenant - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 8, 2019
Open — Info nov sent out - CImmediately hazardous
Abate the nuisance consisting of un capped radiator control valve in the 1st room from north at east located at apt ph upper level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Not complied with - BHazardous
Provide adequate supply of cold water for the fixtures no volume to all plumbing fixtures in the bathroom located at apt ph lower level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Second no access to re-inspect violation - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at ceiling approximately 10 square feet in the 1st room from north at west located at apt ph lower level, 1st story, 1st apartment from south at west original violation 13000349 issued 03-apr-19 has been upgraded to class c per administrative code ''''27-2017.3a(5)(a) or (b).
Apr 3, 2019 · Apt PH
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at shower compartment in the bathroom located at apt ph lower level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Second no access to re-inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at ceramic tile at shower compartment in the bathroom located at apt ph lower level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Second no access to re-inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceiling in the bathroom located at apt ph lower level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Second no access to re-inspect violation - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt ph lower level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Second no access to re-inspect violation - ANon-hazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt ph lower level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Second no access to re-inspect violation - BHazardous
Provide adequate supply of hot water for the fixtures no volume to all plumbing fixtures in the bathroom located at apt ph lower level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Second no access to re-inspect violation - BHazardous
Replace the broken or defective bath tub in the bathroom located at apt ph lower level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Second no access to re-inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling approximately 10 square feet in the 1st room from north at west located at apt ph lower level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd room from north at west located at apt ph lower level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceiling in the 1st room from north at east located at apt ph lower level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at shower compartment in the bathroom located at apt ph upper level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall and ceiling in the 1st room from north at east located at apt ph upper level, 1st story, 1st apartment from south at west
Apr 3, 2019 · Apt PH
Open — Not complied with - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 22, 2018
Open — Info nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 18, 2018 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and east wall in the 1st room from east located at apt 1, 1st story, apartment at west
Jan 18, 2018 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling ,in the east center 2 room located at apt 1, 1st story, apartment at west
Jan 18, 2018 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the east center 2 room located at apt 1, 1st story, apartment at west
Jan 18, 2018 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1, 1st story, apartment at west
Jan 18, 2018 · Apt 1
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at wash basin bathtub and water closet in the bathroom located at apt 1, 1st story, apartment at west
Jan 18, 2018 · Apt 1
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin and bathtub in the bathroom located at apt 1, 1st story, apartment at west
Jan 18, 2018 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing bathtub in the bathroom located at apt 1, 1st story, apartment at west
Jan 18, 2018 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall and south wall in the bathroom located at apt 1, 1st story, apartment at west
Jan 18, 2018 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from east at south located at apt 1, 1st story, apartment at west
Jan 18, 2018 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... approx 4 square feet at ceiling in the 2nd room from east at south located at apt 1, 1st story, apartment at west
Jan 18, 2018 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and east wall in the 1st room from east located at apt 1 upper level, 1st story, apartment at west
Jan 18, 2018 · Apt 1
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Hazardous
Failure to maintian ( defect ) leaning creacked defective block retaining wall approx 25' x 5' x 6; high at rear of building. remedy - obtian approvals and permit to replace mentioned retaining wall at rear
Jan 9, 2002 · Penalty $2,000
Active - Hazardous
Failure to maintain. ( defect) leaning, cracked, defective block retaining wall approx 25' x 5' to 6' height rear of building. remedy - obtain approvals and permit to repalce
Nov 20, 2001 · Penalty $800
Active
Complaints
- Heat/hot water
Entire building
Jan 16, 2018 · Apt 1
Close - Paint/plaster
Ceiling
Jan 16, 2018 · Apt PVT
Close - Heat/hot water
Entire building
Jan 16, 2018 · Apt PVT
Close
Sales history
No recorded sales in our data
Building details
- Building type
- One-family home (A1)
- Year built
- 1925
- Floors
- 2.5
- Residential units
- 1
- Building area
- 1,764 ft²
- Lot area
- 5,129 ft²
- Zoning
- R3A
- Community board
- 210
- Council district
- 13
- Block / lot
- 5579 / 14
- Assessed value
- $47,520
- Landmark / historic district
- No
Questions about 447 Quincy Avenue
Who owns 447 Quincy Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Rolfi Alonzo.
Does 447 Quincy Avenue have violations?
Yes. NYC HPD has recorded 54 housing violations at this property.
Is 447 Quincy Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 447 Quincy Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 447 Quincy Avenue?
It has 1 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.