719 East 242 Street
Bronx, NY 10470BBL 2-05115-0015Map
Owner of record: Ogboe, Bright
719 East 242 Street is a walk-up apartment building built in 1931 in Bronx, 10470. It has 4 residential units across 2 floors. The owner of record is Ogboe, Bright. HPD has recorded 686 housing violations here, most recently on October 20, 2026. 48 of the 50 most recent violations are still open.
- HPD violations
- 686
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 371
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 686
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story
Oct 20, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 2nd story
Oct 20, 2026
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at public hall, 2nd story
Oct 20, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Oct 20, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Oct 20, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 20, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Oct 20, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at east located at apt 2b, 2nd story, 1st apartment from west at north
Sep 14, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations not functioning in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north
Sep 14, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at entrance door at public hall, 1st story
Sep 14, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 2b, 2nd story, 1st apartment from west at north
Sep 14, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixture at ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Sep 14, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north
Sep 14, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Sep 14, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Sep 14, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective base cabinet floor under sink in the kitchen located at apt 2b, 2nd story, 1st apartment from east at south
Aug 24, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Aug 24, 2026 · Apt 2B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Aug 24, 2026 · Apt 2B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 2b, 2nd story, 1st apartment from east at south
Aug 24, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from north located at apt 2b, 2nd story, 1st apartment from east at south
Aug 24, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective covering at entire roof
Aug 24, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 2nd story
Aug 24, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 2nd story
Aug 24, 2026
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceiling at public hall, 2nd story
Aug 24, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Jul 1, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Jul 1, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system basement entrance gate locked at boiler room
Jul 1, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Jul 1, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Jul 1, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Jul 1, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at wash basin in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Jul 1, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective window lock at 1st and 2nd window from north at east in the 2nd room from north located at apt 1r, 1st story, 1st apartment from west at north
Jul 1, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Jul 1, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at south wall in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Jul 1, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 1r, 1st story, 1st apartment from west at north
Jul 1, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Jul 1, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at bulkhead ceiling and east wall at public hall, 2nd story
May 19, 2026
Open — Not complied with - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at bulkhead ceiling and east wall at public hall, 2nd story
May 19, 2026
Open — Not complied with - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the foyer located at apt 2r, 2nd story, 1st apartment from north at east
May 19, 2026 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
May 19, 2026 · Apt 2R
Open — First no access to re- inspect violation - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
May 19, 2026 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 2r, 2nd story, 1st apartment from north at east
May 19, 2026 · Apt 2R
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east located at apt 2r, 2nd story, 1st apartment from north at east
May 19, 2026 · Apt 2R
Open — First no access to re- inspect violation - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at east yard , 1st story
May 18, 2026
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving at east yard , 1st story
May 18, 2026
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
Failure to maintain building in code compliant manner. observed all windows in apt#1r have window guards screwed in. no second means of egress., repair and/or replace; remove at least one window guard in bedroo
Aug 29, 2023 · Penalty $3,125
Active
Complaints
- Electric
No lighting
Oct 19, 2026 · Apt 2B
Open - Plumbing
Bathtub/shower
Oct 19, 2026 · Apt 2B
Open - Water leak
Heavy flow
Oct 19, 2026 · Apt 2B
Open - Heat/hot water
Apartment only
Oct 19, 2026 · Apt 2B
Open - Heat/hot water
Entire building
Sep 25, 2026 · Apt 2R
Close - Heat/hot water
Entire building
Sep 25, 2026 · Apt 2R
Close - Plumbing
Water supply
Sep 24, 2026 · Apt 2B
Open - Plumbing
Water supply
Sep 10, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Sep 9, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Aug 27, 2026 · Apt 2R
Close
Show 40 more ↓
- Door/window
Door
Aug 27, 2026 · Apt 2R
Close - Electric
Power outage
Aug 18, 2026 · Apt 2B
Close - Water leak
Slow leak
Aug 18, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jul 1, 2026 · Apt 1R
Close - Unsanitary condition
Pests
Jul 1, 2026 · Apt 1R
Close - General
Cabinet
Jul 1, 2026 · Apt 1R
Close - Plumbing
Basin/sink
Jul 1, 2026 · Apt 1R
Close - Plumbing
Water supply
Jun 19, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Jun 17, 2026 · Apt 2R
Close - Unsanitary condition
Mold
May 18, 2026 · Apt 2R
Close - Paint/plaster
Ceiling
May 18, 2026 · Apt 2R
Close - Electric
Outlet/switch
May 18, 2026 · Apt 2R
Close - Water leak
Heavy flow
May 18, 2026 · Apt 2R
Close - Unsanitary condition
Pests
May 6, 2026 · Apt 2R
Close - Paint/plaster
Ceiling
May 6, 2026 · Apt 2R
Close - Plumbing
Bathtub/shower
May 6, 2026 · Apt 2R
Close - Heat/hot water
Apartment only
May 6, 2026 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
May 5, 2026 · Apt 2R
Close - Plumbing
Bathtub/shower
May 5, 2026 · Apt 2R
Close - Water leak
Slow leak
May 5, 2026 · Apt 2R
Close - Paint/plaster
Ceiling
May 5, 2026 · Apt 2R
Close - Heat/hot water
Apartment only
May 5, 2026 · Apt 2R
Close - Unsanitary condition
Pests
May 5, 2026 · Apt 2R
Close - Flooring/stairs
Floor
Apr 22, 2026 · Apt 1F
Close - Appliance
Refrigerator
Apr 22, 2026 · Apt 1F
Close - Door/window
Window frame
Apr 22, 2026 · Apt 1F
Close - General
Cabinet
Apr 22, 2026 · Apt 1F
Close - Door/window
Window frame
Apr 16, 2026 · Apt 1F
Close - General
Cabinet
Apr 16, 2026 · Apt 1F
Close - Unsanitary condition
Pests
Apr 16, 2026 · Apt 1F
Close - Door/window
Door
Mar 30, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Mar 30, 2026 · Apt 2R
Close - Heat/hot water
Apartment only
Mar 18, 2026 · Apt 2R
Close - Water leak
Heavy flow
Mar 18, 2026 · Apt 2R
Close - Heat/hot water
Apartment only
Mar 12, 2026 · Apt 2
Close - Water leak
Heavy flow
Mar 12, 2026 · Apt 2
Close - Door/window
Door
Mar 5, 2026 · Apt 2R
Close - Heat/hot water
Apartment only
Mar 5, 2026 · Apt 2R
Close - Water leak
Heavy flow
Mar 5, 2026 · Apt 2R
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1931
- Floors
- 2
- Residential units
- 4
- Building area
- 3,460 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5
- Community board
- 212
- Council district
- 11
- Block / lot
- 5115 / 15
- Assessed value
- $315,000
- Landmark / historic district
- No
HPD registration #217673, last renewed Apr 24, 2025.
Questions about 719 East 242 Street
Who owns 719 East 242 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ogboe, Bright.
Does 719 East 242 Street have violations?
Yes. NYC HPD has recorded 686 housing violations at this property.
Is 719 East 242 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 719 East 242 Street built?
City records list 1931 as the year it was built.
How many apartments are in 719 East 242 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.