4325 Boyd Avenue
Bronx, NY 10466BBL 2-05049-0065Map
Owner of record: Williams, Karl Oliver
4325 Boyd Avenue is a two-family home built in 1910 in Bronx, 10466. It has 2 residential units across 2 floors. The owner of record is Williams, Karl Oliver. HPD has recorded 52 housing violations here, most recently on November 24, 2025. 10 of the 50 most recent violations are still open.
- HPD violations
- 52
- DOB violations
- 0
- ECB violations
- 5
- HPD complaints
- 53
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 52
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2025
Open — Info nov sent out - BHazardous
Properly repair or replace the broken or defective ...electrical outlet at south wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from north at east
Sep 9, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ...at north wall closet electrical light fixture at ceiling in the 3rd room from east located at apt 1, 1st story, 1st apartment from north at east
Sep 9, 2024 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jun 30, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling of the 1st closet from west at north wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from south at west
Jun 30, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor around the radiator at south wall in the 4th room from east at south located at apt 1, 1st story, 1st apartment from south at west
Jun 30, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of rodents rats in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jun 20, 2024 · Apt 1
Open — Defect letter issued - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
Jun 20, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
Jun 20, 2024 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 1, 1st story, 1st apartment from south at west
Jun 20, 2024 · Apt 1
Open — Nov sent out
Show 40 more ↓
- BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jun 20, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective window latch at north wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Jun 20, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective rotten wooden floor in the 4th room from east at south located at apt 1, 1st story, 1st apartment from south at west
Jun 20, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
May 9, 2024 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
May 9, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
May 9, 2024 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, 1st door frame from north at east wall, west wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
May 9, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ...at west wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Apr 24, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ...wood base sink cabinet doors in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Apr 24, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ...wood floors in the 4th room from east at south located at apt 1, 1st story, 1st apartment from south at west
Apr 24, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Mar 15, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Mar 15, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the missing door sweep at door in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Mar 15, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ...wood cabinet moulding at east wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jan 26, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ...cracked glass pane sliding shower door in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Jan 26, 2024 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st apartment from north at east
Dec 14, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding 130 degrees at fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Dec 13, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Dec 13, 2023 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Dec 13, 2023 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door lock and assembly in the entrance located at apt 1, 1st story, 1st apartment from south at west
Dec 13, 2023 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Dec 7, 2023 · Apt 1
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Nov 19, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 1, 1st story, 1st apartment from north at east
Nov 19, 2023 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the 3rd room from east located at apt 1, 1st story, 1st apartment from north at east
Nov 19, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 4th room from east at south located at apt 1, 1st story, 1st apartment from north at east
Nov 19, 2023 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Nov 19, 2023 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom system from entrance door to the building to intercom panel at south wall in the foyer located at apt 1, 1st story, 1st apartment from north at east
Nov 19, 2023 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall wall, north wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from north at east
Nov 19, 2023 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective morteese lock at the door in the entrance located at apt 1, 1st story, 1st apartment from south at west
Oct 19, 2023 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tile at south wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Oct 19, 2023 · Apt 1
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Oct 19, 2023 · Apt 1
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Oct 19, 2023 · Apt 1
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Aug 28, 2023 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Aug 28, 2023 · Apt 1
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jul 25, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jul 24, 2023 · Apt 1
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the construction debris, garbage bags and bathroom fixtures 1st yard from east at south, 1st story
Jul 24, 2023
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jul 24, 2023 · Apt 1
Closed — Violation closed - ANon-hazardous
Refit lower window sash in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
Jul 24, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures no gas supply to gas range in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jul 24, 2023 · Apt 1
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 5
- Class - 2
Provision of law 28-204.1 failure to comply with commissioner's order to certify correction for violation numbers 3465792z,34478753z and 34271102r. rem: certify correction.
May 13, 2009 · Penalty $8,000
Resolve - Hazardous
Violation of parking regualtions in a residential district noted: violating condition at side driveway of premise dead storage of an unlicenced passenger vehicle with no plates. remedy: conform to parking
Dec 13, 2007
Resolve - Non-hazardous
Occupancy contrary to that allowed by the building dept. records. records- legal 2 family o.s. parking garage. now illegaly- dead storage of1 unlic. motor vehicle: green volkswagon. tire missing (note:
Jun 10, 2005 · Penalty $2,500
Resolve - Non-hazardous
Illegal use in a residential district repair of cars at rear and in garages auto parts hoods fenders bumpers. total 6 cars. remedy: discontinue illegal use.
Apr 11, 2005 · Penalty $2,500
Resolve - Non-hazardous
Illegal use in residential district.illegal use:in that of using rear garage as an auto repair and spray.storage of over ten motor vehicles.residential type district:r4.remdy:discontinue illegal use!
Apr 25, 2001 · Penalty $240
Resolve
Complaints
- Electric
Outlet/switch
Aug 27, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Jul 13, 2024 · Apt 1
Close - Flooring/stairs
Floor
Jun 15, 2024 · Apt 1
Close - Water leak
Slow leak
Jun 15, 2024 · Apt 1
Close - Unsanitary condition
Pests
Jun 15, 2024 · Apt 1
Close - Unsanitary condition
Pests
Jun 14, 2024 · Apt 1
Close - Flooring/stairs
Floor
Jun 14, 2024 · Apt 1
Close - Water leak
Slow leak
Jun 14, 2024 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
May 3, 2024 · Apt 1
Close - Unsanitary condition
Mold
May 3, 2024 · Apt 1
Close
Show 40 more ↓
- General
Cabinet
Apr 23, 2024 · Apt 1
Close - Flooring/stairs
Floor
Apr 23, 2024 · Apt 1
Close - Water leak
Heavy flow
Apr 23, 2024 · Apt 1
Close - Door/window
Door
Mar 14, 2024 · Apt 1
Close - Paint/plaster
Ceiling
Mar 14, 2024 · Apt 1
Close - Unsanitary condition
Pests
Mar 14, 2024 · Apt 1
Close - General
Ventilation system
Mar 14, 2024 · Apt 1
Close - Unsanitary condition
Mold
Mar 14, 2024 · Apt 1
Close - Electric
Outlet/switch
Mar 14, 2024 · Apt 1
Close - Paint/plaster
Wall
Mar 14, 2024 · Apt 1
Close - Unsanitary condition
Pests
Mar 14, 2024 · Apt 1
Close - Door/window
Door to dumbwaiter
Jan 23, 2024 · Apt 1
Close - General
Bell/buzzer/intercom
Jan 23, 2024 · Apt 1
Close - Plumbing
Bathtub/shower
Jan 23, 2024 · Apt 1
Close - General
Cabinet
Jan 23, 2024 · Apt 1
Close - Paint/plaster
Wall
Jan 23, 2024 · Apt 1
Close - Electric
Power outage
Dec 14, 2023 · Apt GROUND
Close - Heat/hot water
Apartment only
Dec 14, 2023 · Apt GROUND
Close - Electric
Power outage
Dec 13, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Dec 13, 2023 · Apt 1
Close - Heat/hot water
Entire building
Dec 11, 2023 · Apt 1
Close - Door/window
Window pane
Nov 30, 2023 · Apt 1
Close - General
Bell/buzzer/intercom
Nov 30, 2023 · Apt 1
Close - Paint/plaster
Ceiling
Nov 30, 2023 · Apt 1
Close - Door/window
Door
Nov 30, 2023 · Apt 1
Close - Safety
Carbon monoxide detector
Nov 30, 2023 · Apt 1
Close - Paint/plaster
Ceiling
Nov 30, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Nov 23, 2023 · Apt 1
Close - Door/window
Door
Nov 21, 2023 · Apt 1
Close - Plumbing
Radiator
Nov 21, 2023 · Apt 1
Close - Door/window
Door
Nov 9, 2023 · Apt 1
Close - Safety
Carbon monoxide detector
Nov 9, 2023 · Apt 1
Close - Safety
Smoke detector
Nov 9, 2023 · Apt 1
Close - General
Bell/buzzer/intercom
Nov 9, 2023 · Apt 1
Close - Unsanitary condition
Mold
Nov 9, 2023 · Apt 1
Close - Unsanitary condition
Mold
Oct 17, 2023 · Apt 1
Close - Unsanitary condition
Pests
Oct 17, 2023 · Apt 1
Close - Door/window
Door
Oct 17, 2023 · Apt 1
Close - General
Cooking gas
Aug 1, 2023 · Apt 1
Close - Water leak
Damp spot
Aug 1, 2023 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1910
- Floors
- 2
- Residential units
- 2
- Building area
- 2,340 ft²
- Lot area
- 4,208 ft²
- Zoning
- R4-1
- Community board
- 212
- Council district
- 11
- Block / lot
- 5049 / 65
- Assessed value
- $55,680
- Landmark / historic district
- No
HPD registration #715221, last renewed Oct 11, 2024.
Questions about 4325 Boyd Avenue
Who owns 4325 Boyd Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Williams, Karl Oliver.
Does 4325 Boyd Avenue have violations?
Yes. NYC HPD has recorded 52 housing violations at this property.
Is 4325 Boyd Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 4325 Boyd Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 4325 Boyd Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.