roofy

940 East 230 Street

Bronx, NY 10466BBL 2-04865-0084Map

Owner of record: Brown, Roy

940 East 230 Street is a walk-up apartment building built in 1932 in Bronx, 10466. It has 5 residential units across 2 floors. The owner of record is Brown, Roy. HPD has recorded 96 housing violations here, most recently on October 21, 2026. 50 of the 50 most recent violations are still open.

HPD violations
96
DOB violations
0
ECB violations
2
HPD complaints
92

What to know

Concern
17 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 21, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 96

  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower window sash glass pane in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Notice of issuance sent to tenant
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall, 1st window frame from west at north wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from south at west wall door frame, 1st door from east at south wall, 1st door frame from east at south wall in the foyer located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door in the foyer located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door and make self closing at public hall, 2nd story

    Oct 21, 2026

    Open — Nov sent out
Show 40 more ↓
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective latch and its assembly at bulk head door at public hall, 2nd story

    Oct 21, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of construction material and household items on stairs leading to bulkhead door at public hall, 2nd story

    Oct 21, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 21, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Oct 21, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Oct 21, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 21, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of construction tools and construction material at public hall, 1st story

    Oct 21, 2026

    Open — Nov sent out
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balcony, and all components at east wall at fire escape

    Oct 21, 2026

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Violation open
  • B

    Properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective glass pane at door at south wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, ceiling in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from south at west wall, 2nd riser from south at west wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Oct 21, 2026 · Apt 1

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at public hall, 2nd story

    Oct 21, 2026

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over the ceiling in the private hallway located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules mssing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective inoperable hinges in the foyer located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood base cabinet south wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective lower window sash glass pane in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical light fixture at ceilig in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower window sash spring balance at north wall in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over the ceiling in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower window sash spring balance in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective door glass pane at south in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north

    Sep 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at at ceiling atnvestibule at public hall, 1st story

    Sep 18, 2026

    Open — Nov sent out
  • B

    Refit building door hitting frame not closing properly at vestibule to public hall at public hall, 1st story

    Sep 18, 2026

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 2

  • Class - 2

    Failure to comply with commissioners order contained in summons/violation #35244958r issue on 06/30/17,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certifica

    Mar 12, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.noted:at front facade,exposure 1,horizontal cracks along window lintels at 1st and 2ndstory.also deflection rusting of window lintels observed throughout.at

    Jun 30, 2017 · Penalty $500

    Active

Complaints

  • Unsanitary condition

    Pests

    Oct 20, 2026 · Apt 1

    Close
  • Electric

    No lighting

    Oct 20, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Oct 20, 2026 · Apt 1

    Close
  • Water leak

    Heavy flow

    Oct 20, 2026 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Oct 20, 2026 · Apt 1

    Close
  • General

    Cabinet

    Oct 20, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Oct 20, 2026 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Oct 20, 2026 · Apt 1

    Close
  • Paint/plaster

    Wall

    Oct 20, 2026 · Apt 1

    Close
  • Door/window

    Door

    Oct 20, 2026 · Apt 1

    Close
Show 40 more ↓
  • Unsanitary condition

    Garbage/recycling storage

    Oct 15, 2026 · Apt 1

    Open
  • General

    Cabinet

    Oct 14, 2026 · Apt 1

    Close
  • Door/window

    Door

    Oct 14, 2026 · Apt 1

    Close
  • Electric

    No lighting

    Oct 14, 2026 · Apt 1

    Close
  • Water leak

    Heavy flow

    Oct 14, 2026 · Apt 1

    Close
  • Door/window

    Door

    Oct 14, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Oct 14, 2026 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Oct 14, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Oct 14, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Oct 14, 2026 · Apt 1

    Close
  • Door/window

    Window pane

    Oct 14, 2026 · Apt 1

    Close
  • Safety

    Smoke detector

    Oct 14, 2026 · Apt 1

    Close
  • Electric

    Lighting

    Oct 14, 2026 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Oct 14, 2026 · Apt 1

    Close
  • Electric

    Lighting

    Oct 14, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Oct 14, 2026 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Oct 14, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Oct 14, 2026 · Apt 1

    Close
  • Paint/plaster

    Wall

    Oct 14, 2026 · Apt 1

    Close
  • Safety

    Carbon monoxide detector

    Oct 14, 2026 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Oct 14, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Oct 8, 2026 · Apt 1

    Close
  • General

    Cabinet

    Oct 8, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Oct 8, 2026 · Apt 1

    Close
  • Electric

    Lighting

    Oct 8, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Oct 8, 2026 · Apt 1

    Close
  • Paint/plaster

    Wall

    Oct 8, 2026 · Apt 1

    Close
  • Electric

    Outlet/switch

    Oct 8, 2026 · Apt 1

    Close
  • Door/window

    Door

    Oct 8, 2026 · Apt 1

    Close
  • Safety

    Carbon monoxide detector

    Oct 8, 2026 · Apt 1

    Close
  • Safety

    Smoke detector

    Oct 8, 2026 · Apt 1

    Close
  • Paint/plaster

    Wall

    Oct 8, 2026 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Oct 8, 2026 · Apt 1

    Close
  • Water leak

    Slow leak

    Oct 8, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Oct 8, 2026 · Apt 1

    Close
  • General

    Cabinet

    Sep 23, 2026 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Sep 23, 2026 · Apt 1

    Close
  • Safety

    Smoke detector

    Sep 23, 2026 · Apt 1

    Close
  • Paint/plaster

    Wall

    Sep 23, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Sep 23, 2026 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1932
Floors
2
Residential units
5
Building area
3,894 ft²
Lot area
5,471 ft²
Zoning
R4
Community board
212
Council district
12
Block / lot
4865 / 84
Assessed value
$348,750
Landmark / historic district
No

HPD registration #217344, last renewed Sep 25, 2024.

Questions about 940 East 230 Street

Who owns 940 East 230 Street?

The owner of record in NYC Department of City Planning PLUTO data is Brown, Roy.

Does 940 East 230 Street have violations?

Yes. NYC HPD has recorded 96 housing violations at this property.

Is 940 East 230 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 940 East 230 Street built?

City records list 1932 as the year it was built.

How many apartments are in 940 East 230 Street?

It has 5 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.