roofy

954 East 228 Street

Bronx, NY 10466BBL 2-04863-0079Map

Owner of record: 954 East 228 Manager LLC

954 East 228 Street is a walk-up apartment building built in 1931 in Bronx, 10466. It has 4 residential units across 3 floors. The owner of record is 954 East 228 Manager LLC. HPD has recorded 332 housing violations here, most recently on October 22, 2026. 13 of the 50 most recent violations are still open.

HPD violations
332
DOB violations
0
ECB violations
1
HPD complaints
315

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 22, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 332

  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall and east wall in the 1st room from north located at apt 1f, 1st story, 1st apartment from north at east

    Oct 22, 2026 · Apt 1F

    Open — Violation open
  • A

    Cleanse to the satisfaction of this department the mold on the tiles at south wall in the bathroom located at apt 1f, 1st story, 1st apartment from north at east

    Oct 22, 2026 · Apt 1F

    Open — Violation open
  • B

    Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1f, 1st story, 1st apartment from north at east

    Oct 22, 2026 · Apt 1F

    Open — Violation open
  • B

    Refit door at entrance in the entrance located at apt 1f, 1st story, 1st apartment from north at east

    Oct 22, 2026 · Apt 1F

    Open — Violation open
  • A

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1f, 1st story, 1st apartment from north at east

    Oct 22, 2026 · Apt 1F

    Open — Violation open
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from north at east

    Oct 22, 2026 · Apt 1F

    Open — Violation open
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Mar 7, 2026

    Open — Invalid certification
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from north at east

    Mar 7, 2026 · Apt 1F

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1f, 1st story, 1st apartment from north at east

    Mar 7, 2026 · Apt 1F

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1f, 1st story, 1st apartment from north at east

    Mar 7, 2026 · Apt 1F

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1f, 1st story, 1st apartment from north at east

    Mar 7, 2026 · Apt 1F

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1f, 1st story, 1st apartment from north at east

    Mar 7, 2026 · Apt 1F

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1f, 1st story, 1st apartment from north at east

    Mar 7, 2026 · Apt 1F

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 3, 2022

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... at west wall approx 3 sq ft in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    Jul 14, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    Jul 14, 2022 · Apt 1R

    Open — Nov certified late
  • C

    Replace or repair the self-closing doors that is missing or defective adjust hinges in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    Jul 14, 2022 · Apt 1R

    Open — Nov sent out
  • C

    Properly repair the broken or defective heavy duty lockset and it's assembly at building entrance door , 1st story

    Jul 14, 2022

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... at west wall approx 3 sq ft in the kitchen located at apt 1r, 1st story, 1st apartment from east at south original violation 15275044 issued 14-jul-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jul 14, 2022 · Apt 1R

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective commercial floor tiles at public hall, 2nd story

    May 24, 2022

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective rotten wood floor at public hall, 2nd story

    May 24, 2022

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    Sep 20, 2021 · Apt 1R

    Closed — Violation dismissed
  • B

    Remove the illegal fastening key operated double cylinder lock at storm gate at front areaway, 1st story

    Jul 22, 2021

    Closed — Violation closed
  • C

    Properly repair the broken or defective mortice lock at building entrance door , 1st story

    Jul 22, 2021

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective sink base cabinet in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    Jul 22, 2021 · Apt 1R

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice located at apt 1r, 1st story, 1st apartment from east at south

    Jul 22, 2021 · Apt 1R

    Open — Not complied with
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • I

    The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property

    Feb 1, 2021

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system lock door at boiler room

    Dec 21, 2019

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Dec 21, 2019 · Apt 2

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jul 17, 2019

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yard

    Apr 25, 2019

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective regrout ceramic tiles around bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1R

    Closed — Violation closed
  • B

    Replace the broken or defective washbasin in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wooden base cabinet doors in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1R

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Apr 12, 2019

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing located at apt 1r, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1R

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the riser in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1R

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approx 3 sq. ft of mold at all walls in the private hallway located at apt 1r, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1R

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approx 3 sq. ft of mold at all walls in the private hallway located at apt 1r, 1st story, 1st apartment from south at west original violation 13014089 issued 12-apr-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Apr 12, 2019 · Apt 1R

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ..

    Mar 11, 2019

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing sign at public hall, 1st story

    Mar 11, 2019

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Mar 11, 2019

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Mar 11, 2019

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Mar 11, 2019

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Mar 11, 2019

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles on north wall at westiblue , 1st story

    Feb 26, 2019

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at vestiblue , 1st story

    Feb 26, 2019

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 1

  • Class - 2

    Failure to maintain bldg in code- compliant manner @time of insp @the above address on the above date.i observed in apt 1r on 1st fl leaking waste line in kitchen & leaking water under bathroom sink also no wat

    May 29, 2018 · Penalty $1,562

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Oct 14, 2026 · Apt 1F

    Close
  • Flooring/stairs

    Floor

    Oct 14, 2026 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Oct 14, 2026 · Apt 1F

    Close
  • Plumbing

    Radiator

    Oct 14, 2026 · Apt 1F

    Close
  • Door/window

    Door

    Oct 14, 2026 · Apt 1F

    Close
  • Plumbing

    Bathtub/shower

    Oct 14, 2026 · Apt 1F

    Close
  • Door/window

    Window frame

    Oct 14, 2026 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Oct 14, 2026 · Apt 1F

    Close
  • Door/window

    Door

    Oct 14, 2026 · Apt 1F

    Open
  • Door/window

    Door frame

    Oct 14, 2026 · Apt 1F

    Open
Show 40 more ↓
  • Door/window

    Door

    Sep 18, 2026 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Sep 18, 2026 · Apt 1F

    Close
  • Door/window

    Window frame

    Sep 18, 2026 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Sep 18, 2026 · Apt 1F

    Close
  • Flooring/stairs

    Floor

    Sep 18, 2026 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Sep 7, 2026 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Sep 7, 2026 · Apt 1F

    Close
  • Door/window

    Door frame

    May 14, 2026 · Apt 1F

    Close
  • Plumbing

    Bathtub/shower

    May 11, 2026 · Apt 1F

    Close
  • Door/window

    Door

    May 8, 2026 · Apt F1

    Close
  • Door/window

    Window frame

    May 8, 2026 · Apt F1

    Close
  • Heat/hot water

    Apartment only

    Mar 19, 2026 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Mar 13, 2026 · Apt 1F

    Close
  • Door/window

    Window frame

    Mar 13, 2026 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Mar 13, 2026 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Mar 13, 2026 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Mar 5, 2026 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Mar 5, 2026 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Mar 5, 2026 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Mar 5, 2026 · Apt 1F

    Close
  • Plumbing

    Radiator

    Nov 17, 2025 · Apt 3RDFLO

    Close
  • Electric

    No lighting

    Nov 17, 2025 · Apt 3RDFLO

    Close
  • Plumbing

    Bathtub/shower

    Nov 17, 2025 · Apt 3RDFLO

    Close
  • Door/window

    Window frame

    Nov 17, 2025 · Apt 3RDFLO

    Close
  • Door/window

    Door

    Nov 17, 2025 · Apt 3RDFLO

    Close
  • Electric

    No lighting

    Nov 17, 2025 · Apt 3RDFLO

    Close
  • Unsanitary condition

    Mold

    Sep 8, 2025 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Sep 8, 2025 · Apt 1F

    Close
  • Unsanitary condition

    Sewage

    Sep 8, 2025 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Sep 8, 2025 · Apt 1F

    Close
  • Unsanitary condition

    Mold

    Jun 16, 2025 · Apt 1F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 14, 2023 · Apt 3

    Close
  • Door/window

    Window pane

    Jan 14, 2023 · Apt 3

    Close
  • Door/window

    Door

    Jan 14, 2023 · Apt 3

    Close
  • Paint/plaster

    Wall

    Jan 14, 2023 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2022 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Nov 15, 2022 · Apt 3FLOOR

    Close
  • Door/window

    Door

    Aug 29, 2022 · Apt PBLC

    Close
  • Door/window

    Door

    Aug 29, 2022 · Apt PBLC

    Close
  • Safety

    Fire escape

    Aug 29, 2022 · Apt PBLC

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1931
Floors
3
Residential units
4
Building area
2,746 ft²
Lot area
3,630 ft²
Zoning
R4
Community board
212
Council district
12
Block / lot
4863 / 79
Assessed value
$234,450
Landmark / historic district
No

HPD registration #217250, last renewed Oct 16, 2025.

Questions about 954 East 228 Street

Who owns 954 East 228 Street?

The owner of record in NYC Department of City Planning PLUTO data is 954 East 228 Manager LLC.

Does 954 East 228 Street have violations?

Yes. NYC HPD has recorded 332 housing violations at this property.

Is 954 East 228 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 954 East 228 Street built?

City records list 1931 as the year it was built.

How many apartments are in 954 East 228 Street?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.