roofy

961 East 224 Street

Bronx, NY 10466BBL 2-04860-0013Map

Owner of record: 961 East 224th St LLC

961 East 224 Street is a walk-up apartment building built in 1925 in Bronx, 10466. It has 3 residential units across 2 floors. The owner of record is 961 East 224th St LLC. HPD has recorded 180 housing violations here, most recently on November 13, 2025. 27 of the 50 most recent violations are still open.

HPD violations
180
DOB violations
2
ECB violations
8
HPD complaints
145

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Nov 13, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 180

  • C

    M/d law abate the nuisance consisting of scalding hot water at 140 degrees at fixtures in the entire apartment located at bsmt-apt 1, 1st bsmt-apt from east at south

    Nov 13, 2025 · Apt 1

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system in basement locked door at boiler room

    Nov 13, 2025

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at bsmt-apt 1groun, 1st bsmt-apt from east at south

    Nov 13, 2025 · Apt 1GROUN

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... more than 10 sq.ft at ceiling and east wall at public hall, 1st story

    Aug 19, 2025

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq.ft at ceiling and east wall at public hall, 1st story original violation 18169615 issued 19-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Aug 19, 2025

    Open — First no access to re- inspect violation
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall

    Aug 19, 2025

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall

    Aug 19, 2025

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Aug 19, 2025

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Aug 19, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall

    Aug 19, 2025

    Open — Nov sent out
Show 40 more ↓
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Aug 19, 2025

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Aug 19, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 1st story

    Aug 19, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant materials at ceiling and east wall at public hall, 1st story

    Aug 19, 2025

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling (less than 30 sq ft) at public hall, 1st story original violation 18162392 issued 15-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Aug 15, 2025

    Open — First no access to re- inspect violation
  • A

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling (less than 30 sq ft) at public hall, 1st story

    Aug 15, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch set at building entrance door at public hall, 1st story

    Aug 15, 2025

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Jun 3, 2025 · Apt 1

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Jun 3, 2025 · Apt 1

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the private hallway located at apt 1, 1st story, 1st apartment from north at east

    Jun 3, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 2nd room from north located at apt 1, 1st story, 1st apartment from north at east

    Jun 3, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 2nd room from north located at apt 1, 1st story, 1st apartment from north at east

    Jun 3, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Jun 3, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Jun 3, 2025 · Apt 1

    Open — Nov sent out
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Sep 15, 2024

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at south yard yard, 1st story

    Sep 15, 2024

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2024

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Closed — Violation dismissed
  • B

    Replace with new the missing gasket at refrigerator door in the kitchen located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .... in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 4th room from north, the 5th room from north, the bathroom , the foyer , the 3rd room from north located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 2nd room from north at west located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 1st room from north at west located at apt 1f, 1st story, 1st apartment from west at north

    May 12, 2023 · Apt 1F

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 16, 2023

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective brick and mortar joints at south parapet wall building front

    Feb 23, 2023

    Open — Not complied with
  • B

    Repair or replace the smoke detector defective located at bsmt-apt 1, 1st bsmt-apt from north at east

    Feb 23, 2023 · Apt 1

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at bsmt-apt 1, 1st bsmt-apt from north at east

    Feb 23, 2023 · Apt 1

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt 1, 1st bsmt-apt from north at east

    Feb 23, 2023 · Apt 1

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at bsmt-apt 1, 1st bsmt-apt from north at east

    Feb 23, 2023 · Apt 1

    Closed — Violation closed
  • B

    Properly repair the broken or defective electrical outlet at east wall in the 2nd room from north located at bsmt-apt 1, 1st bsmt-apt from north at east

    Feb 23, 2023 · Apt 1

    Open — Not complied with
  • A

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at bsmt-apt 1, 1st bsmt-apt from north at east

    Dec 7, 2022 · Apt 1

    Closed — Violation dismissed
  • C

    Remove all obstructions from water closet ... in the bathroom located at bsmt-apt 1, 1st bsmt-apt from north at east

    Dec 7, 2022 · Apt 1

    Closed — Violation closed

DOB building violations · 2

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 16, 2022

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 6, 2017

    Dob violation - active

ECB violations · 8

  • Class - 2

    Failure to comply with commissioner's order contained in summons/violation #35581935l issued 4/24/21 and file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain building.remedy:

    Mar 7, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain bldg in codecompliant manner.as noted:atoi@rear observed sec of finished concrete (illegible) aprx6"x4'@rearyd.failure to maintain bldg in codecompliant manner causes serious&safety hazard f

    Nov 24, 2021 · Penalty $6,250

    Active
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation #35257458n issued on 06/16/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for:work without a permi

    Nov 22, 2017 · Penalty $2,400

    Active
  • Class - 1

    Work w/out permit.failure to comply with the commissioners order contained in summons/violation #35257458n issued on 06/16/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.note:a

    Oct 14, 2017 · Penalty $6,000

    Active
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35257458n issued on 06/16/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's order &/or file

    Sep 5, 2017 · Penalty $2,400

    Active
  • Class - 1

    Work without a permit;noted:at basement level erected full height partition walls subdividing the class"a"apt. creating an additional class "a" apt at front with one bedroom,additional kitchen & bathroom.instal

    Jun 16, 2017 · Penalty $1,600

    Active
  • Class - 2

    Residence altered for occupancy as a dwelling for more than the legally approved # of families. noted: dob's records indicates a 4 family residence 1st & 2nd fl(dwellings)basement(dwelling)residence has been

    Jun 16, 2017 · Penalty $1,200

    Active
  • Class - 2

    Occupancy in contrary to that allowed by c/o or dob records. legal class "a" apt at basement converted into a 2nd illegal class "a" apt by subdividing the legal apt w/ a full bathroom and kitchen increasing bui

    Apr 2, 2017 · Penalty $1,230

    Active

Complaints

  • Plumbing

    Water supply

    Nov 14, 2025 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Nov 12, 2025 · Apt 1GROUN

    Close
  • Heat/hot water

    Apartment only

    Nov 12, 2025 · Apt 1GROUN

    Close
  • Unsanitary condition

    Pests

    Nov 12, 2025 · Apt 1GROUN

    Close
  • Paint/plaster

    Wall

    Nov 12, 2025 · Apt 1GROUN

    Close
  • Unsanitary condition

    Pests

    Nov 12, 2025 · Apt 1GROUN

    Close
  • Unsanitary condition

    Sewage

    Nov 12, 2025 · Apt 1GROUN

    Close
  • Plumbing

    Basin/sink

    Aug 15, 2025 · Apt 1F

    Close
  • Door/window

    Door

    Aug 15, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Aug 15, 2025 · Apt BLDG

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Aug 15, 2025 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Aug 15, 2025 · Apt 1F

    Close
  • Safety

    Window guard broken/missing

    Aug 15, 2025 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Aug 15, 2025 · Apt 1F

    Close
  • Door/window

    Window pane

    Aug 15, 2025 · Apt 1F

    Close
  • Safety

    Carbon monoxide detector

    Aug 15, 2025 · Apt 1F

    Close
  • Door/window

    Door

    Aug 15, 2025 · Apt 1F

    Close
  • Door/window

    Door

    Aug 15, 2025 · Apt BLDG

    Close
  • Door/window

    Door

    Aug 15, 2025 · Apt 1F

    Close
  • Safety

    Smoke detector

    Aug 15, 2025 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Aug 15, 2025 · Apt 1F

    Close
  • Appliance

    Electric/gas range

    May 31, 2025 · Apt 1

    Close
  • Paint/plaster

    Wall

    May 31, 2025 · Apt BASEME

    Close
  • Appliance

    Refrigerator

    May 31, 2025 · Apt BASEME

    Close
  • Appliance

    Electric/gas range

    May 31, 2025 · Apt BASEME

    Close
  • Flooring/stairs

    Floor

    May 31, 2025 · Apt BASEME

    Close
  • Unsanitary condition

    Pests

    May 31, 2025 · Apt BASEME

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 31, 2025 · Apt BASEME

    Close
  • Paint/plaster

    Wall

    May 31, 2025 · Apt BASEME

    Close
  • Paint/plaster

    Wall

    Mar 8, 2025 · Apt 1BASEM

    Close
  • Water leak

    Damp spot

    Mar 8, 2025 · Apt 1BASEM

    Close
  • Appliance

    Electric/gas range

    Mar 8, 2025 · Apt 1BASEM

    Close
  • Heat/hot water

    Apartment only

    Nov 4, 2024 · Apt 1

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 18, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 18, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    May 2, 2023 · Apt 1F

    Close
  • Door/window

    Door

    May 2, 2023 · Apt 1F

    Close
  • Appliance

    Refrigerator

    May 2, 2023 · Apt 1F

    Close
  • Door/window

    Door

    May 2, 2023 · Apt 1F

    Close
  • Plumbing

    Toilet

    May 2, 2023 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    May 2, 2023 · Apt 1F

    Close
  • Paint/plaster

    Wall

    May 2, 2023 · Apt 1F

    Close
  • Flooring/stairs

    Floor

    May 2, 2023 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    May 2, 2023 · Apt 1F

    Close
  • Paint/plaster

    Wall

    May 2, 2023 · Apt 1F

    Close
  • Flooring/stairs

    Floor

    Apr 28, 2023 · Apt 1F

    Close
  • Appliance

    Refrigerator

    Apr 28, 2023 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Apr 28, 2023 · Apt 1F

    Close
  • Door/window

    Door

    Apr 28, 2023 · Apt 1F

    Close
  • Flooring/stairs

    Floor

    Apr 28, 2023 · Apt 1F

    Close

Sales history

DatePriceTypeUnits
Nov 24, 2025$650,000Three family dwellings3

Building details

Building type
Walk-up apartment building (C0)
Year built
1925
Floors
2
Residential units
3
Building area
3,630 ft²
Lot area
5,471 ft²
Zoning
R4
Community board
212
Council district
12
Block / lot
4860 / 13
Assessed value
$64,140
Landmark / historic district
No

HPD registration #214122, last renewed Dec 5, 2025.

Questions about 961 East 224 Street

Who owns 961 East 224 Street?

The owner of record in NYC Department of City Planning PLUTO data is 961 East 224th St LLC.

Does 961 East 224 Street have violations?

Yes. NYC HPD has recorded 180 housing violations at this property.

Is 961 East 224 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 961 East 224 Street built?

City records list 1925 as the year it was built.

How many apartments are in 961 East 224 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.