roofy

806 East 233 Street

Bronx, NY 10466BBL 2-04857-0084Map

Owner of record: Privott-Yeiser, Amira

806 East 233 Street is a walk-up apartment building built in 1920 in Bronx, 10466. It has 3 residential units across 2 floors. The owner of record is Privott-Yeiser, Amira. HPD has recorded 128 housing violations here, most recently on April 1, 2026. 38 of the 50 most recent violations are still open.

HPD violations
128
DOB violations
0
ECB violations
1
HPD complaints
120

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 1, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 128

  • B

    Properly repair or replace the broken or defective electrical light swith at south wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective electrical light switch at south wall in the 1st room from north located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood base cabinet at south wall in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd private hallway from north located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 5th room from north at west located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ,,, in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Repair leaky water closet flush pipe connection .. in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). east wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in drain pipe under washbain in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 5th room from north at west located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
  • A

    Properly repair with similar material the broken or defective porcelain finish at bathtub in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Replace with new the missing electrical outlet cover plate at south wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Remove the illegal double cylinder key operated locking device at door .... in the entrance located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of slidable bolt with an eye capable of being padlock at door in the entrance located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Remove the illegal double cylinder key operated locking device at door leading to side yard at west from the 2nd private hallway from north located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the foyer located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective due to inoperable hinges at door in the entrance located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective due to inoperable hinges at exit door in the 2nd private hallway from north located at apt 1r, 1st story, 2nd apartment from east at south

    Jan 6, 2026 · Apt 1R

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 18, 2025

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, south wall, east wall in the 1st room from north located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at south wall in the 1st room from north located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 5th room from north at east located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Not complied with
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective porcelain glaze at the bath tub in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the 3rd private hallway from north located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the 5th room from north at east located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 5th room from north at west located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Not complied with
  • C

    Properly repair or replace the broken or defective hydronic baseboard heater cover missing in the 5th room from north at east located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Not complied with
  • C

    Properly repair or replace the broken or defective hydronic baseboard heater missing cover in the 2nd room from north located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective hydronic baseboard heater missing cover in the foyer located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Violation will be reinspected
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall, south wall, west wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from north located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the 5th room from north at west located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the 5th room from north at east located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective electrical outlet switch cover plate at the south wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south

    Nov 6, 2025 · Apt 1R

    Open — Not complied with

DOB building violations · 0

No DOB violations on record

ECB violations · 1

  • Class - 3

    Found 4 weil mclain boilers model# eco tec-110 not signed off under permit # x08049493, maintain boiler; pull permit bring job up to currentcode and call for inspection.

    Apr 6, 2026 · Penalty $500

    Active

Complaints

  • Appliance

    Refrigerator

    Apr 17, 2026 · Apt 1R

    Open
  • Appliance

    Electric/gas range

    Apr 17, 2026 · Apt 1R

    Open
  • Electric

    Outlet/switch

    Apr 17, 2026 · Apt 1R

    Open
  • Paint/plaster

    Wall

    Apr 17, 2026 · Apt 1R

    Open
  • Flooring/stairs

    Floor

    Apr 17, 2026 · Apt 1R

    Open
  • Plumbing

    Toilet

    Apr 17, 2026 · Apt 1R

    Open
  • Plumbing

    Bathtub/shower

    Mar 21, 2026 · Apt 1R

    Close
  • Door/window

    Window frame

    Mar 21, 2026 · Apt 1R

    Close
  • Plumbing

    Toilet

    Mar 21, 2026 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Mar 21, 2026 · Apt 1R

    Close
Show 40 more ↓
  • Flooring/stairs

    Floor

    Mar 21, 2026 · Apt 1R

    Close
  • Appliance

    Refrigerator

    Mar 21, 2026 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Mar 21, 2026 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Mar 21, 2026 · Apt 1R

    Close
  • Appliance

    Electric/gas range

    Mar 21, 2026 · Apt 1R

    Close
  • Plumbing

    Toilet

    Mar 21, 2026 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Dec 22, 2025 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    Dec 22, 2025 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Dec 22, 2025 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Dec 22, 2025 · Apt 1R

    Close
  • Door/window

    Window frame

    Dec 22, 2025 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    Dec 22, 2025 · Apt 1R

    Close
  • Plumbing

    Toilet

    Dec 22, 2025 · Apt 1R

    Close
  • Appliance

    Refrigerator

    Dec 22, 2025 · Apt 1R

    Close
  • Electric

    Lighting

    Dec 22, 2025 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Dec 22, 2025 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Dec 22, 2025 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Nov 5, 2025 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Nov 5, 2025 · Apt 1R

    Close
  • Appliance

    Refrigerator

    Nov 5, 2025 · Apt 1R

    Close
  • Plumbing

    Toilet

    Nov 5, 2025 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    Nov 5, 2025 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Nov 5, 2025 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Nov 5, 2025 · Apt 1R

    Close
  • Appliance

    Electric/gas range

    Nov 5, 2025 · Apt 1R

    Close
  • Electric

    Outlet/switch

    Nov 5, 2025 · Apt 1R

    Close
  • Door/window

    Door

    Sep 2, 2025 · Apt 1R

    Close
  • Plumbing

    Toilet

    Sep 2, 2025 · Apt 1R

    Close
  • General

    Cabinet

    Sep 2, 2025 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    Sep 2, 2025 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    Sep 2, 2025 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Sep 2, 2025 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Sep 2, 2025 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    Sep 2, 2025 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Sep 2, 2025 · Apt 1R

    Close
  • Appliance

    Refrigerator

    Sep 2, 2025 · Apt 1R

    Close
  • Door/window

    Door

    Aug 25, 2025 · Apt NA

    Close
  • Door/window

    Door

    Aug 25, 2025 · Apt NA

    Close
  • Door/window

    Door

    Aug 25, 2025 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Aug 25, 2025 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1920
Floors
2
Residential units
3
Building area
3,960 ft²
Lot area
3,000 ft²
Zoning
R5D
Community board
212
Council district
11
Block / lot
4857 / 84
Assessed value
$57,240
Landmark / historic district
No

HPD registration #217446, last renewed Jan 7, 2026.

Questions about 806 East 233 Street

Who owns 806 East 233 Street?

The owner of record in NYC Department of City Planning PLUTO data is Privott-Yeiser, Amira.

Does 806 East 233 Street have violations?

Yes. NYC HPD has recorded 128 housing violations at this property.

Is 806 East 233 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 806 East 233 Street built?

City records list 1920 as the year it was built.

How many apartments are in 806 East 233 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.