806 East 233 Street
Bronx, NY 10466BBL 2-04857-0084Map
Owner of record: Privott-Yeiser, Amira
806 East 233 Street is a walk-up apartment building built in 1920 in Bronx, 10466. It has 3 residential units across 2 floors. The owner of record is Privott-Yeiser, Amira. HPD has recorded 128 housing violations here, most recently on April 1, 2026. 38 of the 50 most recent violations are still open.
- HPD violations
- 128
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 120
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 128
- BHazardous
Properly repair or replace the broken or defective electrical light swith at south wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective electrical light switch at south wall in the 1st room from north located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood base cabinet at south wall in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd private hallway from north located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from north at west located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ,,, in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Repair leaky water closet flush pipe connection .. in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). east wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in drain pipe under washbain in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Apr 1, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from north at west located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective porcelain finish at bathtub in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Replace with new the missing electrical outlet cover plate at south wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door .... in the entrance located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of slidable bolt with an eye capable of being padlock at door in the entrance located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door leading to side yard at west from the 2nd private hallway from north located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the foyer located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective due to inoperable hinges at door in the entrance located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective due to inoperable hinges at exit door in the 2nd private hallway from north located at apt 1r, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 1R
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, south wall, east wall in the 1st room from north located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at south wall in the 1st room from north located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from north at east located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Not complied with - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective porcelain glaze at the bath tub in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 3rd private hallway from north located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the 5th room from north at east located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from north at west located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective hydronic baseboard heater cover missing in the 5th room from north at east located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective hydronic baseboard heater missing cover in the 2nd room from north located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Not complied with - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective hydronic baseboard heater missing cover in the foyer located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Violation will be reinspected - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall, south wall, west wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from north located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the 5th room from north at west located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the 5th room from north at east located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective electrical outlet switch cover plate at the south wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south
Nov 6, 2025 · Apt 1R
Open — Not complied with
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 3
Found 4 weil mclain boilers model# eco tec-110 not signed off under permit # x08049493, maintain boiler; pull permit bring job up to currentcode and call for inspection.
Apr 6, 2026 · Penalty $500
Active
Complaints
- Appliance
Refrigerator
Apr 17, 2026 · Apt 1R
Open - Appliance
Electric/gas range
Apr 17, 2026 · Apt 1R
Open - Electric
Outlet/switch
Apr 17, 2026 · Apt 1R
Open - Paint/plaster
Wall
Apr 17, 2026 · Apt 1R
Open - Flooring/stairs
Floor
Apr 17, 2026 · Apt 1R
Open - Plumbing
Toilet
Apr 17, 2026 · Apt 1R
Open - Plumbing
Bathtub/shower
Mar 21, 2026 · Apt 1R
Close - Door/window
Window frame
Mar 21, 2026 · Apt 1R
Close - Plumbing
Toilet
Mar 21, 2026 · Apt 1R
Close - Paint/plaster
Wall
Mar 21, 2026 · Apt 1R
Close
Show 40 more ↓
- Flooring/stairs
Floor
Mar 21, 2026 · Apt 1R
Close - Appliance
Refrigerator
Mar 21, 2026 · Apt 1R
Close - Paint/plaster
Ceiling
Mar 21, 2026 · Apt 1R
Close - Plumbing
Basin/sink
Mar 21, 2026 · Apt 1R
Close - Appliance
Electric/gas range
Mar 21, 2026 · Apt 1R
Close - Plumbing
Toilet
Mar 21, 2026 · Apt 1R
Close - Paint/plaster
Wall
Dec 22, 2025 · Apt 1R
Close - Flooring/stairs
Floor
Dec 22, 2025 · Apt 1R
Close - Unsanitary condition
Pests
Dec 22, 2025 · Apt 1R
Close - Plumbing
Bathtub/shower
Dec 22, 2025 · Apt 1R
Close - Door/window
Window frame
Dec 22, 2025 · Apt 1R
Close - Flooring/stairs
Floor
Dec 22, 2025 · Apt 1R
Close - Plumbing
Toilet
Dec 22, 2025 · Apt 1R
Close - Appliance
Refrigerator
Dec 22, 2025 · Apt 1R
Close - Electric
Lighting
Dec 22, 2025 · Apt 1R
Close - Paint/plaster
Wall
Dec 22, 2025 · Apt 1R
Close - Paint/plaster
Ceiling
Dec 22, 2025 · Apt 1R
Close - Unsanitary condition
Pests
Nov 5, 2025 · Apt 1R
Close - Plumbing
Bathtub/shower
Nov 5, 2025 · Apt 1R
Close - Appliance
Refrigerator
Nov 5, 2025 · Apt 1R
Close - Plumbing
Toilet
Nov 5, 2025 · Apt 1R
Close - Flooring/stairs
Floor
Nov 5, 2025 · Apt 1R
Close - Paint/plaster
Wall
Nov 5, 2025 · Apt 1R
Close - Paint/plaster
Wall
Nov 5, 2025 · Apt 1R
Close - Appliance
Electric/gas range
Nov 5, 2025 · Apt 1R
Close - Electric
Outlet/switch
Nov 5, 2025 · Apt 1R
Close - Door/window
Door
Sep 2, 2025 · Apt 1R
Close - Plumbing
Toilet
Sep 2, 2025 · Apt 1R
Close - General
Cabinet
Sep 2, 2025 · Apt 1R
Close - Flooring/stairs
Floor
Sep 2, 2025 · Apt 1R
Close - Flooring/stairs
Floor
Sep 2, 2025 · Apt 1R
Close - Unsanitary condition
Pests
Sep 2, 2025 · Apt 1R
Close - Paint/plaster
Wall
Sep 2, 2025 · Apt 1R
Close - Flooring/stairs
Floor
Sep 2, 2025 · Apt 1R
Close - Plumbing
Bathtub/shower
Sep 2, 2025 · Apt 1R
Close - Appliance
Refrigerator
Sep 2, 2025 · Apt 1R
Close - Door/window
Door
Aug 25, 2025 · Apt NA
Close - Door/window
Door
Aug 25, 2025 · Apt NA
Close - Door/window
Door
Aug 25, 2025 · Apt 1
Close - Unsanitary condition
Pests
Aug 25, 2025 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1920
- Floors
- 2
- Residential units
- 3
- Building area
- 3,960 ft²
- Lot area
- 3,000 ft²
- Zoning
- R5D
- Community board
- 212
- Council district
- 11
- Block / lot
- 4857 / 84
- Assessed value
- $57,240
- Landmark / historic district
- No
HPD registration #217446, last renewed Jan 7, 2026.
Questions about 806 East 233 Street
Who owns 806 East 233 Street?
The owner of record in NYC Department of City Planning PLUTO data is Privott-Yeiser, Amira.
Does 806 East 233 Street have violations?
Yes. NYC HPD has recorded 128 housing violations at this property.
Is 806 East 233 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 806 East 233 Street built?
City records list 1920 as the year it was built.
How many apartments are in 806 East 233 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.