roofy

866 East 232 Street

Bronx, NY 10466BBL 2-04856-0087Map

Owner of record: Brody, Zalman L

866 East 232 Street is a walk-up apartment building built in 1910 in Bronx, 10466. It has 3 residential units across 2 floors. The owner of record is Brody, Zalman L. HPD has recorded 162 housing violations here, most recently on September 23, 2026. 50 of the 50 most recent violations are still open.

HPD violations
162
DOB violations
2
ECB violations
8
HPD complaints
124

What to know

Concern
19 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 23, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 162

  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Civ14 mailed
  • C

    Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from north at east located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Civ14 mailed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 3rd room from north at west located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, east wall in the 3rd room from north at east located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the bathroom located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). east wall in the private hallway located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from south at west wall, 1st window frame from south at west wall in the kitchen located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the foyer located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
Show 40 more ↓
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from north at east located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from north at east located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective window frame casing and sill at east wall in the 3rd room from north at east located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less than 30 sq ft at south wall in the 1st room from north at east located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door frame from east at south wall in the 1st room from north at east located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from north at east located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, north wall in the bathroom located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the foyer located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door frame, 1st closet from south at west wall door, ceiling in the private hallway located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door frame, 1st window frame from north at east wall, west wall, baseboard at west wall, baseboard at east wall in the 3rd room from north at east located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at east wall in the kitchen located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st window frame from east at south wall in the 3rd room from north at west located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 1 r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1 R

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective east wood window frame casing and sill in the 3rd room from north at east located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at west wall, baseboard at east wall in the 2nd terrace from east at center located at apt 1r

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 2nd terrace from east at center located at apt 1r

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door frame, 1st window frame from north at east wall in the 2nd terrace from east at center located at apt 1r

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the 1st room from north at east located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from north at east located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less than 30 sq ft at south wall in the 1st room from north at east located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
  • C

    Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from north at east located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the 1st room from north at east located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from south at west wall, 1st window frame from south at west wall in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood base cabinets at sink in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at east wall in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling and south wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 23, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing signage at public hall, 1st story

    Aug 11, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings signage missing

    Aug 11, 2026

    Open — Nov sent out
  • B

    Remove the illegal fastening double cylinder lock at entrance gate , 1st story

    Aug 11, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story

    Aug 11, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Aug 11, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 11, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system signage missing at public hall, 1st story

    Aug 11, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 11, 2026

    Open — Nov sent out

DOB building violations · 2

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 1, 2014

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 15, 2012

    Dob violation - active

ECB violations · 8

  • Class - 2

    Failure to maintain building in code-compliant manner. noted:at time of inspection at exposure 3 of above premises,observed construction debris and garbage(lough,stove,ref) scattered all over the rear yard. gar

    Sep 4, 2019

    Resolve
  • Class - 2

    Work w/o a permit. work noted: at the basement level installed direct fresh air ductwork from crawl space to the boiler. installed water & waste lines for 3pc bathroom & residential sink. partially removed clas

    Jul 28, 2014

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in notice of violation #35014058h issued on 10/05/13 for work w/o a permit @ bsmt installed plumb,elect and partitions.rem:comply with the commissioners

    Apr 1, 2014

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in nov #35014058h issued on 10.5.13 for work w/o a permit at basement installed plumbing, electric & partitions. remedy: comply w/the commissioner's order.

    Dec 30, 2013

    Resolve
  • Class - 1

    Work w/o a permit.note: at basement level full height partition walls illegally erected at various locations creating an illegal class"a"aptwith 3pc bathroom, kitchen with gas stove and bedrooms.rmdy:obtain a

    Oct 5, 2013

    Resolve
  • Class - 1

    Unlawful acts. failure to comply w/an order of the commissioner.note: vacate order #169/2009 was issued with ecb #34811745p for basement,andat time of inspection observed basement is converted into a class"a"

    Oct 5, 2013 · Penalty $2,400

    Resolve
  • Class - 3

    Failure to maintain bldg walls or appurtenances. antena on the roof & the chimney metal (screen) top are noth displaced,loose & in danger offalling. remedy: maintain bldg: make all necessary repairs.

    Nov 9, 2012 · Penalty $100

    Active
  • Class - 1

    Occupancy contrary to that allowed by building dept records. noted: basement occupied as a class'a' apt. center of apt has un enclosed boiler room w/o direct fresh air intake. ceilings throughout are substandar

    Nov 16, 2009 · Penalty $2,400

    Resolve

Complaints

  • Water leak

    Slow leak

    Sep 21, 2026 · Apt 1R

    Close
  • Electric

    Lighting

    Sep 21, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Sep 21, 2026 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Sep 21, 2026 · Apt 1R

    Close
  • Appliance

    Electric/gas range

    Sep 21, 2026 · Apt 2NDFLO

    Close
  • Electric

    No lighting

    Sep 21, 2026 · Apt 2NDFLO

    Close
  • Electric

    Outlet/switch

    Sep 21, 2026 · Apt 2NDFLO

    Close
  • Electric

    Lighting

    Sep 21, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Mold

    Sep 21, 2026 · Apt 1R

    Close
  • Electric

    Power outage

    Sep 9, 2026 · Apt 1F

    Close
Show 40 more ↓
  • Appliance

    Electric/gas range

    Aug 5, 2026 · Apt 2NDFL

    Close
  • Door/window

    Window frame

    Aug 5, 2026 · Apt 2NDFL

    Close
  • Electric

    Outlet/switch

    Aug 5, 2026 · Apt 2NDFL

    Close
  • Plumbing

    Bathtub/shower

    Aug 5, 2026 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Aug 5, 2026 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Aug 5, 2026 · Apt 2NDFL

    Close
  • Flooring/stairs

    Floor

    Aug 5, 2026 · Apt 2NDFL

    Close
  • Electric

    Power outage

    Aug 5, 2026 · Apt 2NDFL

    Close
  • Unsanitary condition

    Mold

    Aug 5, 2026 · Apt 2NDFL

    Close
  • Unsanitary condition

    Mold

    Aug 4, 2026 · Apt 2FL

    Close
  • Flooring/stairs

    Stairs

    Aug 4, 2026 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Aug 4, 2026 · Apt 2FL

    Close
  • Appliance

    Electric/gas range

    Aug 4, 2026 · Apt 2FL

    Close
  • Unsanitary condition

    Mold

    Aug 4, 2026 · Apt 2FL

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 4, 2026 · Apt 2FL

    Close
  • Flooring/stairs

    Floor

    Aug 3, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Mold

    Aug 3, 2026 · Apt 2NDFLO

    Close
  • Paint/plaster

    Wall

    Aug 3, 2026 · Apt 2NDFLO

    Close
  • Plumbing

    Water supply

    Feb 8, 2026 · Apt 2NDFL

    Close
  • Plumbing

    Water supply

    Feb 7, 2026 · Apt 1R

    Close
  • Plumbing

    Water supply

    Feb 7, 2026 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Dec 30, 2025 · Apt SECOND

    Close
  • Outside building

    Gutter/leader

    Dec 30, 2025 · Apt SECOND

    Close
  • Door/window

    Door frame

    Dec 30, 2025 · Apt SECOND

    Close
  • Flooring/stairs

    Floor

    Dec 11, 2025 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Dec 11, 2025 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Dec 11, 2025 · Apt 2F

    Close
  • Door/window

    Window frame

    Dec 11, 2025 · Apt 2F

    Close
  • Flooring/stairs

    Stairs

    Dec 11, 2025 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Dec 11, 2025 · Apt 2F

    Close
  • Flooring/stairs

    Floor

    Dec 11, 2025 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Dec 11, 2025 · Apt 2F

    Close
  • Door/window

    Door frame

    Dec 11, 2025 · Apt 2F

    Close
  • Door/window

    Door

    Dec 24, 2024 · Apt 2FLOOR

    Close
  • Paint/plaster

    Wall

    Dec 24, 2024 · Apt 2FLOOR

    Close
  • Unsanitary condition

    Mold

    Dec 24, 2024 · Apt 2FLOOR

    Close
  • Flooring/stairs

    Floor

    Dec 24, 2024 · Apt 2FLOOR

    Close
  • Paint/plaster

    Cabinet

    Dec 24, 2024 · Apt 2FLOOR

    Close
  • Electric

    Lighting

    Dec 24, 2024 · Apt 2FLOOR

    Close
  • Unsanitary condition

    Mold

    Dec 10, 2024 · Apt 2NDFLO

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1910
Floors
2
Residential units
3
Building area
1,792 ft²
Lot area
4,013 ft²
Zoning
R5D
Community board
212
Council district
11
Block / lot
4856 / 87
Assessed value
$45,300
Landmark / historic district
No

HPD registration #212152, last renewed Aug 5, 2025.

Questions about 866 East 232 Street

Who owns 866 East 232 Street?

The owner of record in NYC Department of City Planning PLUTO data is Brody, Zalman L.

Does 866 East 232 Street have violations?

Yes. NYC HPD has recorded 162 housing violations at this property.

Is 866 East 232 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 866 East 232 Street built?

City records list 1910 as the year it was built.

How many apartments are in 866 East 232 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.