830 East 230 Street
Bronx, NY 10466BBL 2-04854-0068Map
Owner of record: Toribio, Ynes
830 East 230 Street is a walk-up apartment building built in 1930 in Bronx, 10466. It has 3 residential units across 2 floors. The owner of record is Toribio, Ynes. HPD has recorded 198 housing violations here, most recently on October 17, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 198
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 121
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 198
- BHazardous
Properly repair or replace the broken or defective door frame casing at building entrance at public hall, 1st story
Oct 17, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Oct 17, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Oct 17, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Oct 17, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective light fixtures at ceiling and electrical outlets at walls in the 3rd room from north at east located at apt 1r, 1st story, 1st apartment from east at south
Oct 17, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of electrical cords used to tap electrical power from the basement to the kitchen in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Oct 17, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlets at west wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Oct 17, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base cabinets at sink in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Oct 17, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures range in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Oct 17, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective the entrance door to bldg at public hall, 1st story
Oct 10, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Oct 10, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation all steam radiators and riser pipes in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Oct 10, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceilings walls doors and trim in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Oct 10, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all ceilings and walls in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Oct 10, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 10, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Oct 10, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Sep 19, 2026
Open — Nov sent out - BHazardous
Refit building entrance door , 1st story
Sep 19, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the bathroom , the kitchen , the 1st room from north, the 2nd room from north located at apt 1r, 1st story, 1st apartment from east at south
May 22, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
May 22, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
May 22, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
May 22, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
May 22, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
May 17, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall
May 17, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
May 17, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
May 17, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
May 17, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
May 17, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
May 17, 2026
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
May 17, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Replace the broken or defective wash basin in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
May 17, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked gate at front of building at west
May 17, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
May 17, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
May 17, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Apr 17, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system locked door at north entrance to cellar at boiler room
Apr 17, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood base cabinet at west wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Apr 17, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Apr 17, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - BHazardous
Replace the broken or defective wash basin at west wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Apr 17, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair the broken or defective connection drain pipe under sink in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Apr 17, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Apr 17, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from north, the 1st room from north located at apt 1r, 1st story, 1st apartment from east at south
Apr 17, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Apr 17, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Apr 8, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
Apr 8, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Apr 8, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Apr 8, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall
Apr 8, 2026
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
Occupancy in contrary to that allowed by c/o and/or department of building record.illegal conversion of class a apartment to sro with bathroom,gas stove.2nd means of egress provided.vacate not warrented.rem:dis
Jan 13, 2024 · Penalty $6,250
Active
Complaints
- Heat/hot water
Apartment only
Oct 9, 2026 · Apt 1R
Close - Appliance
Electric/gas range
Oct 9, 2026 · Apt 1R
Close - Door/window
Door
Oct 9, 2026 · Apt 1R
Close - General
Cabinet
Oct 9, 2026 · Apt 1R
Close - Door/window
Door
Aug 10, 2026 · Apt 1R
Close - Appliance
Electric/gas range
Jun 29, 2026 · Apt 1R
Close - General
Cabinet
Jun 29, 2026 · Apt 1R
Close - Door/window
Door
Jun 29, 2026 · Apt 1R
Close - Appliance
Electric/gas range
Jun 19, 2026 · Apt 1R
Close - General
Cabinet
Jun 19, 2026 · Apt 1R
Close
Show 40 more ↓
- Door/window
Door
Jun 19, 2026 · Apt 1R
Close - General
Cooking gas
Jun 12, 2026 · Apt 1R
Close - Door/window
Door
Jun 12, 2026 · Apt 1R
Close - Door/window
Door
Jun 12, 2026 · Apt 1R
Close - Door/window
Door frame
Jun 3, 2026 · Apt 1R
Close - General
Cooking gas
Jun 1, 2026 · Apt 1R
Close - General
Cabinet
Jun 1, 2026 · Apt 1R
Close - Door/window
Door
Jun 1, 2026 · Apt 1R
Close - General
Cooking gas
May 21, 2026 · Apt 1R
Close - Door/window
Door
May 21, 2026 · Apt 1R
Close - Heat/hot water
Apartment only
May 21, 2026 · Apt 1R
Close - Electric
Outlet/switch
May 19, 2026 · Apt 1R
Close - General
Cooking gas
May 19, 2026 · Apt 1R
Close - Door/window
Door
May 19, 2026 · Apt 1R
Close - Appliance
Electric/gas range
May 16, 2026 · Apt 1R
Close - Heat/hot water
Apartment only
May 16, 2026 · Apt 1R
Close - Heat/hot water
Apartment only
Apr 17, 2026 · Apt 1R
Close - General
Cabinet
Apr 17, 2026 · Apt 1R
Close - Appliance
Electric/gas range
Apr 17, 2026 · Apt 1R
Close - General
Cooking gas
Apr 16, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 8, 2026 · Apt 1R
Close - General
Cooking gas
Apr 8, 2026 · Apt 1R
Close - Heat/hot water
Apartment only
Mar 24, 2026 · Apt 1R
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt 1R
Close - Electric
Power outage
Dec 31, 2025 · Apt 1R
Close - Heat/hot water
Entire building
Feb 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2025 · Apt 1I
Close - Heat/hot water
Entire building
Feb 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2025 · Apt 1R
Close - Electric
No lighting
Feb 5, 2025 · Apt 1R
Close - Electric
Power outage
Dec 18, 2024 · Apt 1R
Close - Appliance
Refrigerator
Aug 5, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Mar 13, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Mar 13, 2024 · Apt 1R
Close - Door/window
Door
Mar 13, 2024 · Apt 1R
Close - Paint/plaster
Ceiling
Mar 13, 2024 · Apt 1R
Close - Paint/plaster
Wall
Mar 13, 2024 · Apt 1R
Close - Unsanitary condition
Mold
Mar 13, 2024 · Apt 1R
Close - Paint/plaster
Window/frame
Mar 13, 2024 · Apt 1R
Close - Door/window
Door
Mar 13, 2024 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1930
- Floors
- 2
- Residential units
- 3
- Building area
- 2,332 ft²
- Lot area
- 2,860 ft²
- Zoning
- R5
- Community board
- 212
- Council district
- 11
- Block / lot
- 4854 / 68
- Assessed value
- $57,840
- Landmark / historic district
- No
HPD registration #217286, last renewed Jul 22, 2026.
Questions about 830 East 230 Street
Who owns 830 East 230 Street?
The owner of record in NYC Department of City Planning PLUTO data is Toribio, Ynes.
Does 830 East 230 Street have violations?
Yes. NYC HPD has recorded 198 housing violations at this property.
Is 830 East 230 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 830 East 230 Street built?
City records list 1930 as the year it was built.
How many apartments are in 830 East 230 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.