718 East 232 Street
Bronx, NY 10466BBL 2-04845-0053Map
Owner of record: Z Holdings 18 LLC
718 East 232 Street is a walk-up apartment building built in 1920 in Bronx, 10466. It has 3 residential units across 2.5 floors. The owner of record is Z Holdings 18 LLC. HPD has recorded 124 housing violations here, most recently on June 5, 2025. 43 of the 50 most recent violations are still open.
- HPD violations
- 124
- DOB violations
- 2
- ECB violations
- 1
- HPD complaints
- 60
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 124
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Oct 16, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1, 1st story, 1st apartment from north at east
Oct 13, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Oct 13, 2024 · Apt 1
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 13, 2024
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Sep 21, 2024 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st window frame from north at east wall in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st door frame from west at north wall, 1st door frame from east at south wall, south wall in the kitchen located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st window frame from north at east wall in the 4th room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 3rd window frame from east at south wall in the 5th room from north located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 and less than 30 at the ceiling in the private hallway located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 4th room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway , the 2nd room from north located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective the ceramic floor tiles in the private hallway located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 and less than 30 at the ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall, east wall in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall, west wall and the ceiling in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall and the south wall in the 2nd room from north located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from east at south wall in the 5th room from north located at apt 1, 2nd story, 1st apartment from east at south
Sep 16, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jul 18, 2024 · Apt 1
Open — Certification postponment granted - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 5th room from north, the private hallway located at apt 1, 1st story, 1st apartment from east at south
Jul 18, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall, north wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jul 18, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq ft at west wall, west wall in the 5th room from north located at apt 1, 1st story, 1st apartment from east at south
Jul 18, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, ceiling, ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jul 18, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq ft of at ceiling, ceiling in the private hallway located at apt 1, 1st story, 1st apartment from east at south
Jul 18, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1, 1st story, 1st apartment from east at south
Jul 18, 2024 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq ft of at ceiling, ceiling in the private hallway located at apt 1, 1st story, 1st apartment from east at south original violation 17127909 issued 18-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 18, 2024 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq ft at west wall, west wall in the 5th room from north located at apt 1, 1st story, 1st apartment from east at south original violation 17127911 issued 18-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 18, 2024 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 1, 2nd story, 1st apartment from north at east
May 10, 2024 · Apt 1
Open — Certification postponment denied - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from north at east
May 10, 2024 · Apt 1
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department in the ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from north at east
May 10, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department in the south wall, ceiling in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from north at east
May 10, 2024 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
May 10, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from north at east
May 10, 2024 · Apt 1
Open — Certification postponment denied - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
May 10, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at. ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from east at south
Nov 9, 2023 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, west wall, south wall, ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from east at south
Nov 9, 2023 · Apt 1
Open — Invalid certification - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at ceiling in the foyer located at apt 1, 2nd story, 1st apartment from east at south
Nov 9, 2023 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the foyer located at apt 1, 2nd story, 1st apartment from east at south
Nov 9, 2023 · Apt 1
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, north wall, south wall in the kitchen located at apt 1, 2nd story, 1st apartment from east at south
Nov 9, 2023 · Apt 1
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the 5th room from north located at apt 1, 2nd story, 1st apartment from east at south
Nov 9, 2023 · Apt 1
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, north wall, 1st closet from north at east wall door in the 4th room from north located at apt 1, 2nd story, 1st apartment from east at south
Nov 9, 2023 · Apt 1
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Nov 9, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the foyer located at apt 1, 2nd story, 1st apartment from east at south
Nov 9, 2023 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at. ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from east at south original violation 16371922 issued 09-nov-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Nov 9, 2023 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at ceiling in the foyer located at apt 1, 2nd story, 1st apartment from east at south original violation 16371927 issued 09-nov-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Nov 9, 2023 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall in the 4th room from north located at apt 1, 2nd story, 1st apartment from east at south
Nov 9, 2023 · Apt 1
Open — First no access to re- inspect violation
DOB building violations · 2
- Construction other optional
C-construction other optional
Mar 31, 2017
Dob violation - active - Construction other optional
C-construction other optional
May 10, 2012
Dob violation - active
ECB violations · 1
- Class - 2
Residence altered for occupancy as a dwelling for more than the legally approved number of families. 4 single room occupancy observed at basement. as per letter of no objection lno#1680 dwelling to be 3 family.
May 10, 2012 · Penalty $1,200
Active
Complaints
- Heat/hot water
Apartment only
Mar 25, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Oct 11, 2024 · Apt 1
Close - Water leak
Heavy flow
Sep 30, 2024 · Apt 1STFLO
Close - Unsanitary condition
Mold
Sep 20, 2024 · Apt 1
Close - Unsanitary condition
Pests
Sep 20, 2024 · Apt 1
Close - Paint/plaster
Wall
Sep 20, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Sep 20, 2024 · Apt 1
Close - Safety
Fire escape
Sep 13, 2024 · Apt 1
Close - Heat/hot water
Entire building
Aug 15, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Aug 14, 2024 · Apt 1
Close
Show 40 more ↓
- Unsanitary condition
Mold
Aug 13, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Aug 13, 2024 · Apt 1
Close - Safety
Smoke detector
Jul 15, 2024 · Apt 1
Close - Paint/plaster
Wall
Jul 15, 2024 · Apt 1
Close - Unsanitary condition
Mold
May 17, 2024 · Apt 2
Close - General
Cabinet
May 17, 2024 · Apt 2
Close - Safety
Smoke detector
May 7, 2024 · Apt 1
Close - Safety
Carbon monoxide detector
May 7, 2024 · Apt 1
Close - Paint/plaster
Wall
May 7, 2024 · Apt 1
Close - Plumbing
Water supply
Feb 13, 2024 · Apt 1
Close - Unsanitary condition
Mold
Nov 3, 2023 · Apt 1
Close - Unsanitary condition
Pests
Oct 25, 2023 · Apt 1
Close - Unsanitary condition
Pests
Oct 25, 2023 · Apt 1
Close - Unsanitary condition
Mold
Oct 25, 2023 · Apt 1
Close - Unsanitary condition
Mold
Feb 10, 2023 · Apt 1
Close - Unsanitary condition
Pests
Jan 11, 2023 · Apt 1
Close - Unsanitary condition
Mold
Jan 11, 2023 · Apt 1
Close - Heat/hot water
Entire building
Nov 16, 2022 · Apt 1
Close - Heat/hot water
Apartment only
Dec 31, 2019 · Apt 1
Close - Paint/plaster
Ceiling
Jul 5, 2018 · Apt 1
Close - Water leak
Damp spot
Jul 5, 2018 · Apt 1
Close - Water leak
Slow leak
Jul 5, 2018 · Apt 1
Close - Paint/plaster
Wall
Aug 24, 2016 · Apt 1
Close - Unsanitary condition
Mold
Aug 24, 2016 · Apt 1
Close - Door/window
Window frame
Aug 16, 2016 · Apt 3
Close - Unsanitary condition
Pests
Aug 16, 2016 · Apt 3
Close - Unsanitary condition
Mold
Aug 16, 2016 · Apt 3
Close - Door/window
Window frame
Aug 10, 2016 · Apt 3
Close - Unsanitary condition
Mold
Aug 10, 2016 · Apt 3
Close - Door/window
Window frame
Aug 10, 2016 · Apt 3
Close - Unsanitary condition
Mold
Aug 10, 2016 · Apt 3
Close - Unsanitary condition
Pests
Aug 10, 2016 · Apt 3
Close - Unsanitary condition
Pests
Aug 10, 2016 · Apt 3
Close - Paint/plaster
Wall
Aug 10, 2016 · Apt 3
Close - Paint/plaster
Wall
Aug 10, 2016 · Apt 3
Close - Paint/plaster
Wall
Aug 10, 2016 · Apt 3
Close - Heat/hot water
Apartment only
Aug 10, 2016 · Apt 3
Close - Heat/hot water
Apartment only
Jan 19, 2016 · Apt 3
Close - Unsanitary condition
Sewage
Jan 19, 2016 · Apt 3
Close - Plumbing
Bathtub/shower
Jan 19, 2016 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1920
- Floors
- 2.5
- Residential units
- 3
- Building area
- 3,680 ft²
- Lot area
- 2,867 ft²
- Zoning
- R5
- Community board
- 212
- Council district
- 11
- Block / lot
- 4845 / 53
- Assessed value
- $59,280
- Landmark / historic district
- No
HPD registration #208708, last renewed Nov 12, 2025.
Questions about 718 East 232 Street
Who owns 718 East 232 Street?
The owner of record in NYC Department of City Planning PLUTO data is Z Holdings 18 LLC.
Does 718 East 232 Street have violations?
Yes. NYC HPD has recorded 124 housing violations at this property.
Is 718 East 232 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 718 East 232 Street built?
City records list 1920 as the year it was built.
How many apartments are in 718 East 232 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.