roofy

718 East 232 Street

Bronx, NY 10466BBL 2-04845-0053Map

Owner of record: Z Holdings 18 LLC

718 East 232 Street is a walk-up apartment building built in 1920 in Bronx, 10466. It has 3 residential units across 2.5 floors. The owner of record is Z Holdings 18 LLC. HPD has recorded 124 housing violations here, most recently on June 5, 2025. 43 of the 50 most recent violations are still open.

HPD violations
124
DOB violations
2
ECB violations
1
HPD complaints
60

What to know

Concern
14 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jun 5, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 124

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Oct 16, 2024 · Apt 1

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1, 1st story, 1st apartment from north at east

    Oct 13, 2024 · Apt 1

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Oct 13, 2024 · Apt 1

    Open — Nov certified late
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Oct 13, 2024

    Open — Invalid certification
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east

    Sep 21, 2024 · Apt 1

    Open — Notice of issuance sent to tenant
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st window frame from north at east wall in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st door frame from west at north wall, 1st door frame from east at south wall, south wall in the kitchen located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st window frame from north at east wall in the 4th room from north at east located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 3rd window frame from east at south wall in the 5th room from north located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 and less than 30 at the ceiling in the private hallway located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 4th room from north at east located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway , the 2nd room from north located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective the ceramic floor tiles in the private hallway located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 and less than 30 at the ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall, east wall in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall, west wall and the ceiling in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall and the south wall in the 2nd room from north located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 2nd window frame from east at south wall in the 5th room from north located at apt 1, 2nd story, 1st apartment from east at south

    Sep 16, 2024 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south

    Jul 18, 2024 · Apt 1

    Open — Certification postponment granted
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 5th room from north, the private hallway located at apt 1, 1st story, 1st apartment from east at south

    Jul 18, 2024 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at south wall, north wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south

    Jul 18, 2024 · Apt 1

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less then 10 sq ft at west wall, west wall in the 5th room from north located at apt 1, 1st story, 1st apartment from east at south

    Jul 18, 2024 · Apt 1

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling, ceiling, ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Jul 18, 2024 · Apt 1

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less then 10 sq ft of at ceiling, ceiling in the private hallway located at apt 1, 1st story, 1st apartment from east at south

    Jul 18, 2024 · Apt 1

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1, 1st story, 1st apartment from east at south

    Jul 18, 2024 · Apt 1

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less then 10 sq ft of at ceiling, ceiling in the private hallway located at apt 1, 1st story, 1st apartment from east at south original violation 17127909 issued 18-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jul 18, 2024 · Apt 1

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... less then 10 sq ft at west wall, west wall in the 5th room from north located at apt 1, 1st story, 1st apartment from east at south original violation 17127911 issued 18-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jul 18, 2024 · Apt 1

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 1, 2nd story, 1st apartment from north at east

    May 10, 2024 · Apt 1

    Open — Certification postponment denied
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from north at east

    May 10, 2024 · Apt 1

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department in the ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from north at east

    May 10, 2024 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department in the south wall, ceiling in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from north at east

    May 10, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east

    May 10, 2024 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from north at east

    May 10, 2024 · Apt 1

    Open — Certification postponment denied
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east

    May 10, 2024 · Apt 1

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2024

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at. ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from east at south

    Nov 9, 2023 · Apt 1

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at east wall, west wall, south wall, ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from east at south

    Nov 9, 2023 · Apt 1

    Open — Invalid certification
  • A

    Trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at ceiling in the foyer located at apt 1, 2nd story, 1st apartment from east at south

    Nov 9, 2023 · Apt 1

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the foyer located at apt 1, 2nd story, 1st apartment from east at south

    Nov 9, 2023 · Apt 1

    Open — Invalid certification
  • A

    Paint with light colored paint to the satisfaction of this department at west wall, north wall, south wall in the kitchen located at apt 1, 2nd story, 1st apartment from east at south

    Nov 9, 2023 · Apt 1

    Open — Invalid certification
  • A

    Paint with light colored paint to the satisfaction of this department at south wall in the 5th room from north located at apt 1, 2nd story, 1st apartment from east at south

    Nov 9, 2023 · Apt 1

    Open — Invalid certification
  • A

    Paint with light colored paint to the satisfaction of this department at east wall, north wall, 1st closet from north at east wall door in the 4th room from north located at apt 1, 2nd story, 1st apartment from east at south

    Nov 9, 2023 · Apt 1

    Open — Invalid certification
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south

    Nov 9, 2023 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the foyer located at apt 1, 2nd story, 1st apartment from east at south

    Nov 9, 2023 · Apt 1

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at. ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from east at south original violation 16371922 issued 09-nov-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Nov 9, 2023 · Apt 1

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at ceiling in the foyer located at apt 1, 2nd story, 1st apartment from east at south original violation 16371927 issued 09-nov-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Nov 9, 2023 · Apt 1

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall in the 4th room from north located at apt 1, 2nd story, 1st apartment from east at south

    Nov 9, 2023 · Apt 1

    Open — First no access to re- inspect violation

DOB building violations · 2

  • Construction other optional

    C-construction other optional

    Mar 31, 2017

    Dob violation - active
  • Construction other optional

    C-construction other optional

    May 10, 2012

    Dob violation - active

ECB violations · 1

  • Class - 2

    Residence altered for occupancy as a dwelling for more than the legally approved number of families. 4 single room occupancy observed at basement. as per letter of no objection lno#1680 dwelling to be 3 family.

    May 10, 2012 · Penalty $1,200

    Active

Complaints

  • Heat/hot water

    Apartment only

    Mar 25, 2025 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Oct 11, 2024 · Apt 1

    Close
  • Water leak

    Heavy flow

    Sep 30, 2024 · Apt 1STFLO

    Close
  • Unsanitary condition

    Mold

    Sep 20, 2024 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Sep 20, 2024 · Apt 1

    Close
  • Paint/plaster

    Wall

    Sep 20, 2024 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Sep 20, 2024 · Apt 1

    Close
  • Safety

    Fire escape

    Sep 13, 2024 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Aug 15, 2024 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Aug 14, 2024 · Apt 1

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Aug 13, 2024 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Aug 13, 2024 · Apt 1

    Close
  • Safety

    Smoke detector

    Jul 15, 2024 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jul 15, 2024 · Apt 1

    Close
  • Unsanitary condition

    Mold

    May 17, 2024 · Apt 2

    Close
  • General

    Cabinet

    May 17, 2024 · Apt 2

    Close
  • Safety

    Smoke detector

    May 7, 2024 · Apt 1

    Close
  • Safety

    Carbon monoxide detector

    May 7, 2024 · Apt 1

    Close
  • Paint/plaster

    Wall

    May 7, 2024 · Apt 1

    Close
  • Plumbing

    Water supply

    Feb 13, 2024 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Nov 3, 2023 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Oct 25, 2023 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Oct 25, 2023 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Oct 25, 2023 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Feb 10, 2023 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Jan 11, 2023 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Jan 11, 2023 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2022 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Dec 31, 2019 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Jul 5, 2018 · Apt 1

    Close
  • Water leak

    Damp spot

    Jul 5, 2018 · Apt 1

    Close
  • Water leak

    Slow leak

    Jul 5, 2018 · Apt 1

    Close
  • Paint/plaster

    Wall

    Aug 24, 2016 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Aug 24, 2016 · Apt 1

    Close
  • Door/window

    Window frame

    Aug 16, 2016 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Aug 16, 2016 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Aug 16, 2016 · Apt 3

    Close
  • Door/window

    Window frame

    Aug 10, 2016 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Aug 10, 2016 · Apt 3

    Close
  • Door/window

    Window frame

    Aug 10, 2016 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Aug 10, 2016 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Aug 10, 2016 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Aug 10, 2016 · Apt 3

    Close
  • Paint/plaster

    Wall

    Aug 10, 2016 · Apt 3

    Close
  • Paint/plaster

    Wall

    Aug 10, 2016 · Apt 3

    Close
  • Paint/plaster

    Wall

    Aug 10, 2016 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Aug 10, 2016 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Jan 19, 2016 · Apt 3

    Close
  • Unsanitary condition

    Sewage

    Jan 19, 2016 · Apt 3

    Close
  • Plumbing

    Bathtub/shower

    Jan 19, 2016 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1920
Floors
2.5
Residential units
3
Building area
3,680 ft²
Lot area
2,867 ft²
Zoning
R5
Community board
212
Council district
11
Block / lot
4845 / 53
Assessed value
$59,280
Landmark / historic district
No

HPD registration #208708, last renewed Nov 12, 2025.

Questions about 718 East 232 Street

Who owns 718 East 232 Street?

The owner of record in NYC Department of City Planning PLUTO data is Z Holdings 18 LLC.

Does 718 East 232 Street have violations?

Yes. NYC HPD has recorded 124 housing violations at this property.

Is 718 East 232 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 718 East 232 Street built?

City records list 1920 as the year it was built.

How many apartments are in 718 East 232 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.