646 East 232 Street
Bronx, NY 10466BBL 2-04834-0063Map
Owner of record: Our Lady Of Mercy Sr. Manor Housing Deve Lop.fund
646 East 232 Street is an elevator apartment building built in 2000 in Bronx, 10466. It has 55 residential units across 6 floors. The owner of record is Our Lady Of Mercy Sr. Manor Housing Deve Lop.fund. HPD has recorded 17 housing violations here, most recently on May 7, 2026. 1 of the 17 most recent violations are still open.
- HPD violations
- 17
- DOB violations
- 20
- ECB violations
- 3
- HPD complaints
- 20
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
Jun 11, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 2nd room from east at north located at apt 405, 4th story, 3rd apartment from west at north
Jul 9, 2024 · Apt 405
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 2nd room from east at north located at apt 405, 4th story, 3rd apartment from west at north
Jul 9, 2024 · Apt 405
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 405, 4th story, 3rd apartment from west at north
Jul 9, 2024 · Apt 405
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 405, 4th story, 3rd apartment from west at north
Jul 9, 2024 · Apt 405
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 602, 6th story, 5th apartment from east at south
Mar 23, 2022 · Apt 602
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south and west walls in the 2nd room from north at west located at apt 602, 6th story, 5th apartment from east at south
Mar 23, 2022 · Apt 602
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling, south and west walls in the 2nd room from north at west located at apt 602, 6th story, 5th apartment from east at south
Mar 23, 2022 · Apt 602
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 606, 6th story, 4th apartment from west at north
Aug 28, 2021 · Apt 606
Closed — Violation dismissed
Show 7 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 606, 6th story, 4th apartment from west at north
Aug 28, 2021 · Apt 606
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak inside closet ceiling in the 1st room from north located at apt 606, 6th story, 4th apartment from west at north
Aug 28, 2021 · Apt 606
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color inside closet ceiling in the 1st room from north located at apt 606, 6th story, 4th apartment from west at north
Aug 28, 2021 · Apt 606
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east located at apt 607, 6th story, 5th apartment from east at south
Jun 11, 2021 · Apt 607
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 607, 6th story, 5th apartment from east at south
Jun 11, 2021 · Apt 607
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 307, 3rd story, 4th apartment from west at north
Dec 31, 2014 · Apt 307
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in at water closet in the bathroom located at apt 307, 3rd story, 4th apartment from west at north
Dec 31, 2014 · Apt 307
Closed — Violation closed
DOB building violations · 20
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2008
Dob violation - resolved
Show 10 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2004
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed
ECB violations · 3
- Non-hazardous
New bldg occupied w/o a valid certificate of occupancy: upon inspection bldg occupied(multi-use) dob files no c/o issued for this location. remedy: obtain valid c of d.
Feb 4, 2002
Resolve - Hazardous
Failure to provide contractors sign. upon my inspection i notice a failure to have contractors sign up. remedy: post sign.
Aug 16, 2000
Resolve - Hazardous
No approved plans on site at time of inspection. remedy: provide approved plans as per code.
Aug 16, 2000 · Penalty $500
Resolve
Complaints
- Paint/plaster
Ceiling
Jan 7, 2025 · Apt 603
Close - Heat/hot water
Apartment only
Dec 26, 2024 · Apt 603
Close - Heat/hot water
Entire building
Dec 26, 2024 · Apt 603
Close - Water leak
Heavy flow
Jun 12, 2024 · Apt 405
Close - Water leak
Heavy flow
Mar 23, 2024 · Apt 405
Close - Paint/plaster
Ceiling
Nov 11, 2021 · Apt 602
Close - Paint/plaster
Ceiling
Nov 11, 2021 · Apt 602
Close - Paint/plaster
Ceiling
Nov 11, 2021 · Apt 602
Close - Water leak
Heavy flow
Aug 22, 2021 · Apt 606
Close - Water leak
Slow leak
Apr 27, 2021 · Apt 607
Close
Show 10 more ↓
- Paint/plaster
Ceiling
Apr 27, 2021 · Apt 607
Close - Electric
Wiring
Jul 26, 2019 · Apt 301
Close - Heat/hot water
Entire building
Jan 5, 2018 · Apt 603
Close - Heat/hot water
Apartment only
Jan 3, 2018 · Apt 208
Close - Heat/hot water
Apartment only
Dec 27, 2017 · Apt 603
Close - Appliance
Electric/gas range
Dec 27, 2017 · Apt 603
Close - Heat/hot water
Entire building
Jan 9, 2017 · Apt BLDG
Close - Plumbing
Toilet
Dec 20, 2014 · Apt 307
Close - Appliance
Refrigerator
Oct 11, 2010 · Apt 205
Close - Heating
Heat related
Jan 15, 2009 · Apt 101
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2000
- Floors
- 6
- Residential units
- 55
- Building area
- 41,876 ft²
- Lot area
- 11,467 ft²
- Zoning
- R6A
- Community board
- 212
- Council district
- 11
- Block / lot
- 4834 / 63
- Assessed value
- $1,108,800
- Landmark / historic district
- No
HPD registration #223369, last renewed Sep 5, 2025.
Questions about 646 East 232 Street
Who owns 646 East 232 Street?
The owner of record in NYC Department of City Planning PLUTO data is Our Lady Of Mercy Sr. Manor Housing Deve Lop.fund.
Does 646 East 232 Street have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 646 East 232 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 646 East 232 Street built?
City records list 2000 as the year it was built.
How many apartments are in 646 East 232 Street?
It has 55 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.