687 East 226 Street
Bronx, NY 10466BBL 2-04829-0030Map
Owner of record: Z Holdings 19 LLC
687 East 226 Street is a walk-up apartment building built in 1926 in Bronx, 10466. It has 4 residential units across 2 floors. The owner of record is Z Holdings 19 LLC. HPD has recorded 209 housing violations here, most recently on June 25, 2026. 6 of the 50 most recent violations are still open.
- HPD violations
- 209
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 121
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 209
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hings at door from street to public hall at public hall, 1st story
Jun 25, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet at north and east wall in the 1st room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west
Jun 25, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Open — Defect letter issued - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from north located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective interior glass pane at lower sash window in the 3rd room from north located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from north located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 20 sq. ft. at north wall in the 2nd room from north located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at door in the entrance located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroom located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, 2nd apartment from south at west
Jun 20, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entire area at rear and east yard
Jun 18, 2024
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective broken and deteriorate roof soffit [ underside ] at east exterior and building front
Apr 28, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall public hallway 2nd story
Apr 28, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective eschutchen plate heat riser at ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 28, 2024 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 28, 2024 · Apt 2R
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall public hallway 1st story
Apr 28, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and west wall public hallway 1st story
Apr 28, 2024
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall public hallway 1st story
Apr 28, 2024
Closed — Violation dismissed - BHazardous
Replace with new the missing spark arrestor at roof chimney
Apr 28, 2024
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 28, 2024 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall public hallway 2nd story
Apr 28, 2024
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, east wall, 1st window frame from north at east wall in the kitchen located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall in the 1st room from north at east located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from west at north wall in the 1st room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from north at east wall in the foyer located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the 2nd room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wasteline pipe at wash basin in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the 2nd room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall, 1st window frame from south at west wall in the 2nd room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st medicine cabinet from east at south wall, 1st window frame from south at west wall in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood cabinet at wash basin in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, east wall, 1st window frame from north at east wall in the 1st room from north at east located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 10, 2024 · Apt 2R
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Non-hazardous
Residence has been altered for occupancy for more than the legally approved # of families. bldg dept records indicate residence is legally approved 4 families,residence now altered for occupancy by 6 families
Oct 10, 2006 · Penalty $5,300
Resolve - Non-hazardous
Work w/o a permit. work noted:installed 2 kitchens w/ gas stoves & 2 three pc bathrooms in cellar. remedy:obtain permits & restore cellar to prior legal condition.
Oct 10, 2006 · Penalty $800
Resolve
Complaints
- Plumbing
Bathtub/shower
Jun 15, 2026 · Apt 2R
Close - Appliance
Refrigerator
Jun 11, 2026 · Apt 2R
Close - Electric
Outlet/switch
Jun 11, 2026 · Apt 2R
Close - Heat/hot water
Entire building
Apr 10, 2025 · Apt BLDG
Close - Door/window
Door
Jun 20, 2024 · Apt 1R
Close - Paint/plaster
Ceiling
Jun 20, 2024 · Apt 1R
Close - Unsanitary condition
Mold
Jun 20, 2024 · Apt 1R
Close - Door/window
Window frame
Jun 18, 2024 · Apt 1R
Close - Door/window
Window pane
Jun 18, 2024 · Apt 1R
Close - Paint/plaster
Ceiling
Jun 18, 2024 · Apt 1R
Close
Show 40 more ↓
- Unsanitary condition
Mold
Jun 18, 2024 · Apt 1R
Close - Door/window
Door frame
Jun 18, 2024 · Apt 1R
Close - Unsanitary condition
Mold
May 21, 2024 · Apt 1R
Close - Paint/plaster
Door/frame
May 21, 2024 · Apt 1R
Close - Paint/plaster
Wall
May 21, 2024 · Apt 1R
Close - Paint/plaster
Ceiling
May 21, 2024 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
May 21, 2024 · Apt BLDG
Close - Door/window
Door
Apr 2, 2024 · Apt 2R
Close - Door/window
Door
Apr 2, 2024 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Mar 27, 2024 · Apt 2R
Close - Unsanitary condition
Pests
Mar 27, 2024 · Apt 2R
Close - Door/window
Door
Mar 27, 2024 · Apt 2R
Close - Heat/hot water
Entire building
Jan 28, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Jan 5, 2024 · Apt 2R
Close - Unsanitary condition
Pests
Jan 5, 2024 · Apt 2R
Close - Paint/plaster
Wall
Jan 5, 2024 · Apt 2R
Close - Plumbing
Radiator
Jan 5, 2024 · Apt 2R
Close - Heat/hot water
Entire building
Nov 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2023 · Apt 2F
Close - Electric
Power outage
Jan 31, 2023 · Apt 2R
Close - Heat/hot water
Entire building
Oct 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 11, 2022 · Apt 2F
Close - Unsanitary condition
Pests
Nov 3, 2021 · Apt 1R
Close - Unsanitary condition
Pests
Nov 3, 2021 · Apt 1R
Close - Unsanitary condition
Pests
Nov 3, 2021 · Apt 1R
Close - Paint/plaster
Wall
Oct 3, 2021 · Apt 1R
Close - Paint/plaster
Ceiling
Oct 3, 2021 · Apt 1R
Close - Unsanitary condition
Pests
Oct 3, 2021 · Apt 1R
Close - Unsanitary condition
Mold
Oct 3, 2021 · Apt 1R
Close - Paint/plaster
Door/frame
Oct 3, 2021 · Apt 1R
Close - Door/window
Window pane
Oct 3, 2021 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Oct 3, 2021 · Apt 1R
Close - Paint/plaster
Ceiling
Oct 3, 2021 · Apt 1R
Close - Unsanitary condition
Pests
Oct 3, 2021 · Apt 1R
Close - Unsanitary condition
Mold
Oct 3, 2021 · Apt 1R
Close - Door/window
Door
Oct 3, 2021 · Apt 1R
Close - Unsanitary condition
Pests
Oct 3, 2021 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1926
- Floors
- 2
- Residential units
- 4
- Building area
- 3,240 ft²
- Lot area
- 3,742 ft²
- Zoning
- R5A
- Community board
- 212
- Council district
- 12
- Block / lot
- 4829 / 30
- Assessed value
- $364,950
- Landmark / historic district
- No
HPD registration #217097, last renewed Aug 30, 2025.
Questions about 687 East 226 Street
Who owns 687 East 226 Street?
The owner of record in NYC Department of City Planning PLUTO data is Z Holdings 19 LLC.
Does 687 East 226 Street have violations?
Yes. NYC HPD has recorded 209 housing violations at this property.
Is 687 East 226 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 687 East 226 Street built?
City records list 1926 as the year it was built.
How many apartments are in 687 East 226 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.