roofy

1178 East 221 Street

Bronx, NY 10469BBL 2-04717-0100Map

Owner of record: 1178 E 221st Street LLC

1178 East 221 Street is a walk-up apartment building built in 1901 in Bronx, 10469. It has 3 residential units across 2 floors. The owner of record is 1178 E 221st Street LLC. HPD has recorded 57 housing violations here, most recently on April 30, 2026. 16 of the 50 most recent violations are still open.

HPD violations
57
DOB violations
38
ECB violations
10
HPD complaints
133

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 57

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of construction materials and household item. at boiler room

    Apr 16, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective fireproof door. at boiler room

    Apr 16, 2026

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 1a, 1st story

    Feb 10, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3rdflr, 3rd story, 1st apartment from north at east

    Dec 19, 2025 · Apt 3RDFLR

    Open — Notice of issuance sent to tenant
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Dec 19, 2025

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the 2nd room from north located at apt 3rdflr, 3rd story, 1st apartment from north at east

    Dec 19, 2025 · Apt 3RDFLR

    Closed — Violation closed
  • B

    Fire escape defective. replace with new the broken, defective and/or missing ''bent'' drop ladder at east at fire escape

    Aug 14, 2025

    Open — First no access to re- inspect violation
  • C

    Properly repair or replace the broken or defective lock and assembley at building entrance door , 1st story

    Aug 14, 2025

    Open — First no access to re- inspect violation
  • A

    Properly repair or replace the broken or defective room entry door in the 2nd room from north located at apt 1a, 1st story, 1st apartment from east at south

    Dec 26, 2024 · Apt 1A

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective wood baseboard at the north wall in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south

    Dec 26, 2024 · Apt 1A

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the foyer located at apt 1a, 1st story, 1st apartment from east at south

    Dec 26, 2024 · Apt 1A

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the foyer located at apt 1a, 1st story, 1st apartment from east at south

    Dec 26, 2024 · Apt 1A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Dec 26, 2024 · Apt 1A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Dec 26, 2024 · Apt 1A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south

    Dec 26, 2024 · Apt 1A

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2024

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 16, 2023

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Oct 29, 2022 · Apt 1A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the foyer located at apt 1a, 1st story, 1st apartment from east at south

    Oct 29, 2022 · Apt 1A

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Oct 29, 2022 · Apt 1A

    Open — Defect letter issued
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Oct 29, 2022 · Apt 1A

    Open — Defect letter issued
  • B

    Properly secure the loose vinyl floor paneling at floor in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south

    Oct 29, 2022 · Apt 1A

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 17, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 1a, 1st story, 1st apartment from south at west

    Dec 10, 2020 · Apt 1A

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from south at west

    Dec 10, 2020 · Apt 1A

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective ceramic tile grout at bathtub wall in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    Dec 10, 2020 · Apt 1A

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches located at apt 1a, 1st story, 1st apartment from south at west

    Dec 10, 2020 · Apt 1A

    Open — Defect letter issued
  • C

    Abate the infestation consisting of mice located at apt 1a, 1st story, 1st apartment from south at west

    Dec 10, 2020 · Apt 1A

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from north at west, the foyer located at apt 1a, 1st story, 1st apartment from east at south

    Dec 5, 2017 · Apt 1A

    Closed — Violation closed
  • B

    Abate the nuisance consisting of roaches located at apt 1a, 1st story, 1st apartment from east at south

    Dec 5, 2017 · Apt 1A

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice located at apt 1a, 1st story, 1st apartment from east at south

    Dec 5, 2017 · Apt 1A

    Closed — Violation closed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl loose in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Dec 5, 2017 · Apt 1A

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Dec 5, 2017 · Apt 1A

    Closed — Violation closed
  • B

    Replace with new the missing ceramic floor tiles in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Dec 5, 2017 · Apt 1A

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts fixture missing , 1st story

    Sep 18, 2017

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... 6 sq ft at the ceiling and 4 sq ft at west wall in the foyer located at apt 1a, 1st story, 1st apartment from east at south

    Aug 25, 2017 · Apt 1A

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Aug 25, 2017 · Apt 1A

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... 8 sq ft at west wall in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Aug 25, 2017 · Apt 1A

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Aug 25, 2017 · Apt 1A

    Closed — Violation closed
  • B

    Replace with new the missing cover at baseboard radiator in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Aug 25, 2017 · Apt 1A

    Closed — Violation closed
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Aug 25, 2017 · Apt 1A

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Aug 25, 2017 · Apt 1A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the kitchen , the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Aug 25, 2017 · Apt 1A

    Closed — Violation closed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1fl, 2nd story, 1st apartment from north at east

    Aug 17, 2017 · Apt 1FL

    Open — First no access to re- inspect violation
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 1fl, 2nd story, 1st apartment from north at east

    Aug 17, 2017 · Apt 1FL

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor and window stool in the bathroom located at apt 1fl, 2nd story, 1st apartment from north at east

    Aug 17, 2017 · Apt 1FL

    Open — First no access to re- inspect violation

DOB building violations · 38

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
Show 28 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Jul 3, 2006

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 10, 2004

    Dob violation - active

ECB violations · 10

  • Class - 1

    28.105.1 b101 51 weil mclain boiler

    Dec 16, 2008 · Penalty $1,600

    Resolve
  • Class - 1

    28.105.1 b154 50.50a.50b.50c.50d.50e.51 wermc law boiler 50 low water cut off & aqudstat manual reset to be relocated to supply line 50d ceil chimney & flue pipe 50a relief valve not pipet to fl 50e holes in wa

    Dec 16, 2008 · Penalty $1,000

    Resolve
  • Class - 1

    28.105.1 51 b101 crown boiler

    Dec 16, 2008 · Penalty $1,600

    Resolve
  • Class - 1

    28.105.1 b101.51 weil mclain

    Dec 16, 2008 · Penalty $1,600

    Resolve
  • Class - 1

    301.1 b154 51.50.50a.50b.50c. crown boiler 50-chimney not seale at flue pipe 50a-relief not piped to fl 50b-no check valve between backflow & pressure relief val ve 50c-relocate low water cut off & manor reset

    Dec 16, 2008 · Penalty $1,000

    Resolve
  • Class - 1

    28.105.1 b101.51 williamson

    Dec 16, 2008 · Penalty $1,600

    Resolve
  • Class - 1

    28.301.1 b154 50.50a.50b.50c.51 weil mclain 50-relief not piped to fl 50a-relocate aquastat (manual reset) & lw water cut off 50b-seal flue pipe at chimney

    Dec 16, 2008 · Penalty $1,000

    Resolve
  • Class - 1

    301.1 b154 50.50a.50b.50c 50-relocate manual reset aquastat & water cut off to supply line 50a-no swing check between backflow & pressure valve 50b-seal flue pipe at chimney 50c relief valve not piped down

    Dec 16, 2008 · Penalty $1,000

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by c of o 200826641 legal use apt current use office space location 2nd sty remedy: discontinue illegal use

    Dec 2, 2008 · Penalty $400

    Resolve
  • Class - 1

    Sec. 27-366 failure to provide adequate egress from space where required. fire escape window is only twenty inches wide & approx 4 feet above flr window is providing inadequate secondary means of egress from 2n

    Dec 1, 2008 · Penalty $1,600

    Active

Complaints

  • Unsanitary condition

    Pests

    Dec 26, 2025 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Dec 26, 2025 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2025 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Dec 26, 2025 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Dec 18, 2025 · Apt 3RDFLR

    Close
  • Paint/plaster

    Cabinet

    Dec 18, 2025 · Apt 3RDFLR

    Close
  • Paint/plaster

    Wall

    Dec 18, 2025 · Apt 3RDFLR

    Close
  • Paint/plaster

    Wall

    Dec 18, 2025 · Apt 3RDFLR

    Close
  • Heat/hot water

    Apartment only

    Dec 18, 2025 · Apt 3RDFLR

    Close
  • Door/window

    Door

    Jun 13, 2025 · Apt BLDG

    Close
Show 40 more ↓
  • Safety

    Fire escape

    Jun 13, 2025 · Apt BLDG

    Close
  • Outside building

    Skylight

    Jun 13, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Nov 4, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Nov 4, 2024 · Apt 1A

    Close
  • Safety

    Smoke detector

    Nov 4, 2024 · Apt 1A

    Close
  • Safety

    Carbon monoxide detector

    Nov 4, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Nov 4, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Nov 4, 2024 · Apt 1A

    Close
  • Plumbing

    Water supply

    Nov 4, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Nov 4, 2024 · Apt 1A

    Close
  • Plumbing

    Water supply

    Nov 4, 2024 · Apt 1A

    Close
  • Door/window

    Door

    Nov 4, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Oct 25, 2024 · Apt 3

    Close
  • Plumbing

    Water supply

    Oct 25, 2024 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Oct 25, 2024 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Oct 25, 2024 · Apt 3

    Close
  • Plumbing

    Water supply

    Oct 25, 2024 · Apt 3

    Close
  • Paint/plaster

    Wall

    Oct 25, 2024 · Apt 3

    Close
  • Safety

    Window guard broken/missing

    Oct 25, 2024 · Apt 3

    Close
  • Safety

    Carbon monoxide detector

    Oct 25, 2024 · Apt 3

    Close
  • Safety

    Smoke detector

    Oct 25, 2024 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Oct 25, 2024 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Oct 25, 2024 · Apt 3

    Close
  • Water leak

    Heavy flow

    Aug 19, 2023 · Apt 1A

    Close
  • Electric

    No lighting

    Aug 18, 2023 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Aug 18, 2023 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Aug 18, 2023 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Aug 18, 2023 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    Oct 16, 2022 · Apt 1A

    Close
  • Plumbing

    Toilet

    Oct 16, 2022 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Oct 13, 2022 · Apt 1A

    Close
  • Plumbing

    Toilet

    Oct 13, 2022 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Oct 13, 2022 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Oct 13, 2022 · Apt 1A

    Close
  • Safety

    Fire escape

    Aug 24, 2021 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Aug 24, 2021 · Apt 2

    Close
  • Door/window

    Door

    Aug 24, 2021 · Apt 2

    Close
  • Door/window

    Door

    Aug 24, 2021 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2021 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Dec 7, 2020 · Apt 1A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1901
Floors
2
Residential units
3
Building area
3,219 ft²
Lot area
3,284 ft²
Zoning
R5
Community board
212
Council district
12
Block / lot
4717 / 100
Assessed value
$55,740
Landmark / historic district
No

HPD registration #216917, last renewed Jul 8, 2025.

Questions about 1178 East 221 Street

Who owns 1178 East 221 Street?

The owner of record in NYC Department of City Planning PLUTO data is 1178 E 221st Street LLC.

Does 1178 East 221 Street have violations?

Yes. NYC HPD has recorded 57 housing violations at this property.

Is 1178 East 221 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1178 East 221 Street built?

City records list 1901 as the year it was built.

How many apartments are in 1178 East 221 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.