1178 East 221 Street
Bronx, NY 10469BBL 2-04717-0100Map
Owner of record: 1178 E 221st Street LLC
1178 East 221 Street is a walk-up apartment building built in 1901 in Bronx, 10469. It has 3 residential units across 2 floors. The owner of record is 1178 E 221st Street LLC. HPD has recorded 57 housing violations here, most recently on April 30, 2026. 16 of the 50 most recent violations are still open.
- HPD violations
- 57
- DOB violations
- 38
- ECB violations
- 10
- HPD complaints
- 133
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 57
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction materials and household item. at boiler room
Apr 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fireproof door. at boiler room
Apr 16, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 1a, 1st story
Feb 10, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3rdflr, 3rd story, 1st apartment from north at east
Dec 19, 2025 · Apt 3RDFLR
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Dec 19, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the 2nd room from north located at apt 3rdflr, 3rd story, 1st apartment from north at east
Dec 19, 2025 · Apt 3RDFLR
Closed — Violation closed - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing ''bent'' drop ladder at east at fire escape
Aug 14, 2025
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembley at building entrance door , 1st story
Aug 14, 2025
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair or replace the broken or defective room entry door in the 2nd room from north located at apt 1a, 1st story, 1st apartment from east at south
Dec 26, 2024 · Apt 1A
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood baseboard at the north wall in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south
Dec 26, 2024 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the foyer located at apt 1a, 1st story, 1st apartment from east at south
Dec 26, 2024 · Apt 1A
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the foyer located at apt 1a, 1st story, 1st apartment from east at south
Dec 26, 2024 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Dec 26, 2024 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Dec 26, 2024 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south
Dec 26, 2024 · Apt 1A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Oct 29, 2022 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the foyer located at apt 1a, 1st story, 1st apartment from east at south
Oct 29, 2022 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Oct 29, 2022 · Apt 1A
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Oct 29, 2022 · Apt 1A
Open — Defect letter issued - BHazardous
Properly secure the loose vinyl floor paneling at floor in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south
Oct 29, 2022 · Apt 1A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 1a, 1st story, 1st apartment from south at west
Dec 10, 2020 · Apt 1A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from south at west
Dec 10, 2020 · Apt 1A
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile grout at bathtub wall in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Dec 10, 2020 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 1a, 1st story, 1st apartment from south at west
Dec 10, 2020 · Apt 1A
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of mice located at apt 1a, 1st story, 1st apartment from south at west
Dec 10, 2020 · Apt 1A
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from north at west, the foyer located at apt 1a, 1st story, 1st apartment from east at south
Dec 5, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches located at apt 1a, 1st story, 1st apartment from east at south
Dec 5, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice located at apt 1a, 1st story, 1st apartment from east at south
Dec 5, 2017 · Apt 1A
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl loose in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Dec 5, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Dec 5, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Replace with new the missing ceramic floor tiles in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Dec 5, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts fixture missing , 1st story
Sep 18, 2017
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... 6 sq ft at the ceiling and 4 sq ft at west wall in the foyer located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2017 · Apt 1A
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... 8 sq ft at west wall in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Replace with new the missing cover at baseboard radiator in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2017 · Apt 1A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the kitchen , the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2017 · Apt 1A
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1fl, 2nd story, 1st apartment from north at east
Aug 17, 2017 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1fl, 2nd story, 1st apartment from north at east
Aug 17, 2017 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor and window stool in the bathroom located at apt 1fl, 2nd story, 1st apartment from north at east
Aug 17, 2017 · Apt 1FL
Open — First no access to re- inspect violation
DOB building violations · 38
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active
Show 28 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Construction other optional
C-construction other optional
Jul 3, 2006
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 10, 2004
Dob violation - active
ECB violations · 10
- Class - 1
28.105.1 b101 51 weil mclain boiler
Dec 16, 2008 · Penalty $1,600
Resolve - Class - 1
28.105.1 b154 50.50a.50b.50c.50d.50e.51 wermc law boiler 50 low water cut off & aqudstat manual reset to be relocated to supply line 50d ceil chimney & flue pipe 50a relief valve not pipet to fl 50e holes in wa
Dec 16, 2008 · Penalty $1,000
Resolve - Class - 1
28.105.1 51 b101 crown boiler
Dec 16, 2008 · Penalty $1,600
Resolve - Class - 1
28.105.1 b101.51 weil mclain
Dec 16, 2008 · Penalty $1,600
Resolve - Class - 1
301.1 b154 51.50.50a.50b.50c. crown boiler 50-chimney not seale at flue pipe 50a-relief not piped to fl 50b-no check valve between backflow & pressure relief val ve 50c-relocate low water cut off & manor reset
Dec 16, 2008 · Penalty $1,000
Resolve - Class - 1
28.105.1 b101.51 williamson
Dec 16, 2008 · Penalty $1,600
Resolve - Class - 1
28.301.1 b154 50.50a.50b.50c.51 weil mclain 50-relief not piped to fl 50a-relocate aquastat (manual reset) & lw water cut off 50b-seal flue pipe at chimney
Dec 16, 2008 · Penalty $1,000
Resolve - Class - 1
301.1 b154 50.50a.50b.50c 50-relocate manual reset aquastat & water cut off to supply line 50a-no swing check between backflow & pressure valve 50b-seal flue pipe at chimney 50c relief valve not piped down
Dec 16, 2008 · Penalty $1,000
Resolve - Class - 2
Occupancy contrary to that allowed by c of o 200826641 legal use apt current use office space location 2nd sty remedy: discontinue illegal use
Dec 2, 2008 · Penalty $400
Resolve - Class - 1
Sec. 27-366 failure to provide adequate egress from space where required. fire escape window is only twenty inches wide & approx 4 feet above flr window is providing inadequate secondary means of egress from 2n
Dec 1, 2008 · Penalty $1,600
Active
Complaints
- Unsanitary condition
Pests
Dec 26, 2025 · Apt 1A
Close - Unsanitary condition
Mold
Dec 26, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 26, 2025 · Apt 1A
Close - Unsanitary condition
Pests
Dec 26, 2025 · Apt 1A
Close - Unsanitary condition
Pests
Dec 18, 2025 · Apt 3RDFLR
Close - Paint/plaster
Cabinet
Dec 18, 2025 · Apt 3RDFLR
Close - Paint/plaster
Wall
Dec 18, 2025 · Apt 3RDFLR
Close - Paint/plaster
Wall
Dec 18, 2025 · Apt 3RDFLR
Close - Heat/hot water
Apartment only
Dec 18, 2025 · Apt 3RDFLR
Close - Door/window
Door
Jun 13, 2025 · Apt BLDG
Close
Show 40 more ↓
- Safety
Fire escape
Jun 13, 2025 · Apt BLDG
Close - Outside building
Skylight
Jun 13, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Nov 4, 2024 · Apt 1A
Close - Unsanitary condition
Pests
Nov 4, 2024 · Apt 1A
Close - Safety
Smoke detector
Nov 4, 2024 · Apt 1A
Close - Safety
Carbon monoxide detector
Nov 4, 2024 · Apt 1A
Close - Unsanitary condition
Mold
Nov 4, 2024 · Apt 1A
Close - Unsanitary condition
Mold
Nov 4, 2024 · Apt 1A
Close - Plumbing
Water supply
Nov 4, 2024 · Apt 1A
Close - Unsanitary condition
Mold
Nov 4, 2024 · Apt 1A
Close - Plumbing
Water supply
Nov 4, 2024 · Apt 1A
Close - Door/window
Door
Nov 4, 2024 · Apt BLDG
Close - Paint/plaster
Wall
Oct 25, 2024 · Apt 3
Close - Plumbing
Water supply
Oct 25, 2024 · Apt 3
Close - Unsanitary condition
Mold
Oct 25, 2024 · Apt 3
Close - Unsanitary condition
Mold
Oct 25, 2024 · Apt 3
Close - Plumbing
Water supply
Oct 25, 2024 · Apt 3
Close - Paint/plaster
Wall
Oct 25, 2024 · Apt 3
Close - Safety
Window guard broken/missing
Oct 25, 2024 · Apt 3
Close - Safety
Carbon monoxide detector
Oct 25, 2024 · Apt 3
Close - Safety
Smoke detector
Oct 25, 2024 · Apt 3
Close - Unsanitary condition
Pests
Oct 25, 2024 · Apt 3
Close - Unsanitary condition
Pests
Oct 25, 2024 · Apt 3
Close - Water leak
Heavy flow
Aug 19, 2023 · Apt 1A
Close - Electric
No lighting
Aug 18, 2023 · Apt 1A
Close - Paint/plaster
Ceiling
Aug 18, 2023 · Apt 1A
Close - Water leak
Heavy flow
Aug 18, 2023 · Apt 1A
Close - Water leak
Heavy flow
Aug 18, 2023 · Apt 1A
Close - Plumbing
Bathtub/shower
Oct 16, 2022 · Apt 1A
Close - Plumbing
Toilet
Oct 16, 2022 · Apt 1A
Close - Unsanitary condition
Pests
Oct 13, 2022 · Apt 1A
Close - Plumbing
Toilet
Oct 13, 2022 · Apt 1A
Close - Unsanitary condition
Pests
Oct 13, 2022 · Apt 1A
Close - Water leak
Heavy flow
Oct 13, 2022 · Apt 1A
Close - Safety
Fire escape
Aug 24, 2021 · Apt 3
Close - Unsanitary condition
Pests
Aug 24, 2021 · Apt 2
Close - Door/window
Door
Aug 24, 2021 · Apt 2
Close - Door/window
Door
Aug 24, 2021 · Apt 3
Close - Heat/hot water
Apartment only
Feb 1, 2021 · Apt 1A
Close - Unsanitary condition
Mold
Dec 7, 2020 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1901
- Floors
- 2
- Residential units
- 3
- Building area
- 3,219 ft²
- Lot area
- 3,284 ft²
- Zoning
- R5
- Community board
- 212
- Council district
- 12
- Block / lot
- 4717 / 100
- Assessed value
- $55,740
- Landmark / historic district
- No
HPD registration #216917, last renewed Jul 8, 2025.
Questions about 1178 East 221 Street
Who owns 1178 East 221 Street?
The owner of record in NYC Department of City Planning PLUTO data is 1178 E 221st Street LLC.
Does 1178 East 221 Street have violations?
Yes. NYC HPD has recorded 57 housing violations at this property.
Is 1178 East 221 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1178 East 221 Street built?
City records list 1901 as the year it was built.
How many apartments are in 1178 East 221 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.