1147 East 212 Street
Bronx, NY 10469BBL 2-04707-0016Map
Owner of record: 1147 Gun Hill LLC
1147 East 212 Street is a walk-up apartment building built in 1930 in Bronx, 10469. It has 5 residential units across 2 floors. The owner of record is 1147 Gun Hill LLC. HPD has recorded 50 housing violations here, most recently on October 15, 2026. 5 of the 50 most recent violations are still open.
- HPD violations
- 50
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 74
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 50
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall. south wall and ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Oct 15, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Oct 15, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Oct 15, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 1f, 1st story, 1st apartment from west at north
Aug 14, 2026 · Apt 1F
Open — Civ14 mailed - BHazardous
Remove all obstructions and repair all defects in waste drain pipe at wash basin in the bathroom located at apt 1f, 1st story, 1st apartment from west at north
Aug 14, 2026 · Apt 1F
Open — Civ14 mailed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
May 22, 2025 · Apt 2R
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at .. in the entrance located at apt 2r, 2nd story, 1st apartment from west at north
May 22, 2025 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door at entrance in the 1st room from north at west located at apt 2r, 2nd story, 1st apartment from west at north
May 22, 2025 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
May 22, 2025 · Apt 2R
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
May 22, 2025 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east and north wall in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Feb 6, 2025 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Feb 6, 2025 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Feb 6, 2025 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Feb 6, 2025 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north
Sep 27, 2024 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north
Sep 27, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1f, 1st story, 1st apartment from west at north
Sep 27, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 1f, 1st story, 1st apartment from west at north
Sep 27, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Refit wood door in the 4th room from north located at apt 1f, 1st story, 1st apartment from west at north
Sep 27, 2024 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system no access to boiler room at boiler room
Feb 23, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Feb 23, 2022 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective adjust the hinges in the entrance located at apt 3f, 3rd story, 1st apartment from north at east
Feb 17, 2022 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 17, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Feb 17, 2022 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees at sink in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Feb 14, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 2r, 2nd story, 1st apartment from west at north
Feb 14, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2r, 2nd story, 1st apartment from west at north
Feb 14, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mortise door lock in the entrance located at apt 2r, 2nd story, 1st apartment from west at north
Feb 14, 2022 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock on the door leading to the fire escape window in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Feb 14, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of household items obstructing the fire escape window in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Feb 14, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Feb 6, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Feb 6, 2022 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Refit the door in the entrance located at apt 1f, 1st story, 1st apartment from west at north
Mar 16, 2021 · Apt 1F
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10sq ft ceiling, east wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Dec 10, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Dec 10, 2019 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Dec 10, 2019 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Dec 10, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of air conditiner at rgress window in the 1st room from north at west located at apt 2r, 2nd story, 1st apartment from west at north
Dec 10, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of key operated lock installed at door in the room leading to fire escape window. in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Nov 8, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective lower window sash spring balance the first window from north at east in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Nov 8, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell buzzer at north wall in the foyer located at apt 2r, 2nd story, 1st apartment from west at north
Nov 8, 2019 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Nov 8, 2019 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Nov 8, 2019 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Nov 8, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 1f, 1st story, 1st apartment from west at north
Aug 22, 2018 · Apt 1F
Closed — Violation closed - BHazardous
Properly secure the loose basebord at heater at north in the 1st room from north at west located at apt 2r, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical outlets at east wall and south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 1f, 1st story, 1st apartment from west at north
Aug 19, 2016 · Apt 1F
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
Oct 7, 2026 · Apt 2R
Close - Unsanitary condition
Sewage
Oct 7, 2026 · Apt 2R
Close - Appliance
Electric/gas range
Oct 7, 2026 · Apt 2R
Close - Appliance
Refrigerator
Oct 7, 2026 · Apt 2R
Close - Water leak
Heavy flow
Oct 7, 2026 · Apt 2R
Close - General
Cabinet
Oct 7, 2026 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Oct 7, 2026 · Apt 2R
Close - Door/window
Door
Oct 7, 2026 · Apt 2R
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt BLDG
Close - General
Cabinet
Sep 8, 2025 · Apt 1F
Close
Show 40 more ↓
- Unsanitary condition
Pests
Sep 8, 2025 · Apt 1F
Close - Door/window
Window frame
Sep 8, 2025 · Apt 1F
Close - Door/window
Door
May 19, 2025 · Apt 2R
Close - Water leak
Damp spot
May 19, 2025 · Apt 2R
Close - Plumbing
Toilet
May 19, 2025 · Apt 2R
Close - General
Cabinet
May 19, 2025 · Apt 2R
Close - Appliance
Electric/gas range
May 19, 2025 · Apt 2R
Close - Paint/plaster
Ceiling
May 19, 2025 · Apt 2R
Close - Electric
No lighting
Jan 31, 2025 · Apt 2R
Close - Electric
Lighting
Jan 31, 2025 · Apt 2R
Close - General
Cabinet
Jan 31, 2025 · Apt 2R
Close - Paint/plaster
Ceiling
Jan 31, 2025 · Apt 2R
Close - Plumbing
Toilet
Jan 31, 2025 · Apt 2R
Close - Door/window
Door
Jan 31, 2025 · Apt 2R
Close - Paint/plaster
Ceiling
Jan 31, 2025 · Apt 2R
Close - Paint/plaster
Ceiling
Jan 31, 2025 · Apt 2R
Close - Paint/plaster
Window/frame
Jan 31, 2025 · Apt 2R
Close - Paint/plaster
Ceiling
Jan 31, 2025 · Apt 2R
Close - Unsanitary condition
Mold
Jan 31, 2025 · Apt 2R
Close - Paint/plaster
Wall
Jan 31, 2025 · Apt 2R
Close - Electric
Lighting
Jan 31, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Jan 31, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Jan 31, 2025 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Jan 31, 2025 · Apt BLDG
Close - Plumbing
Basin/sink
Jul 6, 2024 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Jul 6, 2024 · Apt BLDG
Close - Paint/plaster
Wall
Jun 13, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Feb 21, 2022 · Apt 2R
Close - Heat/hot water
Entire building
Feb 15, 2022 · Apt BLDG
Close - General
Bell/buzzer/intercom
Feb 3, 2022 · Apt 2R
Close - Appliance
Refrigerator
Feb 3, 2022 · Apt 2R
Close - Door/window
Door
Feb 3, 2022 · Apt 2R
Close - Heat/hot water
Apartment only
Feb 3, 2022 · Apt 2R
Close - Unsanitary condition
Mold
Feb 3, 2022 · Apt 2R
Close - Plumbing
Radiator
Feb 3, 2022 · Apt 2R
Close - Paint/plaster
Ceiling
Feb 3, 2022 · Apt 2R
Close - General
Cabinet
Feb 3, 2022 · Apt 2R
Close - Heat/hot water
Entire building
Jan 20, 2022 · Apt 2R
Close - Electric
Power outage
Oct 22, 2021 · Apt 2R
Close - Heat/hot water
Entire building
Oct 30, 2020 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1930
- Floors
- 2
- Residential units
- 5
- Building area
- 3,800 ft²
- Lot area
- 2,169 ft²
- Zoning
- R5
- Community board
- 212
- Council district
- 12
- Block / lot
- 4707 / 16
- Assessed value
- $239,400
- Landmark / historic district
- No
HPD registration #216353, last renewed Jul 8, 2025.
Questions about 1147 East 212 Street
Who owns 1147 East 212 Street?
The owner of record in NYC Department of City Planning PLUTO data is 1147 Gun Hill LLC.
Does 1147 East 212 Street have violations?
Yes. NYC HPD has recorded 50 housing violations at this property.
Is 1147 East 212 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1147 East 212 Street built?
City records list 1930 as the year it was built.
How many apartments are in 1147 East 212 Street?
It has 5 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.