931 East 216 Street
Bronx, NY 10469BBL 2-04687-0012Map
Owner of record: Trotman, Ogechi
931 East 216 Street is a walk-up apartment building built in 2003 in Bronx, 10469. It has 3 residential units across 3 floors. The owner of record is Trotman, Ogechi. HPD has recorded 124 housing violations here, most recently on January 6, 2026.
- HPD violations
- 124
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 159
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 124
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective located at apt 1, 1st story, 1st apartment from north at east
Jan 6, 2026 · Apt 1
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective located at apt 1, 1st story, 1st apartment from north at east
Jan 6, 2026 · Apt 1
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl water closet in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wooden saddle between private hall and kitchen flooring in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at boiler room, 1st story
Nov 23, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective broken glass pane at window at north wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and assembly at door in the entrance located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq.ft but less than 30 sq.ft at ceiling in the 1st room from north at west located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak east, west, south walls and ceiling in the 1st room from north at west located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 21, 2025 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Sep 21, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Sep 21, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mortise lock and assembly in the entrance located at apt 1, 1st story, 1st apartment from north at east
Sep 21, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations deffective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 21, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules deffective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 21, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 21, 2025 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north located at apt 1, 1st story, 1st apartment from north at east
Sep 21, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective upper and lower glass pane at north wall in the 2nd room from north located at apt 1, 1st story, 1st apartment from north at east
Sep 21, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1groun, 1st story, 1st apartment from north at east
Sep 20, 2025 · Apt 1GROUN
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 1groun, 1st story, 1st apartment from north at east
Sep 20, 2025 · Apt 1GROUN
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1groun, 1st story, 1st apartment from north at east
Sep 20, 2025 · Apt 1GROUN
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lock and assembley at apartment entrance door in the entrance located at apt 1groun, 1st story, 1st apartment from north at east
Sep 20, 2025 · Apt 1GROUN
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1groun, 1st story, 1st apartment from north at east
Sep 20, 2025 · Apt 1GROUN
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1groun, 1st story, 1st apartment from north at east
Sep 20, 2025 · Apt 1GROUN
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 1groun, 1st story, 1st apartment from north at east
Sep 20, 2025 · Apt 1GROUN
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective casement window left sash glass pane at north wall in the 2nd room from north located at apt 1groun, 1st story, 1st apartment from north at east
Sep 20, 2025 · Apt 1GROUN
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft in the 1st room from north located at apt 1groun, 1st story, 1st apartment from north at east
Sep 20, 2025 · Apt 1GROUN
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet continuously running in the bathroom located at apt 1groun, 1st story, 1st apartment from north at east
Sep 20, 2025 · Apt 1GROUN
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembley at building entrance door , 1st story
Sep 12, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at public hall, 3rd story
Sep 12, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 3rd story
Sep 12, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door bell at apartment entrance door in the entrance located at apt apt1, 1st story, 1st apartment from north at east
Aug 10, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt apt1, 1st story, 1st apartment from north at east
Aug 10, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt apt1, 1st story, 1st apartment from north at east
Aug 10, 2025 · Apt APT1
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the 1st room from north located at apt apt1, 1st story, 1st apartment from north at east
Aug 10, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt apt1, 1st story, 1st apartment from north at east
Aug 10, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of pests. evidence of water bugs at public hall, 1st story
Aug 10, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt apt1, 1st story, 1st apartment from north at east
Aug 10, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt apt1, 1st story, 1st apartment from north at east
Aug 10, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the 1st room from north located at apt apt1, 1st story, 1st apartment from north at east original violation 18151540 issued 10-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Aug 10, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt apt1, 1st story, 1st apartment from north at east
Aug 10, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt apt1, 1st story, 1st apartment from north at east
Jul 18, 2025 · Apt APT1
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... 10 sqft or greater at ceiling in the 1st room from north located at apt apt1, 1st story, 1st apartment from north at east original violation 18095710 issued 18-jul-25 has been upgraded to class c per administrative code 27-2017.3a(5)(a) or (b).
Jul 18, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt apt1, 1st story, 1st apartment from north at east
Jul 18, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt apt1, 1st story, 1st apartment from north at east
Jul 18, 2025 · Apt APT1
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Class - 3
Atoi observed at exposure #1, approx. 300 square feet of newly/ recently installed impervious concrete surface. property is located in r4 zoning district. front yard is lacking the necessary 25% front yard-plan
Sep 3, 2024
Resolve - Non-hazardous
Expired permit bldg was up to the roof and interior wall framing was in progress and fence permit # 200779194 was expired on 12/31/03 dob records show that fence permit has not been renewed remedy renew fence
Jan 26, 2004 · Penalty $250
Resolve - Hazardous
Failure to safeguard public property at time of inspection foundation was in place and back filling was in progress and construction fence left side and rear adjacent bldg no 929 e 216 st was not place creating
Nov 5, 2003 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Apartment only
Dec 6, 2025 · Apt APT1GR
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Nov 22, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Nov 21, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 20, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Nov 20, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt APT1
Close - Heat/hot water
Apartment only
Nov 17, 2025 · Apt APT1
Close - Unsanitary condition
Pests
Sep 15, 2025 · Apt 1GROUN
Close - Unsanitary condition
Pests
Sep 15, 2025 · Apt 1GROUN
Close
Show 40 more ↓
- Door/window
Door
Sep 15, 2025 · Apt 1GROUN
Close - Safety
Smoke detector
Sep 15, 2025 · Apt 1GROUN
Close - Safety
Carbon monoxide detector
Sep 15, 2025 · Apt 1GROUN
Close - Paint/plaster
Wall
Sep 15, 2025 · Apt 1GROUN
Close - Paint/plaster
Ceiling
Sep 15, 2025 · Apt 1GROUN
Close - Unsanitary condition
Mold
Sep 15, 2025 · Apt 1GROUN
Close - Plumbing
Toilet
Sep 15, 2025 · Apt 1GROUN
Close - Plumbing
Basin/sink
Sep 15, 2025 · Apt 1GROUN
Close - Paint/plaster
Wall
Sep 11, 2025 · Apt BLDG
Close - Paint/plaster
Wall
Sep 11, 2025 · Apt 1
Close - Unsanitary condition
Pests
Sep 11, 2025 · Apt 1
Close - Unsanitary condition
Pests
Sep 11, 2025 · Apt 1
Close - Door/window
Door
Sep 11, 2025 · Apt 1
Close - Safety
Smoke detector
Sep 11, 2025 · Apt 1
Close - Door/window
Door
Sep 11, 2025 · Apt BLDG
Close - General
Bell/buzzer/intercom
Sep 11, 2025 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 11, 2025 · Apt BLDG
Close - Safety
Carbon monoxide detector
Sep 11, 2025 · Apt 1
Close - Unsanitary condition
Mold
Sep 11, 2025 · Apt 3
Close - Plumbing
Basin/sink
Sep 11, 2025 · Apt 3
Close - Plumbing
Basin/sink
Sep 11, 2025 · Apt 1
Close - Plumbing
Toilet
Sep 11, 2025 · Apt 1
Close - Unsanitary condition
Mold
Sep 11, 2025 · Apt 1
Close - Paint/plaster
Ceiling
Sep 11, 2025 · Apt 1
Close - Paint/plaster
Door/frame
Jul 15, 2025 · Apt APT1
Close - Safety
Carbon monoxide detector
Jul 15, 2025 · Apt APT1
Close - Door/window
Window pane
Jul 15, 2025 · Apt APT1
Close - Paint/plaster
Ceiling
Jul 15, 2025 · Apt APT1
Close - Appliance
Electric/gas range
Jul 15, 2025 · Apt APT1
Close - Paint/plaster
Ceiling
Jul 15, 2025 · Apt APT1
Close - Unsanitary condition
Pests
Jul 15, 2025 · Apt APT1
Close - Paint/plaster
Ceiling
Jul 15, 2025 · Apt APT1
Close - Unsanitary condition
Pests
Jul 15, 2025 · Apt APT1
Close - Paint/plaster
Wall
Jul 15, 2025 · Apt APT1
Close - Plumbing
Basin/sink
Jul 15, 2025 · Apt APT1
Close - Unsanitary condition
Mold
Jul 15, 2025 · Apt APT1
Close - Safety
Smoke detector
Jul 15, 2025 · Apt APT1
Close - General
Bell/buzzer/intercom
Jul 15, 2025 · Apt APT1
Close - Unsanitary condition
Sewage
Jul 15, 2025 · Apt APT1
Close - Water leak
Damp spot
Jul 15, 2025 · Apt APT1
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 7, 2026 | $1,112,000 | Three family dwellings | 3 |
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2003
- Floors
- 3
- Residential units
- 3
- Building area
- 4,872 ft²
- Lot area
- 2,296 ft²
- Zoning
- R4
- Community board
- 212
- Council district
- 12
- Block / lot
- 4687 / 12
- Assessed value
- $85,440
- Landmark / historic district
- No
HPD registration #224020, last renewed Sep 10, 2025.
Questions about 931 East 216 Street
Who owns 931 East 216 Street?
The owner of record in NYC Department of City Planning PLUTO data is Trotman, Ogechi.
Does 931 East 216 Street have violations?
Yes. NYC HPD has recorded 124 housing violations at this property.
Is 931 East 216 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 931 East 216 Street built?
City records list 2003 as the year it was built.
How many apartments are in 931 East 216 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.