913 East 213 Street
Bronx, NY 10469BBL 2-04684-0029Map
Owner of record: 913 East 213th St LLC
913 East 213 Street is a two-family home built in 1920 in Bronx, 10469. It has 2 residential units across 2 floors. The owner of record is 913 East 213th St LLC. HPD has recorded 39 housing violations here, most recently on May 30, 2026. 24 of the 39 most recent violations are still open.
- HPD violations
- 39
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 32
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 39
- BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from north at west located at apt 2, 2nd story, 1st apartment from west at north
May 30, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 2, 2nd story, 1st apartment from west at north
May 30, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north at west located at apt 2, 2nd story, 1st apartment from west at north
May 30, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st riser from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jan 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from south at west wall, west wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Jan 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall, south wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Jan 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from west at north wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Jan 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall, east wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Jan 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective leak at shut off valve at south wall radiator in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Dec 29, 2025 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing electric outlet cover at south wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Dec 29, 2025 · Apt 2
Open — Nov sent out
Show 29 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 29, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, 1st stair case banister/ rail cap from west at north wall in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2025 · Apt 2
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in the wash basin wasteline in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective marble saddle at the entrance in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2025 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at south, the bathroom , the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Nov 4, 2025 · Apt 2
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections at walls, under the floors at sink (kitchen), and wash basin, bathtub, watercloset (bathroom) at illegally created class ''a'' apartment at basement
Jul 11, 2025
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas line install at range at illegally created class ''a'' apartment at basement
Jul 11, 2025
Open — Nov sent out - BHazardous
§ 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy
Jul 11, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall and ceiling in the 4th room from north at east located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from north at east located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 26, 2024 · Apt 1
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 26, 2024 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north, the 3rd room from north, the bathroom , the foyer located at apt 1, 1st story, 1st apartment from south at west
Jan 26, 2024 · Apt 1
Closed — Violation closed - ANon-hazardous
Abate the nuisance consisting of peeling paint at metal radiator in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Dec 13, 2019 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Abate the nuisance consisting of peeling paint at metal radiator in the 2nd room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Dec 13, 2019 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from west at north
Dec 13, 2019 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story
Jan 13, 2014 · Apt 2
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Class - 2
Occupancy contrary to that allowed by c of o and/or department of building records. illegally created class "a" apartment at bsmt, consisting of sink, gas stove at kitchen, bathtub of egress at door to rear yar
Jul 11, 2025 · Penalty $6,250
Active - Non-hazardous
Failure to maintain exterior bldg wall. defects noted: brick facade ismissing mortar joints,has horozontal & vertical cracks to joints, has exposed steel lintels which are corroding @ ground level & roof
Jun 18, 2006 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior wall. parapet brick cracked @ east elevation:steel window lentil defective. rusted & deteriating @ 2nd flr window. remedy:make all necessary repairs maintain property.
Jun 16, 2006 · Penalty $2,500
Resolve
Complaints
- Water leak
Heavy flow
Jul 19, 2026 · Apt 2
Close - Water leak
Damp spot
Jul 19, 2026 · Apt 2
Close - Water leak
Heavy flow
May 24, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Mar 25, 2026 · Apt 2
Close - Plumbing
Water supply
Feb 8, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Dec 27, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Dec 19, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 13, 2025 · Apt 2
Close - Appliance
Electric/gas range
Nov 13, 2025 · Apt 2
Close
Show 22 more ↓
- General
Cooking gas
Nov 4, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 4, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 4, 2025 · Apt 2
Close - Heat/hot water
Entire building
Aug 5, 2025 · Apt 2
Close - General
Cooking gas
Aug 5, 2025 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Jul 6, 2025 · Apt BASEME
Close - Plumbing
Toilet
Jul 6, 2025 · Apt BASEME
Close - Door/window
Door
Jul 6, 2025 · Apt BASEME
Close - Unsanitary condition
Pests
Jul 6, 2025 · Apt BASEME
Close - Unsanitary condition
Mold
Jul 6, 2025 · Apt BASEME
Close - Unsanitary condition
Sewage
Jul 6, 2025 · Apt BASEME
Close - Water leak
Slow leak
Mar 23, 2024 · Apt 2
Close - Paint/plaster
Ceiling
Mar 23, 2024 · Apt 2
Close - Paint/plaster
Ceiling
Jan 22, 2024 · Apt 1
Close - Heating
Heat related
Nov 9, 2010 · Apt 2
Close - Paint/plaster
Ceiling
Jun 25, 2003 · Apt 2
Close - Paint/plaster
Wall
Jun 25, 2003 · Apt 2
Close - General
Mold
Jun 25, 2003 · Apt 2
Close - Nonconst
Vermin
Jun 25, 2003 · Apt 2
Close - Plumbing
Basin/sink
Jun 25, 2003 · Apt 2
Close - Plumbing
Shower-stall
Jun 25, 2003 · Apt 2
Close - Plumbing
Bathtub/shower
Jun 25, 2003 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 2,345 ft²
- Lot area
- 1,767 ft²
- Zoning
- R4
- Community board
- 212
- Council district
- 12
- Block / lot
- 4684 / 29
- Assessed value
- $52,200
- Landmark / historic district
- No
HPD registration #715734, last renewed Aug 29, 2025.
Questions about 913 East 213 Street
Who owns 913 East 213 Street?
The owner of record in NYC Department of City Planning PLUTO data is 913 East 213th St LLC.
Does 913 East 213 Street have violations?
Yes. NYC HPD has recorded 39 housing violations at this property.
Is 913 East 213 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 913 East 213 Street built?
City records list 1920 as the year it was built.
How many apartments are in 913 East 213 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.