806 East 222 Street
Bronx, NY 10467BBL 2-04680-0041Map
Owner of record: Qin, Weiping
806 East 222 Street is a walk-up apartment building built in 2008 in Bronx, 10467. It has 3 residential units across 3 floors. The owner of record is Qin, Weiping. HPD has recorded 41 housing violations here, most recently on April 17, 2024. 12 of the 41 most recent violations are still open.
- HPD violations
- 41
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 55
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 17, 2022 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 17, 2022 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 1, 1st story, 1st apartment from south at west
Mar 30, 2022 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 1, 1st story, 1st apartment from south at west
Mar 30, 2022 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet bowl in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Mar 30, 2022 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective base cabinet at washbasin in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Mar 30, 2022 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical outlet at east wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from south at west
Mar 30, 2022 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 3rd room from north at west located at apt 1, 1st story, 1st apartment from south at west
Mar 30, 2022 · Apt 1
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 1, 1st story, 1st apartment from south at west
Mar 30, 2022 · Apt 1
Closed — Violation dismissed
Show 31 more ↓
- BHazardous
Repair or replace the smoke detector defective located at apt 1, 1st story, 1st apartment from south at west
Mar 30, 2022 · Apt 1
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Dec 31, 2019 · Apt 2
Open — Nov certified late - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 5 sq. ft at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Dec 31, 2019 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inopperable in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Dec 31, 2019 · Apt 2
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). inopperable in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Dec 31, 2019 · Apt 2
Open — Nov certified late - BHazardous
Trace and repair the source and abate the visible mold condition... approx 5 sq. ft at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from south at west original violation 13525371 issued 31-dec-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Dec 31, 2019 · Apt 2
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2019
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 2, 2nd story, 1st apartment from south at west
Aug 1, 2019 · Apt 2
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 2, 2nd story, 1st apartment from south at west
Aug 1, 2019 · Apt 2
Open — Nov certified late - BHazardous
Repair or replace the smoke detector defective located at apt 2, 2nd story, 1st apartment from south at west
Aug 1, 2019 · Apt 2
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 2, 2nd story, 1st apartment from south at west
Aug 1, 2019 · Apt 2
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 2, 2nd story
Jun 21, 2019 · Apt 2
Open — Nov certified late - BHazardous
Properly repair the broken or defective push tabs guide track at lower window sash in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from south at west
Feb 9, 2019 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall and boiler room door , 1st story
Feb 9, 2019
Open — Nov certified late - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. , 1st story
Feb 9, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Feb 9, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. , 1st story
Feb 9, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Feb 9, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Feb 9, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at vestibule , 1st story
Feb 9, 2019
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Aug 18, 2018 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Aug 18, 2018 · Apt 2
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Aug 18, 2018 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... walls apprx 4 sq ft in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Jul 22, 2018 · Apt 2
Open — Nov certified late - ANon-hazardous
Refit door in the entrance located at apt 2, 2nd story, 1st apartment from south at west
Jul 22, 2018 · Apt 2
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from south at west
Jul 22, 2018 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 2, 2nd story, 1st apartment from south at west
Jul 22, 2018 · Apt 2
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jul 22, 2018 · Apt 2
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 12, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 30, 2016
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Paint/plaster
Ceiling
Nov 17, 2022 · Apt 1
Close - Water leak
Heavy flow
Nov 17, 2022 · Apt 1
Close - Water leak
Slow leak
Nov 6, 2022 · Apt APT1
Close - Water leak
Heavy flow
Nov 6, 2022 · Apt APT1
Close - Electric
Wiring
Mar 30, 2022 · Apt 1
Close - Plumbing
Toilet
Mar 30, 2022 · Apt 1
Close - Paint/plaster
Ceiling
Mar 30, 2022 · Apt 1
Close - Water leak
Heavy flow
Mar 30, 2022 · Apt 1
Close - Paint/plaster
Wall
Oct 7, 2021 · Apt 2
Close - Unsanitary condition
Pests
Oct 7, 2021 · Apt 2
Close
Show 40 more ↓
- Unsanitary condition
Mold
Oct 7, 2021 · Apt 2
Close - Plumbing
Bathtub/shower
Sep 18, 2021 · Apt 2
Close - Door/window
Window frame
Sep 18, 2021 · Apt 2
Close - Paint/plaster
Wall
Sep 18, 2021 · Apt 2
Close - Unsanitary condition
Pests
Sep 18, 2021 · Apt 2
Close - Heat/hot water
Apartment only
Jan 22, 2020 · Apt 2
Close - Unsanitary condition
Pests
Dec 20, 2019 · Apt 2
Close - Unsanitary condition
Mold
Dec 20, 2019 · Apt 2
Close - Unsanitary condition
Pests
Dec 20, 2019 · Apt 2
Close - Paint/plaster
Wall
Dec 20, 2019 · Apt 2
Close - Unsanitary condition
Mold
Nov 15, 2019 · Apt 2
Close - Paint/plaster
Ceiling
Nov 15, 2019 · Apt 2
Close - Unsanitary condition
Pests
Nov 15, 2019 · Apt 2
Close - Door/window
Door
Nov 15, 2019 · Apt 2
Close - Unsanitary condition
Pests
Nov 15, 2019 · Apt 2
Close - Paint/plaster
Wall
Nov 15, 2019 · Apt 2
Close - Water leak
Damp spot
Sep 26, 2019 · Apt 2
Close - Paint/plaster
Wall
Sep 26, 2019 · Apt 2
Close - Unsanitary condition
Mold
Sep 26, 2019 · Apt 2
Close - Unsanitary condition
Pests
Sep 26, 2019 · Apt 2
Close - Water leak
Slow leak
Jul 27, 2019 · Apt 2
Close - Paint/plaster
Ceiling
Jul 27, 2019 · Apt 2
Close - Unsanitary condition
Mold
Jun 15, 2019 · Apt 2
Close - Unsanitary condition
Pests
Jun 15, 2019 · Apt 2
Close - Door/window
Door
Jun 15, 2019 · Apt 2
Close - Door/window
Window frame
Feb 4, 2019 · Apt 2
Close - Heat/hot water
Apartment only
Feb 4, 2019 · Apt 2
Close - Unsanitary condition
Pests
Aug 16, 2018 · Apt 2
Close - Water leak
Slow leak
Aug 16, 2018 · Apt 2
Close - Water leak
Slow leak
Aug 16, 2018 · Apt 2
Close - Door/window
Door
Aug 16, 2018 · Apt 2
Close - Unsanitary condition
Mold
Aug 16, 2018 · Apt 2
Close - Plumbing
Water supply
Jul 18, 2018 · Apt 2
Close - Unsanitary condition
Pests
Jul 18, 2018 · Apt 2
Close - Paint/plaster
Ceiling
Jul 18, 2018 · Apt 2
Close - Door/window
Door
Jul 18, 2018 · Apt 2
Close - Plumbing
Water supply
Jul 18, 2018 · Apt 2
Close - Unsanitary condition
Mold
Jul 18, 2018 · Apt 2
Close - Unsanitary condition
Mold
Dec 14, 2017 · Apt 2
Close - Heat/hot water
Apartment only
Dec 14, 2017 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2008
- Floors
- 3
- Residential units
- 3
- Building area
- 2,790 ft²
- Lot area
- 1,206 ft²
- Zoning
- R5
- Community board
- 212
- Council district
- 12
- Block / lot
- 4680 / 41
- Assessed value
- $50,400
- Landmark / historic district
- No
HPD registration #227529, last renewed Aug 19, 2025.
Questions about 806 East 222 Street
Who owns 806 East 222 Street?
The owner of record in NYC Department of City Planning PLUTO data is Qin, Weiping.
Does 806 East 222 Street have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 806 East 222 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 806 East 222 Street built?
City records list 2008 as the year it was built.
How many apartments are in 806 East 222 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.