810 East 216 Street
Bronx, NY 10467BBL 2-04674-0055Map
Owner of record: Starvo III, LLC
810 East 216 Street is a two-family home built in 2005 in Bronx, 10467. It has 2 residential units across 3 floors. The owner of record is Starvo III, LLC. HPD has recorded 25 housing violations here, most recently on August 7, 2015. 10 of the 25 most recent violations are still open.
- HPD violations
- 25
- DOB violations
- 0
- ECB violations
- 6
- HPD complaints
- 86
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- BHazardous
Repair the roof so that it will not leak ceiling in the 2nd room from north located at apt ph, 3rd story, 1st apartment from east at south
Aug 7, 2015 · Apt PH
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from north located at apt ph, 3rd story, 1st apartment from east at south
Aug 7, 2015 · Apt PH
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen and bathroom located at apt 1st, 1st story
Jul 22, 2015 · Apt 1ST
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at kitchen and bathroom located at apt 1st, 1st story
Jul 22, 2015 · Apt 1ST
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures .. in the entire apartment located at apt 2ndfl, 2nd story, apartment at south
Jun 2, 2015 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures .. in the entire apartment located at apt 1, 1st story, apartment at south
Jun 2, 2015 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 1, 1st story, apartment at south
Jun 2, 2015 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 2ndfl, 2nd story, apartment at south
Jun 2, 2015 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ,in bathroom and kitchen located at apt 2ndfl, 2nd story
May 20, 2015 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures ,bathroom and kitchen located at apt 2ndfl, 2nd story
May 20, 2015 · Apt 2NDFL
Closed — Violation closed
Show 15 more ↓
- CImmediately hazardous
Provide adequate supply of hot water for the fixtures ,in the bathroom and kitchen located at apt 1, 1st story
May 20, 2015 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures ,in the bathroom and kitchen located at apt 1, 1st story
May 20, 2015 · Apt 1
Closed — Violation closed - BHazardous
Replace with new the missing bathtub faucet, north bathroom, second level located at apt 2, 2nd story
Jan 7, 2011 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and south wall, 4th room from north, second level located at apt 2, 2nd story
Jan 7, 2011 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and west wall in the kitchen located at apt 2, 2nd story
Jan 7, 2011 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective bannister, east wall, stairs in the private hallway located at apt 2, 2nd story
Jan 7, 2011 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures upper and lower bathroom at duplex located at apt 2, 2nd story, 1st apartment from east at south
Dec 3, 2010 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Dec 3, 2010 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at upper and lower levels bathrooms in the entire apartment located at apt 2, 1st story
Oct 14, 2010 · Apt 2
Open — Nov sent out - BHazardous
Properly secure the loose hand rail at stairs from lower level to upper level of duplex apartment located at apt 2, 1st story
Oct 14, 2010 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceilings in the entire apartment located at apt 1, 1st story
Aug 2, 2010 · Apt 1
Closed — Violation closed - BHazardous
Properly secure the loose wooden handrail at stairs leading to second story bedroom with in apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 24, 2010 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective sagging wood floor in the entrance located at apt 1, 1st story, 1st apartment from north at east
Jan 24, 2010 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color west wall at second story bedroom with in apartment in the 1st room from east located at apt 1, 1st story, 1st apartment from north at east
Jan 24, 2010 · Apt 1
Closed — Violation closed - BHazardous
Provide adequate lighting for boiler room of not less than 60 watts of incandescent lighting at boiler room, 1st story
Jan 24, 2010
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 6
- Hazardous
Failure to safeguard public and property affected by const operation nb 200907297. during insp job site fence missing approx 4' section on right side of new bldg. public has total access to exterior front
Apr 21, 2006 · Penalty $1,000
Resolve - Non-hazardous
No dot permit posted- debris container/ and- excavator in roadway. upon insp. an excavator & a 30 yd debris containeris in st/roadway on opposite side of place of occurance on side of public school ms 113. work
Mar 10, 2006
Resolve - Non-hazardous
Expired permit fence. upon inspection- 8 ft plywood fence const. fenceerected front of site aprox. 50'ft. fence permit #200901248-01-eq fn expired on 12/31/05. remedy: renew fence permit as per bld code.
Feb 15, 2006 · Penalty $250
Resolve - Non-hazardous
Failure to safeguard public and property. upon inspection sidewalk front of 810 e 216 st. is snow covered sidewalk has not had snow removed snow covers entire frontage 5 ft. wide by 50'long accross from public
Feb 15, 2006
Resolve - Hazardous
Failure to obtain a mechanical demolition permit.2 story frame house is being demolished with hitachi equipment at time of insp.no permit for mechanical equipment.remedy:stop all work forthwith/contact bx dob o
Jan 10, 2006 · Penalty $2,000
Resolve - Hazardous
Work w/o a permit-2 story frame house is being demolished with demolishing equipment(hitach1-claw machine)w/o permit for equipment.mechanical demo being performed w/o permits.remedy:stop all work obtain all per
Jan 10, 2006
Resolve
Complaints
- Plumbing
Toilet
Aug 4, 2015 · Apt PH
Close - Plumbing
Water supply
Aug 4, 2015 · Apt PH
Close - Plumbing
Water supply
Jul 15, 2015 · Apt 1ST
Close - Plumbing
Water supply
May 29, 2015 · Apt 2NDFL
Close - Plumbing
Water supply
May 19, 2015 · Apt 1FL
Close - Plumbing
Water supply
May 15, 2015 · Apt 2NDFL
Close - Heating
Heat related
Dec 30, 2011 · Apt 2
Close - Heating
Heat related
Jan 10, 2011 · Apt 2FL
Close - Plumbing
Water supply
Jan 10, 2011 · Apt 2FL
Close - Plumbing
Water supply
Jan 6, 2011 · Apt 2
Close
Show 40 more ↓
- Heating
Heat related
Jan 6, 2011 · Apt 2
Close - Heating
Heat related
Jan 6, 2011 · Apt 2
Close - Plumbing
Water supply
Jan 6, 2011 · Apt 2
Close - Plumbing
Bathtub/shower
Jan 5, 2011 · Apt 2
Close - Heating
Heat related
Nov 30, 2010 · Apt 2
Close - Heating
Heat related
Nov 28, 2010 · Apt 2
Close - Plumbing
Radiator
Oct 6, 2010 · Apt 2
Close - Plumbing
Water supply
Oct 6, 2010 · Apt 2
Close - Nonconst
Carbon monoxide
Aug 1, 2010 · Apt 1
Close - Electric
Wiring
Aug 1, 2010 · Apt 1
Close - Plumbing
Basin/sink
Aug 1, 2010 · Apt 1
Close - Plumbing
Toilet
Aug 1, 2010 · Apt 1
Close - General
Windows
Aug 1, 2010 · Apt 1
Close - Paint/plaster
Wall
Aug 1, 2010 · Apt 1
Close - General
Doors
Aug 1, 2010 · Apt 1
Close - Paint/plaster
Ceiling
Aug 1, 2010 · Apt 1
Close - Nonconst
Smoke detector
Aug 1, 2010 · Apt 1
Close - Heating
Heat related
Aug 1, 2010 · Apt 1
Close - General
Stairs
Aug 1, 2010 · Apt 1
Close - Heating
Heat-plant
Aug 1, 2010 · Apt 1
Close - Plumbing
Toilet
Aug 1, 2010 · Apt 1
Close - Plumbing
Basin/sink
Aug 1, 2010 · Apt 1
Close - Plumbing
Shower-stall
Aug 1, 2010 · Apt 1
Close - Nonconst
Rubbish
Aug 1, 2010 · Apt 1
Close - Electric
Wiring
Aug 1, 2010 · Apt 1
Close - Heating
Heat related
Aug 1, 2010 · Apt 1
Close - General
Stairs
Aug 1, 2010 · Apt 1
Close - Paint/plaster
Wall
Aug 1, 2010 · Apt 1
Close - Paint/plaster
Ceiling
Aug 1, 2010 · Apt 1
Close - Paint/plaster
Wall
Aug 1, 2010 · Apt 1
Close - Paint/plaster
Wall
Aug 1, 2010 · Apt 1
Close - Nonconst
Vermin
Aug 1, 2010 · Apt 1
Close - Paint/plaster
Ceiling
Aug 1, 2010 · Apt 1
Close - Paint/plaster
Wall
Aug 1, 2010 · Apt 1
Close - Nonconst
Vermin
Aug 1, 2010 · Apt 1
Close - Paint/plaster
Wall
Aug 1, 2010 · Apt 1
Close - Electric
Wiring
Aug 1, 2010 · Apt 1
Close - Electric
Wiring
Aug 1, 2010 · Apt 1
Close - Electric
Wiring
Aug 1, 2010 · Apt 1
Close - Plumbing
Shower-stall
Aug 1, 2010 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 2005
- Floors
- 3
- Residential units
- 2
- Building area
- 2,799 ft²
- Lot area
- 1,871 ft²
- Zoning
- R5
- Community board
- 212
- Council district
- 12
- Block / lot
- 4674 / 55
- Assessed value
- $56,040
- Landmark / historic district
- No
Questions about 810 East 216 Street
Who owns 810 East 216 Street?
The owner of record in NYC Department of City Planning PLUTO data is Starvo III, LLC.
Does 810 East 216 Street have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 810 East 216 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 810 East 216 Street built?
City records list 2005 as the year it was built.
How many apartments are in 810 East 216 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.