802 East 215 Street
Bronx, NY 10467BBL 2-04673-0050Map
Owner of record: 802 E 215 LLC
802 East 215 Street is a walk-up apartment building built in 2008 in Bronx, 10467. It has 3 residential units across 3 floors. The owner of record is 802 E 215 LLC. HPD has recorded 173 housing violations here, most recently on September 18, 2026. 35 of the 50 most recent violations are still open.
- HPD violations
- 173
- DOB violations
- 0
- ECB violations
- 9
- HPD complaints
- 71
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 173
- BHazardous
Replace with new the missing floor drain cover at sump pump at boiler room
Sep 18, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at boiler room
Sep 18, 2026
Open — Nov sent out - CImmediately hazardous
§ 12 m/d law discontinue the storage of combustible material propane tank at stair leading to basement , 1st story
Sep 10, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar
Sep 10, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective individual boiler for apartment # 3 at 1st boiler room from east
Aug 7, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective bricks and mortar south exterior wall all storys at south yard
May 18, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at boiler room
May 18, 2026
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection waste pipe under washbasin sink in the bathroom located at apt 1, 1st story, 1st apartment from south at west
May 18, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
May 18, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
May 18, 2026 · Apt 1
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Repair the broken or defective connection waste pipe under sink in the kitchen located at apt 1, 1st story, 1st apartment from south at west
May 18, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 1, 1st story
May 18, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 1, 1st story
May 18, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at west located at apt 1, 1st story, 1st apartment from south at west
May 18, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at west located at apt 1, 1st story, 1st apartment from south at west
May 18, 2026 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at west wall under sink in the kitchen located at apt 1, 1st story, 1st apartment from south at west
May 18, 2026 · Apt 1
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at west wall next the boiler room entrance at cellar
Apr 20, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Apr 20, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling at boiler room
Apr 20, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood sub floor in the 1st room from north located at apt 1, 1st story, 1st apartment from south at west
Apr 20, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 1, 1st story, 1st apartment from south at west
Apr 20, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 1, 1st story, 1st apartment from south at west
Apr 20, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling at public hall
Feb 20, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective cold baseboard radiator in the entire apartment located at apt 1, 1st apartment from south at west
Feb 20, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at bathroom and kitchen in the entire apartment located at apt 1, 1st apartment from south at west
Feb 20, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling at public hall
Feb 20, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective inoperative bell and return buzzer from apt # 1 to building entrance in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 14, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door frame in the 1st room from north at west located at apt 3, 3rd story, 1st apartment from south at west
Dec 22, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Replace with new the missing electric switch cover at east wall in the 1st room from north at west located at apt 3, 3rd story, 1st apartment from south at west
Dec 22, 2025 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Dec 22, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3, 3rd story
Dec 11, 2025 · Apt 3
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at the range in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Mar 19, 2025 · Apt 3
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible, electric range in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Mar 19, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection at apt # 3 hot water supply line tap-in to the apt # 2 hot water supply line at boiler room
Mar 19, 2025
Open — First no access to re- inspect violation - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration apt # 3 hot water tank connected from apt # 2 hot water tank. at boiler room
Mar 14, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Mar 14, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective cracks and holes at stucco of the exterior wall, from 3rd story to roof at rear wall of the buliding , 3rd story
Mar 14, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of apt # 3 hot water tank connected from apt # 2 hot water tank. at boiler room
Mar 14, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th bathroom from east at south located at apt 3, 3rd story, 1st apartment from south at west
Mar 14, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the 4th bathroom from east at south located at apt 3, 3rd story, 1st apartment from south at west
Mar 14, 2025 · Apt 3
Closed — Violation closed - CImmediately hazardous
Replace with new the missing electrical outlet cover at west wall in the 3rd room from east at south located at apt 3, 3rd story, 1st apartment from south at west
Mar 14, 2025 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures electrical outlet at west wall in the 3rd room from east at south located at apt 3, 3rd story, 1st apartment from south at west
Mar 14, 2025 · Apt 3
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at south located at apt 3, 3rd story, 1st apartment from south at west
Mar 14, 2025 · Apt 3
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from east at south located at apt 3, 3rd story, 1st apartment from south at west
Mar 14, 2025 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 3, 3rd story, 1st apartment from south at west
Mar 14, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from east located at apt 3, 3rd story, 1st apartment from south at west
Mar 14, 2025 · Apt 3
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entrance located at apt 3, 3rd story, 1st apartment from south at west
Mar 14, 2025 · Apt 3
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 9
- Class - 1
A8- at time of inspection was observed facade in state of des-repair, stucco has cracks at exp#03 also vertical crack along the wall corner of exp#3&4, repair and/replace
May 19, 2026 · Penalty $12,500
Active - Class - 2
Found 3 non jurisdictional peerless boilers not operable, job has exposed wiring, defective safety relief valve, flue pipe not properly supported, boiler room door not self closing., maintain boiler; repair boi
Nov 23, 2022 · Penalty $3,125
Active - Class - 2
Failure to maintain building in code compliant manner.noted:at time of inspection observed stucco veneer at exposure#3 has cracking from 1st floor to roof along with gutter not connected at roof scupper where i
Jul 11, 2020 · Penalty $3,125
Active - Non-hazardous
Expired permit- expired demolition permit. upon inspection roof removed 1st fl. remains and partical 2nd fl. demolition permit #200906430 has expired on 02/17/06. remedy: stop all demolition work- renew permit
Feb 22, 2006 · Penalty $250
Resolve - Non-hazardous
Expired permit- fence. upon inspection 8 ft plywood const. fence erected front and sides of site. fence permit #200906430-01-eq. fn has expired on 02/17/06. remedy: renew fence permit as per bld code.
Feb 22, 2006 · Penalty $250
Resolve - Non-hazardous
Failure to provide a contractor's sign. upon inspection structure remains 1 and 2nd floors all wall of 2nd fl removed no contractors sign posted at site. remedy: post a contractors sign name of demolition
Feb 22, 2006 · Penalty $250
Resolve - Hazardous
Failure to notify the d.o.b. prior to the commencement of demolition work: active demo site house down to 1st floor. no 24 hour notice has been given to d.o.b. prior to demolition. remedy: stop all work, notify
Feb 16, 2006 · Penalty $500
Resolve - Hazardous
Work without a permit. upon inspection; house has been partially demoed, windows outsiding off house doors removed exterior, without a demo permit. d.o.b records indicate no permit has been issued. remedy: obta
Dec 19, 2005 · Penalty $800
Resolve - Non-hazardous
Failure to maintain building.defect noted:aluminum siding at the north and top facade is hanging.remedy:maintain exterior of building.
Apr 9, 2001 · Penalty $2,500
Resolve
Complaints
- Plumbing
Boiler
May 13, 2026 · Apt 1
Close - Flooring/stairs
Floor
May 13, 2026 · Apt 1
Close - Water leak
Slow leak
May 13, 2026 · Apt 1
Close - Appliance
Electric/gas range
May 13, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Feb 24, 2026 · Apt 1
Close - Water leak
Slow leak
Feb 24, 2026 · Apt 1
Close - Flooring/stairs
Floor
Feb 24, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Feb 19, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Feb 19, 2026 · Apt 1
Close - General
Bell/buzzer/intercom
Dec 23, 2025 · Apt 802
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Dec 9, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Jan 6, 2025 · Apt 1
Close - Paint/plaster
Wall
Jan 6, 2025 · Apt 1
Close - Water leak
Slow leak
Jan 6, 2025 · Apt 1
Close - Paint/plaster
Wall
Jan 6, 2025 · Apt 1
Close - General
Cabinet
Jan 6, 2025 · Apt 1
Close - Unsanitary condition
Mold
Jan 6, 2025 · Apt 1
Close - Door/window
Door
Jun 2, 2024 · Apt 1
Close - Water leak
Heavy flow
Jun 2, 2024 · Apt 1
Close - Unsanitary condition
Mold
Jun 2, 2024 · Apt 1
Close - Paint/plaster
Wall
Jun 2, 2024 · Apt 1
Close - General
Cabinet
Jun 2, 2024 · Apt 1
Close - Electric
Lighting
Apr 27, 2024 · Apt 1
Close - General
Mailbox
Apr 27, 2024 · Apt 1
Close - Electric
Power outage
Jun 3, 2023 · Apt 1
Close - Electric
Power outage
Apr 23, 2023 · Apt 1
Close - Electric
No lighting
Oct 24, 2022 · Apt 1
Close - Water leak
Damp spot
Oct 5, 2022 · Apt 1
Close - Electric
Power outage
Oct 5, 2022 · Apt 1
Close - Unsanitary condition
Mold
Oct 22, 2021 · Apt 1
Close - Unsanitary condition
Mold
Oct 22, 2021 · Apt 1
Close - Unsanitary condition
Mold
Sep 14, 2021 · Apt 1
Close - Unsanitary condition
Mold
Sep 14, 2021 · Apt 1
Close - Unsanitary condition
Mold
Aug 2, 2021 · Apt 1
Close - Unsanitary condition
Mold
Jun 1, 2021 · Apt BASEME
Close - Unsanitary condition
Mold
Jun 1, 2021 · Apt 1
Close - Unsanitary condition
Mold
May 25, 2021 · Apt 1
Close - Water leak
Heavy flow
May 20, 2021 · Apt 1
Close - Unsanitary condition
Mold
May 20, 2021 · Apt 1
Close - Unsanitary condition
Mold
May 18, 2021 · Apt 1
Close - Heat/hot water
Apartment only
May 18, 2021 · Apt 1
Close - General
Janitor/super
May 18, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Mar 5, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Mar 2, 2021 · Apt 1
Close - Unsanitary condition
Mold
Dec 9, 2020 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Dec 9, 2020 · Apt 1
Close - Unsanitary condition
Mold
Dec 9, 2020 · Apt 1
Close - Heat/hot water
Apartment only
Dec 7, 2020 · Apt 1
Close - Plumbing
Water supply
Nov 30, 2020 · Apt 1
Close - Heat/hot water
Apartment only
Oct 30, 2020 · Apt 2FLOOR
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2008
- Floors
- 3
- Residential units
- 3
- Building area
- 3,015 ft²
- Lot area
- 1,346 ft²
- Zoning
- R5
- Community board
- 212
- Council district
- 12
- Block / lot
- 4673 / 50
- Assessed value
- $69,120
- Landmark / historic district
- No
HPD registration #227151, last renewed Jan 5, 2018.
Questions about 802 East 215 Street
Who owns 802 East 215 Street?
The owner of record in NYC Department of City Planning PLUTO data is 802 E 215 LLC.
Does 802 East 215 Street have violations?
Yes. NYC HPD has recorded 173 housing violations at this property.
Is 802 East 215 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 802 East 215 Street built?
City records list 2008 as the year it was built.
How many apartments are in 802 East 215 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.