roofy

652 East 219 Street

Bronx, NY 10467BBL 2-04650-0046Map

Owner of record: Sanchez, Ninfa

652 East 219 Street is a walk-up apartment building built in 2005 in Bronx, 10467. It has 3 residential units across 3 floors. The owner of record is Sanchez, Ninfa. HPD has recorded 79 housing violations here, most recently on May 8, 2026. 42 of the 50 most recent violations are still open.

HPD violations
79
DOB violations
0
ECB violations
0
HPD complaints
75

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 8, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 79

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective doors at cabinets on upper south and west walls in the kitchen located at apt 3rdflo, 3rd story, 1st apartment from south at west

    Apr 14, 2026 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective drawer at lower base cabinet on west wall in the kitchen located at apt 3rdflo, 3rd story, 1st apartment from south at west

    Apr 14, 2026 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective wood door at lower base cabinet on west wall in the kitchen located at apt 3rdflo, 3rd story, 1st apartment from south at west

    Apr 14, 2026 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. at ceiling in the bathroom located at apt 3rdflo, 3rd story, 1st apartment from south at west

    Apr 14, 2026 · Apt 3RDFLO

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective mortise lock on fire rated door in the entrance located at apt 3rdflo, 3rd story, 1st apartment from south at west

    Apr 14, 2026 · Apt 3RDFLO

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceilings and all walls in the entire apartment located at apt 3rdflo, 3rd story, 1st apartment from south at west

    Apr 14, 2026 · Apt 3RDFLO

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. at ceiling in the bathroom located at apt 3rdflo, 3rd story, 1st apartment from south at west original violation 18799069 issued 14-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Apr 14, 2026 · Apt 3RDFLO

    Open — Notice of issuance sent to tenant
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 18, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 13, 2025

    Open — Nov sent out
Show 40 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 25, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 17, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 30, 2023

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 9, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 9, 2022

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall over window in the 4th room from north at west located at apt 3, 3rd story, 1st apartment from south at west

    Oct 5, 2020 · Apt 3

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 3rd room from north at east located at apt 3, 3rd story, 1st apartment from south at west

    Oct 5, 2020 · Apt 3

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at east located at apt 3, 3rd story, 1st apartment from south at west

    Oct 5, 2020 · Apt 3

    Open — Nov sent out
  • A

    Properly repair the broken or defective drawer at base cabinet in the kitchen located at apt 3, 3rd story, 1st apartment from south at west

    Oct 5, 2020 · Apt 3

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall

    Apr 15, 2020

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Mar 18, 2020

    Open — Nov sent out
  • A

    Paint or post a sign indicating floors at 1st, 2nd and 3rd story at public hall

    Mar 18, 2020

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Mar 18, 2020

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ..

    Mar 18, 2020

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at or near mailbox and at the boiler room door.

    Mar 18, 2020

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 30, 2019

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Dec 30, 2019

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story

    Dec 30, 2019

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 30, 2019

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Dec 30, 2019

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Dec 30, 2019

    Open — Nov sent out
  • A

    Repair the leaky and/or defective faucets at bathtub in the 4th bathroom from north at east located at apt 2, 2nd story, 1st apartment from south at west

    Sep 11, 2018 · Apt 2

    Open — Nov sent out
  • C

    Remove all obstructions from water closet .. in the 3rd bathroom from north at west located at apt 2, 2nd story, 1st apartment from south at west

    Sep 11, 2018 · Apt 2

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Sep 11, 2018 · Apt 2

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 11, 2018

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Sep 11, 2018

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story

    Sep 11, 2018

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story

    Sep 11, 2018

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 11, 2018

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Sep 11, 2018

    Open — Nov sent out
  • A

    Paint or post a sign indicating floors .. at public hall, 1st story

    Sep 11, 2018

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Sep 11, 2018

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 11, 2018

    Open — Nov sent out
  • B

    Remove the illegal fastening slide bolt capablae of being padlocked at front building gate

    Sep 11, 2018

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 2, 2018

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 2, 2018

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Sep 2, 2018

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story

    Sep 2, 2018

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • General

    Cabinet

    Mar 22, 2026 · Apt 3RDFLO

    Close
  • Unsanitary condition

    Mold

    Mar 22, 2026 · Apt 3RDFLO

    Close
  • Electric

    Outlet/switch

    Mar 22, 2026 · Apt 3RDFLO

    Close
  • Paint/plaster

    Ceiling

    Mar 22, 2026 · Apt 3RDFLO

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2024 · Apt 3RDFLO

    Close
  • Water leak

    Slow leak

    Jan 17, 2024 · Apt 3RDFLO

    Close
  • Paint/plaster

    Ceiling

    Oct 1, 2020 · Apt 3

    Close
  • Paint/plaster

    Window/frame

    Oct 1, 2020 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Oct 1, 2020 · Apt 3

    Close
  • Paint/plaster

    Wall

    Oct 1, 2020 · Apt 3

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Mar 11, 2020 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Mar 11, 2020 · Apt BLDG

    Close
  • General

    Signage missing

    Mar 11, 2020 · Apt BLDG

    Close
  • General

    Signage missing

    Mar 11, 2020 · Apt BLDG

    Close
  • General

    Signage missing

    Mar 11, 2020 · Apt BLDG

    Close
  • General

    Signage missing

    Mar 11, 2020 · Apt BLDG

    Close
  • General

    Signage missing

    Mar 11, 2020 · Apt BLDG

    Close
  • General

    Signage missing

    Mar 11, 2020 · Apt BLDG

    Close
  • General

    Signage missing

    Mar 11, 2020 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 24, 2019 · Apt NA

    Close
  • Paint/plaster

    Wall

    Dec 24, 2019 · Apt NA

    Close
  • Paint/plaster

    Ceiling

    Dec 24, 2019 · Apt NA

    Close
  • Paint/plaster

    Ceiling

    Dec 24, 2019 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Dec 23, 2019 · Apt 3

    Close
  • Paint/plaster

    Window/frame

    Dec 23, 2019 · Apt 3

    Close
  • Paint/plaster

    Wall

    Dec 23, 2019 · Apt 3

    Close
  • Paint/plaster

    Window/frame

    Dec 23, 2019 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Dec 23, 2019 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Dec 23, 2019 · Apt 3

    Close
  • Plumbing

    Bathtub/shower

    Aug 19, 2018 · Apt 2

    Close
  • Plumbing

    Toilet

    Aug 19, 2018 · Apt 2

    Close
  • Plumbing

    Toilet

    Aug 8, 2018 · Apt 2FL

    Close
  • Plumbing

    Bathtub/shower

    Aug 8, 2018 · Apt 2FL

    Close
  • Heat/hot water

    Apartment only

    Sep 11, 2016 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Sep 4, 2016 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Nov 16, 2015 · Apt 1FL

    Close
  • General

    Mailbox

    Nov 16, 2015 · Apt 1FL

    Close
  • Door/window

    Door

    Nov 16, 2015 · Apt 1FL

    Close
  • Plumbing

    Toilet

    Nov 16, 2015 · Apt 1FL

    Close
  • Electric

    Lighting

    Nov 16, 2015 · Apt 1FL

    Close
  • Electric

    Wiring

    Nov 16, 2015 · Apt 1FL

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2015 · Apt 1FL

    Close
  • General

    Mailbox

    Nov 6, 2015 · Apt 1FL

    Close
  • Electric

    Wiring

    Nov 2, 2015 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 2, 2015 · Apt 1FL

    Close
  • Electric

    No lighting

    Nov 1, 2015 · Apt 1

    Close
  • Electric

    Power outage

    Nov 1, 2015 · Apt 1

    Close
  • General

    Mailbox

    Nov 1, 2015 · Apt 1FL

    Close
  • Heat/hot water

    Apartment only

    Oct 31, 2015 · Apt 1STFL

    Close
  • Paint/plaster

    Ceiling

    Aug 31, 2015 · Apt 1STFL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
2005
Floors
3
Residential units
3
Building area
2,970 ft²
Lot area
1,700 ft²
Zoning
R5A
Community board
212
Council district
12
Block / lot
4650 / 46
Assessed value
$61,200
Landmark / historic district
No

HPD registration #225517, last renewed Dec 19, 2025.

Questions about 652 East 219 Street

Who owns 652 East 219 Street?

The owner of record in NYC Department of City Planning PLUTO data is Sanchez, Ninfa.

Does 652 East 219 Street have violations?

Yes. NYC HPD has recorded 79 housing violations at this property.

Is 652 East 219 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 652 East 219 Street built?

City records list 2005 as the year it was built.

How many apartments are in 652 East 219 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.