roofy

980 East Gun Hill Road

Bronx, NY 10469BBL 2-04636-0041Map

Owner of record: Ab2 Corp.

980 East Gun Hill Road is a mixed residential and retail building built in 1940 in Bronx, 10469. It has 1 residential unit across 2 floors. The owner of record is Ab2 Corp.. HPD has recorded 14 housing violations here, most recently on March 29, 2025. 13 of the 14 most recent violations are still open.

HPD violations
14
DOB violations
31
ECB violations
4
HPD complaints
34

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 29, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 14

  • B

    Properly repair with similar material the broken or defective broken 1st and 2nd cement window sills from east at north (building front) , 2nd story

    Mar 29, 2025

    Open — Nov sent out
  • A

    Provide a separate house sewer and house drain properly connected to plumbing system of the building and to main sewer and file an application for approval before doing this work.

    Jun 27, 2024 · Apt APT1

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the 1st room from north located at apt apt1, 2nd story, 1st apartment from north at east

    Jun 27, 2024 · Apt APT1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood base cabinet at washbasin in the bathroom located at apt apt1, 2nd story, 1st apartment from north at east

    Jun 27, 2024 · Apt APT1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower window sash so as to make operable in the 2nd room from north located at apt apt1, 2nd story, 1st apartment from north at east

    Jun 27, 2024 · Apt APT1

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt apt1, 2nd story, 1st apartment from north at east

    Jun 27, 2024 · Apt APT1

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... less then 10 sq.ft. at east wall in the 2nd room from north located at apt apt1, 2nd story, 1st apartment from north at east

    Jun 27, 2024 · Apt APT1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the east wall, west wall in the private hallway located at apt apt1, 2nd story, 1st apartment from north at east

    Jun 27, 2024 · Apt APT1

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in drain pipe at washbasin in the bathroom located at apt apt1, 2nd story, 1st apartment from north at east

    Jun 27, 2024 · Apt APT1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt apt1, 2nd story, 1st apartment from north at east

    Jun 27, 2024 · Apt APT1

    Open — Nov sent out
Show 4 more ↓
  • B

    Properly repair or replace the broken or defective electrical outlet safty covers plate at north wall, east wall, south wall, and west wall in the 2nd room from north located at apt apt1, 2nd story, 1st apartment from north at east

    Jun 27, 2024 · Apt APT1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north located at apt apt1, 2nd story, 1st apartment from north at east

    Jun 27, 2024 · Apt APT1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the kitchen , the private hallway located at apt apt1, 2nd story, 1st apartment from north at east

    Jun 27, 2024 · Apt APT1

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less then 10 sq.ft. at east wall in the 2nd room from north located at apt apt1, 2nd story, 1st apartment from north at east original violation 17089035 issued 27-jun-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jun 27, 2024 · Apt APT1

    Open — First no access to re- inspect violation

DOB building violations · 31

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
Show 21 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed
  • Boiler boiler optional

    36

    Nov 20, 1989

    Dob violation - dismissed

ECB violations · 4

  • Class - 1

    I observed unsafe unsuitable electrical wiring and installation, open electrical boxes exposing live wires, open junction boxes exposing live wires, ground wire used as ungrounded conductor, comply with ec; fix

    Aug 29, 2026 · Penalty $1,600

    Active
  • Class - 1

    I observed electrical work for hvac motors, wiring, disconnects without a permit on file, obtain permit; obtain an electrical permit

    Aug 29, 2026 · Penalty $2,500

    Active
  • Class - 1

    Observed in pets home away from home store on ground floor no sprinkler system in place which contrary to code refer to section bc 903.2.2.2, provide a system of automatic sprinklers where required

    Jun 23, 2023 · Penalty $12,500

    Active
  • Non-hazardous

    Boiler not registered.

    Nov 20, 1989

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Jun 25, 2024 · Apt APT1

    Close
  • Unsanitary condition

    Mold

    Jun 25, 2024 · Apt APT1

    Close
  • Unsanitary condition

    Pests

    Jun 25, 2024 · Apt APT1

    Close
  • Unsanitary condition

    Pests

    May 16, 2024 · Apt 1

    Close
  • Unsanitary condition

    Mold

    May 16, 2024 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    May 16, 2024 · Apt 1

    Close
  • Paint/plaster

    Wall

    May 16, 2024 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Nov 22, 2018 · Apt BLDG

    Close
  • Heating

    Heat related

    Mar 20, 2013 · Apt 2

    Close
  • Plumbing

    Radiator

    Mar 20, 2013 · Apt 2

    Close
Show 24 more ↓
  • Paint/plaster

    Wall

    Mar 20, 2013 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Mar 20, 2013 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Mar 20, 2013 · Apt 2

    Close
  • General

    Doors

    Mar 20, 2013 · Apt 2

    Close
  • General

    Mold

    Mar 20, 2013 · Apt 2

    Close
  • Electric

    Wiring

    Mar 20, 2013 · Apt 2

    Close
  • Plumbing

    Radiator

    Mar 20, 2013 · Apt 2

    Close
  • Plumbing

    Radiator

    Mar 20, 2013 · Apt 2

    Close
  • Paint/plaster

    Wall

    Mar 20, 2013 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Mar 20, 2013 · Apt 2

    Close
  • General

    Doors

    Mar 20, 2013 · Apt 2

    Close
  • Electric

    Electric-supply

    Apr 25, 2012 · Apt 1

    Close
  • Heating

    Heat related

    Nov 19, 2011 · Apt 1

    Close
  • Heating

    Heat related

    Nov 18, 2011 · Apt 2B

    Close
  • Heating

    Heat related

    Nov 6, 2011 · Apt 1

    Close
  • Heating

    Heat related

    Apr 22, 2011 · Apt 2B

    Close
  • Heating

    Heat related

    Jan 22, 2008 · Apt 1

    Close
  • Electric

    Electric-supply

    Aug 2, 2007 · Apt 1

    Close
  • Electric

    Electric-supply

    Aug 1, 2007 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Jul 31, 2007 · Apt 1

    Close
  • General

    Windows

    Jul 31, 2007 · Apt 1

    Close
  • Electric

    Electric-supply

    Jul 31, 2007 · Apt 1

    Close
  • Nonconst

    Vermin

    Jul 31, 2007 · Apt 1

    Close
  • General

    Windows

    Jul 31, 2007 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S1)
Year built
1940
Floors
2
Residential units
1
Building area
912 ft²
Lot area
2,500 ft²
Zoning
R6A
Community board
212
Council district
12
Block / lot
4636 / 41
Assessed value
$31,500
Landmark / historic district
No

HPD registration #716438, last renewed Apr 22, 2026.

Questions about 980 East Gun Hill Road

Who owns 980 East Gun Hill Road?

The owner of record in NYC Department of City Planning PLUTO data is Ab2 Corp..

Does 980 East Gun Hill Road have violations?

Yes. NYC HPD has recorded 14 housing violations at this property.

Is 980 East Gun Hill Road rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 980 East Gun Hill Road built?

City records list 1940 as the year it was built.

How many apartments are in 980 East Gun Hill Road?

It has 1 residential units and 2 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.