980 East Gun Hill Road
Bronx, NY 10469BBL 2-04636-0041Map
Owner of record: Ab2 Corp.
980 East Gun Hill Road is a mixed residential and retail building built in 1940 in Bronx, 10469. It has 1 residential unit across 2 floors. The owner of record is Ab2 Corp.. HPD has recorded 14 housing violations here, most recently on March 29, 2025. 13 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 31
- ECB violations
- 4
- HPD complaints
- 34
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- BHazardous
Properly repair with similar material the broken or defective broken 1st and 2nd cement window sills from east at north (building front) , 2nd story
Mar 29, 2025
Open — Nov sent out - ANon-hazardous
Provide a separate house sewer and house drain properly connected to plumbing system of the building and to main sewer and file an application for approval before doing this work.
Jun 27, 2024 · Apt APT1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the 1st room from north located at apt apt1, 2nd story, 1st apartment from north at east
Jun 27, 2024 · Apt APT1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood base cabinet at washbasin in the bathroom located at apt apt1, 2nd story, 1st apartment from north at east
Jun 27, 2024 · Apt APT1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash so as to make operable in the 2nd room from north located at apt apt1, 2nd story, 1st apartment from north at east
Jun 27, 2024 · Apt APT1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt apt1, 2nd story, 1st apartment from north at east
Jun 27, 2024 · Apt APT1
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq.ft. at east wall in the 2nd room from north located at apt apt1, 2nd story, 1st apartment from north at east
Jun 27, 2024 · Apt APT1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east wall, west wall in the private hallway located at apt apt1, 2nd story, 1st apartment from north at east
Jun 27, 2024 · Apt APT1
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain pipe at washbasin in the bathroom located at apt apt1, 2nd story, 1st apartment from north at east
Jun 27, 2024 · Apt APT1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt apt1, 2nd story, 1st apartment from north at east
Jun 27, 2024 · Apt APT1
Open — Nov sent out
Show 4 more ↓
- BHazardous
Properly repair or replace the broken or defective electrical outlet safty covers plate at north wall, east wall, south wall, and west wall in the 2nd room from north located at apt apt1, 2nd story, 1st apartment from north at east
Jun 27, 2024 · Apt APT1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north located at apt apt1, 2nd story, 1st apartment from north at east
Jun 27, 2024 · Apt APT1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the kitchen , the private hallway located at apt apt1, 2nd story, 1st apartment from north at east
Jun 27, 2024 · Apt APT1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq.ft. at east wall in the 2nd room from north located at apt apt1, 2nd story, 1st apartment from north at east original violation 17089035 issued 27-jun-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 27, 2024 · Apt APT1
Open — First no access to re- inspect violation
DOB building violations · 31
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 21 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed - Boiler boiler optional
36
Nov 20, 1989
Dob violation - dismissed
ECB violations · 4
- Class - 1
I observed unsafe unsuitable electrical wiring and installation, open electrical boxes exposing live wires, open junction boxes exposing live wires, ground wire used as ungrounded conductor, comply with ec; fix
Aug 29, 2026 · Penalty $1,600
Active - Class - 1
I observed electrical work for hvac motors, wiring, disconnects without a permit on file, obtain permit; obtain an electrical permit
Aug 29, 2026 · Penalty $2,500
Active - Class - 1
Observed in pets home away from home store on ground floor no sprinkler system in place which contrary to code refer to section bc 903.2.2.2, provide a system of automatic sprinklers where required
Jun 23, 2023 · Penalty $12,500
Active - Non-hazardous
Boiler not registered.
Nov 20, 1989
Resolve
Complaints
- Unsanitary condition
Mold
Jun 25, 2024 · Apt APT1
Close - Unsanitary condition
Mold
Jun 25, 2024 · Apt APT1
Close - Unsanitary condition
Pests
Jun 25, 2024 · Apt APT1
Close - Unsanitary condition
Pests
May 16, 2024 · Apt 1
Close - Unsanitary condition
Mold
May 16, 2024 · Apt 1
Close - Paint/plaster
Ceiling
May 16, 2024 · Apt 1
Close - Paint/plaster
Wall
May 16, 2024 · Apt 1
Close - Heat/hot water
Entire building
Nov 22, 2018 · Apt BLDG
Close - Heating
Heat related
Mar 20, 2013 · Apt 2
Close - Plumbing
Radiator
Mar 20, 2013 · Apt 2
Close
Show 24 more ↓
- Paint/plaster
Wall
Mar 20, 2013 · Apt 2
Close - Appliance
Electric/gas range
Mar 20, 2013 · Apt 2
Close - Plumbing
Basin/sink
Mar 20, 2013 · Apt 2
Close - General
Doors
Mar 20, 2013 · Apt 2
Close - General
Mold
Mar 20, 2013 · Apt 2
Close - Electric
Wiring
Mar 20, 2013 · Apt 2
Close - Plumbing
Radiator
Mar 20, 2013 · Apt 2
Close - Plumbing
Radiator
Mar 20, 2013 · Apt 2
Close - Paint/plaster
Wall
Mar 20, 2013 · Apt 2
Close - Paint/plaster
Ceiling
Mar 20, 2013 · Apt 2
Close - General
Doors
Mar 20, 2013 · Apt 2
Close - Electric
Electric-supply
Apr 25, 2012 · Apt 1
Close - Heating
Heat related
Nov 19, 2011 · Apt 1
Close - Heating
Heat related
Nov 18, 2011 · Apt 2B
Close - Heating
Heat related
Nov 6, 2011 · Apt 1
Close - Heating
Heat related
Apr 22, 2011 · Apt 2B
Close - Heating
Heat related
Jan 22, 2008 · Apt 1
Close - Electric
Electric-supply
Aug 2, 2007 · Apt 1
Close - Electric
Electric-supply
Aug 1, 2007 · Apt 1
Close - Plumbing
Basin/sink
Jul 31, 2007 · Apt 1
Close - General
Windows
Jul 31, 2007 · Apt 1
Close - Electric
Electric-supply
Jul 31, 2007 · Apt 1
Close - Nonconst
Vermin
Jul 31, 2007 · Apt 1
Close - General
Windows
Jul 31, 2007 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S1)
- Year built
- 1940
- Floors
- 2
- Residential units
- 1
- Building area
- 912 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6A
- Community board
- 212
- Council district
- 12
- Block / lot
- 4636 / 41
- Assessed value
- $31,500
- Landmark / historic district
- No
HPD registration #716438, last renewed Apr 22, 2026.
Questions about 980 East Gun Hill Road
Who owns 980 East Gun Hill Road?
The owner of record in NYC Department of City Planning PLUTO data is Ab2 Corp..
Does 980 East Gun Hill Road have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 980 East Gun Hill Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 980 East Gun Hill Road built?
City records list 1940 as the year it was built.
How many apartments are in 980 East Gun Hill Road?
It has 1 residential units and 2 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.