3011 Paulding Avenue
Bronx, NY 10469BBL 2-04576-0051Map
Owner of record: 13 L&D Realty LLC
3011 Paulding Avenue is a walk-up apartment building built in 1931 in Bronx, 10469. It has 5 residential units across 3 floors. The owner of record is 13 L&D Realty LLC. HPD has recorded 499 housing violations here, most recently on June 11, 2026. 4 of the 50 most recent violations are still open.
- HPD violations
- 499
- DOB violations
- 3
- ECB violations
- 7
- HPD complaints
- 569
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 499
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings sign missing
Jun 11, 2026
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 11, 2026
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling light fixture at public hall, 1st story
Jun 11, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Nov 14, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 4th room from east located at apt 3r, 3rd story, 1st apartment from south at west
Nov 14, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from south at west
Nov 14, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Nov 14, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the 4th room from east located at apt 3r, 3rd story, 1st apartment from south at west
Nov 14, 2025 · Apt 3R
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from south at west
Nov 14, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Nov 12, 2025 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective shut-off knob to radiator in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west
Nov 12, 2025 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Nov 12, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceed 130 degrees in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Nov 12, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceed 130 degrees in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Nov 12, 2025 · Apt 2R
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of dresser obstructing way out in the 4th room from east located at apt 3r, 3rd story, 1st apartment from south at west
Nov 12, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective radiator shut-off knob in the 4th room from east located at apt 3r, 3rd story, 1st apartment from south at west
Nov 12, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective bell buzzer /intercom system leading from building front entrance door to north wall in the kitchen located at apt 3r, 3rd story, 1st apartment from south at west
Nov 12, 2025 · Apt 3R
Open — Not complied with - BHazardous
Replace with new the missing shut-off knob at radiator in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west
Nov 11, 2025 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Nov 11, 2025 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 11, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Nov 11, 2025 · Apt 2R
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall in the 4th room from east at north located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the foyer , the bathroom , the kitchen , the 2nd room from east located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at north wall, baseboard at west wall in the 4th room from east at north located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 square feet at the ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall in the 4th room from east at south located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 4th room from east at north located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the 4th room from east at north located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door in the 4th room from east at south located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 4th room from east at south located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 4th room from east at south located at apt 3r, 3rd story, 1st apartment from south at west
Oct 24, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Sep 17, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Sep 17, 2025
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the consisting of television, card board garbagebags , and othe micellaneouse items at building front yard
Sep 15, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Oct 29, 2024 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
May 30, 2024 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
May 30, 2024 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
May 30, 2024 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the bathroom located at apt 1f, 1st story, 1st apartment from north at east
May 30, 2024 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom located at apt 1f, 1st story, 1st apartment from north at east
May 30, 2024 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from north at east
May 30, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from north at east
May 30, 2024 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective door knocker in the entrance located at apt 1f, 1st story, 1st apartment from north at east
May 30, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bell and buzzer/return intercom system building entrance to apartment wall pannel in the kitchen located at apt 1f, 1st story, 1st apartment from north at east
May 30, 2024 · Apt 1F
Closed — Violation dismissed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Construction other optional
C-construction other optional
Jul 18, 2002
Vw*-violation - work w/o permit dismissed
ECB violations · 7
- Class - 2
B254.15.19a.32a.50a.50b.50c.50d.50e.50f.50g.50a no darkit 50b cannot feed directly to boiler 50c ceiling falling on top of boiler 50d mixing valve leaking 50e jacket off boiler 50f seal base of chimney 50g no
Feb 1, 2010 · Penalty $2,500
Active - Class - 1
Failure to maintain bldg in code complaint manner. noted: roof in disrepair ; coping on parapet tared @ all joints (temp fix) there is tarpaper cover part of decorative parapet @ front. inside face of parapet
Dec 9, 2009 · Penalty $1,000
Active - Class - 1
Failure to provide unobstructed exit passageway noted egress to streetfor rear fire escape ( serving 2 apts) is blocked @ side alleyway by a chaired padlocked gate. remedy: remove obstruction forthwith maintia
Dec 9, 2009
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families hpd blue card. from legal use: cellar no occupancy. to illegal use: three s.r.o. location: cellar.
Jan 13, 2003
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families hpd blue cards from legal use one apt to illegal use 3 families location cellar remedy discontinue illegal use
Jul 18, 2002 · Penalty $8,750
Active - Non-hazardous
Work without a permit hpd blue cards work noted two class"a"apartments constructed at cellar 3 pc bathrooms and kitchen sinks and gas stoves installed remedy file plans to legalize or obtain permits to remove
May 24, 2002 · Penalty $800
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families from legal one family in cellar as per hpd blue cards to illegal three families in cellar remedy discontinue
May 24, 2002 · Penalty $5,300
Active
Complaints
- Heat/hot water
Entire building
Oct 23, 2026 · Apt 2R
Open - Heat/hot water
Entire building
Oct 19, 2026 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
May 28, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 28, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 11, 2026 · Apt 1F
Close - Flooring/stairs
Floor
Feb 11, 2026 · Apt 1F
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt 2R
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt 2R
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt 2R
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt 1F
Close - Heat/hot water
Apartment only
Dec 25, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Dec 24, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Nov 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 23, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 13, 2025 · Apt 3R
Close - Electric
Power outage
Nov 12, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt 2R
Close - Heat/hot water
Apartment only
Nov 12, 2025 · Apt 3R
Close - General
Janitor/super
Nov 12, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt 1F
Close - Heat/hot water
Apartment only
Nov 12, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 2R
Close - Electric
Power outage
Nov 11, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt 2R
Close - Electric
Power outage
Nov 8, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 6, 2025 · Apt 2R
Close - Heat/hot water
Apartment only
Nov 5, 2025 · Apt 1R
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt 1R
Close - Heat/hot water
Entire building
Nov 2, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Nov 2, 2025 · Apt 1R
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Oct 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 5
- Building area
- 4,920 ft²
- Lot area
- 3,685 ft²
- Zoning
- R5
- Community board
- 212
- Council district
- 12
- Block / lot
- 4576 / 51
- Assessed value
- $272,250
- Landmark / historic district
- No
HPD registration #218536, last renewed Nov 26, 2025.
Questions about 3011 Paulding Avenue
Who owns 3011 Paulding Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 13 L&D Realty LLC.
Does 3011 Paulding Avenue have violations?
Yes. NYC HPD has recorded 499 housing violations at this property.
Is 3011 Paulding Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3011 Paulding Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 3011 Paulding Avenue?
It has 5 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.