roofy

2539 Radcliff Avenue

Bronx, NY 10469BBL 2-04445-0058Map

Owner of record: Chigbu, Lois E

2539 Radcliff Avenue is a two-family home built in 1935 in Bronx, 10469. It has 2 residential units across 2 floors. The owner of record is Chigbu, Lois E. HPD has recorded 79 housing violations here, most recently on May 30, 2026. 33 of the 50 most recent violations are still open.

HPD violations
79
DOB violations
0
ECB violations
4
HPD complaints
119

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 79

  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st apartment from west at north

    May 30, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixtures at ceiling in the bathroom located at apt 1, 1st apartment from west at north

    May 30, 2026 · Apt 1

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Apr 11, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 4th room from east, the 3rd room from east, the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Mar 3, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective closet doors at north wall in the 4th room from east located at apt 1, 1st story, 1st apartment from west at north

    Mar 3, 2026 · Apt 1

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of hot water exceeds maximum allowable temperature of 130 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2026 · Apt 1

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective glass pane at the 1st door from east at south in the entrance located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2026 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2026 · Apt 1

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2026 · Apt 1

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from west at north

    Jan 25, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Jan 25, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at south wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Jan 25, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Jan 25, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st closet from west at north wall door frame in the 4th room from east located at apt 1, 1st story, 1st apartment from west at north

    Jan 25, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Jan 25, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at north, the bathroom , the 1st room from east located at apt 1, 1st story, 1st apartment from west at north

    Jan 25, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east located at apt 1, 1st story, 1st apartment from west at north

    Jan 25, 2026 · Apt 1

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Jan 21, 2026 · Apt 1

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Dec 29, 2025 · Apt BASEME

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, south wall, east wall, west wall, ceiling, 1st door frame from north at east wall in the kitchen located at apt baseme, 1st story, 1st apartment from south at west

    Dec 29, 2025 · Apt BASEME

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the 1st room from north, the bathroom , the private hallway , the 4th room from north located at apt baseme, 1st story, 1st apartment from south at west

    Dec 29, 2025 · Apt BASEME

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the kitchen located at apt baseme, 1st story, 1st apartment from south at west

    Dec 29, 2025 · Apt BASEME

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt baseme, 1st story, 1st apartment from south at west

    Dec 29, 2025 · Apt BASEME

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Dec 10, 2025 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective ...electrical outlet at west wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Dec 10, 2025 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective ...electrical outlet at east wall in the 3rd room from east at north located at bsmt-apt 1, 1st bsmt-apt from west at north

    Dec 6, 2025 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective ...electrical outlet at west wall in the kitchen located at bsmt-apt 1, 1st bsmt-apt from west at north

    Dec 6, 2025 · Apt 1

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeds the maximum of 130 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Nov 14, 2025 · Apt 1

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from east located at apt 1, 1st story, 1st apartment from west at north

    Apr 27, 2025 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 3rd room from east at south located at apt 1, 1st story, 1st apartment from west at north

    Apr 27, 2025 · Apt 1

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the kitchen located at apt 1, 1st apartment from west at north

    Mar 9, 2025 · Apt 1

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st apartment from west at north

    Mar 9, 2025 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at east wall, west wall in the 1st room from east located at apt 1, 1st story, 1st apartment from west at north

    Mar 9, 2025 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east located at apt 1, 1st story, 1st apartment from west at north

    Mar 9, 2025 · Apt 1

    Open — Defect letter issued
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at rats in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Mar 9, 2025 · Apt 1

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Mar 8, 2025 · Apt 1

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at evidence of rats in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Mar 8, 2025 · Apt 1

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective glass pane at door in the entrance located at apt 1, 1st story, 1st apartment from west at north

    Nov 30, 2024 · Apt 1

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Nov 30, 2024 · Apt 1

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Nov 30, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wall cabinet at east in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Nov 30, 2024 · Apt 1

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Nov 30, 2024 · Apt 1

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective baseboard at east wall in the private hallway located at apt 1, 1st story, 1st apartment from west at north

    Mar 28, 2024 · Apt 1

    Closed — Violation dismissed
  • A

    Refit closet door in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north

    Mar 28, 2024 · Apt 1

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective formica counter top at sink in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Mar 28, 2024 · Apt 1

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tile at floor in the private hallway located at apt 1, 1st story, 1st apartment from west at north

    Mar 28, 2024 · Apt 1

    Closed — Violation dismissed
  • A

    Replace with new the missing baseboard a t south wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Mar 28, 2024 · Apt 1

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Mar 28, 2024 · Apt 1

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 4

  • Class - 3

    Failure to maintain.observed on ground floor aparment several holes in the wall in living room and bedroom.remedy:repair and/or replace

    Nov 16, 2022

    Resolve
  • Class - 1

    Electrical work w/o permit.observed in rear side apt electrical wiring devices installed to provide power for recepticales & lights w/o permit on file at dept of buildings.new kitchen,new bathroom & 2 additiona

    Nov 15, 2022 · Penalty $1,600

    Active
  • Class - 1

    Unsafe unsuitable electrical wiring/equipment in use.observed throughout side rear apt on 1st floor exposed wiringin hanging light fixtures open electrical boxes extension cords being permanently used defectgiv

    Nov 15, 2022 · Penalty $1,600

    Active
  • Class - 2

    Failure to provide fire stopping where required.observed multiple holes in walls floor & ceilings compromising fire rating in dwelling.all holes must be properly sealeed at side rear apt on 1st floor.remedy:com

    Nov 15, 2022 · Penalty $1,250

    Active

Complaints

  • Water leak

    Slow leak

    May 25, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    May 25, 2026 · Apt 1

    Close
  • Electric

    Lighting

    May 25, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Feb 23, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2026 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt 1

    Close
  • Water leak

    Slow leak

    Jan 27, 2026 · Apt 1

    Close
  • Water leak

    Heavy flow

    Jan 24, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2026 · Apt 1

    Close
  • Plumbing

    Steam pipe/riser

    Jan 24, 2026 · Apt 1

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jan 19, 2026 · Apt 1

    Close
  • Unsanitary condition

    Sewage

    Dec 17, 2025 · Apt BASEME

    Close
  • Water leak

    Slow leak

    Dec 17, 2025 · Apt BASEME

    Close
  • Water leak

    Slow leak

    Dec 8, 2025 · Apt 1BASEM

    Close
  • Flooring/stairs

    Floor

    Dec 8, 2025 · Apt 1BASEM

    Close
  • Unsanitary condition

    Mold

    Dec 8, 2025 · Apt 1BASEM

    Close
  • Electric

    Outlet/switch

    Dec 8, 2025 · Apt 1BASEM

    Close
  • Electric

    Power outage

    Dec 8, 2025 · Apt 1BASEM

    Close
  • Plumbing

    Toilet

    Dec 8, 2025 · Apt 1BASEM

    Close
  • Electric

    Power outage

    Dec 5, 2025 · Apt 1

    Close
  • Electric

    Outlet/switch

    Dec 5, 2025 · Apt 1

    Close
  • Water leak

    Slow leak

    Dec 5, 2025 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Dec 5, 2025 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 11, 2025 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Oct 24, 2025 · Apt BASEME

    Close
  • Appliance

    Refrigerator

    Oct 24, 2025 · Apt BASEME

    Close
  • Heat/hot water

    Apartment only

    Apr 27, 2025 · Apt BASEME

    Close
  • Paint/plaster

    Door/frame

    Apr 23, 2025 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2025 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Mar 7, 2025 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2024 · Apt 1

    Close
  • Water leak

    Heavy flow

    Dec 26, 2024 · Apt 1

    Close
  • Plumbing

    Water supply

    Dec 26, 2024 · Apt 1

    Close
  • Paint/plaster

    Wall

    Dec 4, 2024 · Apt BASEME

    Close
  • Unsanitary condition

    Mold

    Dec 4, 2024 · Apt BASEME

    Close
  • Unsanitary condition

    Pests

    Dec 4, 2024 · Apt BASEME

    Close
  • Plumbing

    Toilet

    Dec 4, 2024 · Apt BASEME

    Close
  • Unsanitary condition

    Pests

    Nov 26, 2024 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 15, 2024 · Apt 1

    Close
  • Outside building

    Porch/balcony

    Oct 18, 2024 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Oct 18, 2024 · Apt 1

    Close
  • Paint/plaster

    Wall

    Oct 18, 2024 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Oct 18, 2024 · Apt 1

    Close
  • Water leak

    Damp spot

    Oct 18, 2024 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Sep 30, 2024 · Apt 1

    Close
  • Plumbing

    Toilet

    Sep 30, 2024 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Sep 29, 2024 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Sep 29, 2024 · Apt 1

    Close
  • Plumbing

    Toilet

    Sep 29, 2024 · Apt 1

    Close
  • Water leak

    Slow leak

    Aug 16, 2024 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B3)
Year built
1935
Floors
2
Residential units
2
Building area
1,880 ft²
Lot area
2,500 ft²
Zoning
R5
Community board
211
Council district
13
Block / lot
4445 / 58
Assessed value
$55,920
Landmark / historic district
No

HPD registration #714900, last renewed Oct 27, 2025.

Questions about 2539 Radcliff Avenue

Who owns 2539 Radcliff Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Chigbu, Lois E.

Does 2539 Radcliff Avenue have violations?

Yes. NYC HPD has recorded 79 housing violations at this property.

Is 2539 Radcliff Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2539 Radcliff Avenue built?

City records list 1935 as the year it was built.

How many apartments are in 2539 Radcliff Avenue?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.