2539 Radcliff Avenue
Bronx, NY 10469BBL 2-04445-0058Map
Owner of record: Chigbu, Lois E
2539 Radcliff Avenue is a two-family home built in 1935 in Bronx, 10469. It has 2 residential units across 2 floors. The owner of record is Chigbu, Lois E. HPD has recorded 79 housing violations here, most recently on May 30, 2026. 33 of the 50 most recent violations are still open.
- HPD violations
- 79
- DOB violations
- 0
- ECB violations
- 4
- HPD complaints
- 119
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 79
- BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st apartment from west at north
May 30, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixtures at ceiling in the bathroom located at apt 1, 1st apartment from west at north
May 30, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Apr 11, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 4th room from east, the 3rd room from east, the bathroom located at apt 1, 1st story, 1st apartment from west at north
Mar 3, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective closet doors at north wall in the 4th room from east located at apt 1, 1st story, 1st apartment from west at north
Mar 3, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of hot water exceeds maximum allowable temperature of 130 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at the 1st door from east at south in the entrance located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2026 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2026 · Apt 1
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from west at north
Jan 25, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Jan 25, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Jan 25, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Jan 25, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st closet from west at north wall door frame in the 4th room from east located at apt 1, 1st story, 1st apartment from west at north
Jan 25, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Jan 25, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at north, the bathroom , the 1st room from east located at apt 1, 1st story, 1st apartment from west at north
Jan 25, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east located at apt 1, 1st story, 1st apartment from west at north
Jan 25, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jan 21, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Dec 29, 2025 · Apt BASEME
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall, east wall, west wall, ceiling, 1st door frame from north at east wall in the kitchen located at apt baseme, 1st story, 1st apartment from south at west
Dec 29, 2025 · Apt BASEME
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the 1st room from north, the bathroom , the private hallway , the 4th room from north located at apt baseme, 1st story, 1st apartment from south at west
Dec 29, 2025 · Apt BASEME
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the kitchen located at apt baseme, 1st story, 1st apartment from south at west
Dec 29, 2025 · Apt BASEME
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt baseme, 1st story, 1st apartment from south at west
Dec 29, 2025 · Apt BASEME
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Dec 10, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ...electrical outlet at west wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Dec 10, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ...electrical outlet at east wall in the 3rd room from east at north located at bsmt-apt 1, 1st bsmt-apt from west at north
Dec 6, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ...electrical outlet at west wall in the kitchen located at bsmt-apt 1, 1st bsmt-apt from west at north
Dec 6, 2025 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum of 130 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Nov 14, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from east located at apt 1, 1st story, 1st apartment from west at north
Apr 27, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 3rd room from east at south located at apt 1, 1st story, 1st apartment from west at north
Apr 27, 2025 · Apt 1
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the kitchen located at apt 1, 1st apartment from west at north
Mar 9, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st apartment from west at north
Mar 9, 2025 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, west wall in the 1st room from east located at apt 1, 1st story, 1st apartment from west at north
Mar 9, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east located at apt 1, 1st story, 1st apartment from west at north
Mar 9, 2025 · Apt 1
Open — Defect letter issued - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at rats in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Mar 9, 2025 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Mar 8, 2025 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at evidence of rats in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Mar 8, 2025 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at door in the entrance located at apt 1, 1st story, 1st apartment from west at north
Nov 30, 2024 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Nov 30, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Nov 30, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wall cabinet at east in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Nov 30, 2024 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Nov 30, 2024 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective baseboard at east wall in the private hallway located at apt 1, 1st story, 1st apartment from west at north
Mar 28, 2024 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Refit closet door in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north
Mar 28, 2024 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective formica counter top at sink in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Mar 28, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at floor in the private hallway located at apt 1, 1st story, 1st apartment from west at north
Mar 28, 2024 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing baseboard a t south wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Mar 28, 2024 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Mar 28, 2024 · Apt 1
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 4
- Class - 3
Failure to maintain.observed on ground floor aparment several holes in the wall in living room and bedroom.remedy:repair and/or replace
Nov 16, 2022
Resolve - Class - 1
Electrical work w/o permit.observed in rear side apt electrical wiring devices installed to provide power for recepticales & lights w/o permit on file at dept of buildings.new kitchen,new bathroom & 2 additiona
Nov 15, 2022 · Penalty $1,600
Active - Class - 1
Unsafe unsuitable electrical wiring/equipment in use.observed throughout side rear apt on 1st floor exposed wiringin hanging light fixtures open electrical boxes extension cords being permanently used defectgiv
Nov 15, 2022 · Penalty $1,600
Active - Class - 2
Failure to provide fire stopping where required.observed multiple holes in walls floor & ceilings compromising fire rating in dwelling.all holes must be properly sealeed at side rear apt on 1st floor.remedy:com
Nov 15, 2022 · Penalty $1,250
Active
Complaints
- Water leak
Slow leak
May 25, 2026 · Apt 1
Close - Unsanitary condition
Pests
May 25, 2026 · Apt 1
Close - Electric
Lighting
May 25, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Feb 23, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Feb 2, 2026 · Apt 1
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt 1
Close - Water leak
Slow leak
Jan 27, 2026 · Apt 1
Close - Water leak
Heavy flow
Jan 24, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 1
Close - Plumbing
Steam pipe/riser
Jan 24, 2026 · Apt 1
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 19, 2026 · Apt 1
Close - Unsanitary condition
Sewage
Dec 17, 2025 · Apt BASEME
Close - Water leak
Slow leak
Dec 17, 2025 · Apt BASEME
Close - Water leak
Slow leak
Dec 8, 2025 · Apt 1BASEM
Close - Flooring/stairs
Floor
Dec 8, 2025 · Apt 1BASEM
Close - Unsanitary condition
Mold
Dec 8, 2025 · Apt 1BASEM
Close - Electric
Outlet/switch
Dec 8, 2025 · Apt 1BASEM
Close - Electric
Power outage
Dec 8, 2025 · Apt 1BASEM
Close - Plumbing
Toilet
Dec 8, 2025 · Apt 1BASEM
Close - Electric
Power outage
Dec 5, 2025 · Apt 1
Close - Electric
Outlet/switch
Dec 5, 2025 · Apt 1
Close - Water leak
Slow leak
Dec 5, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Oct 24, 2025 · Apt BASEME
Close - Appliance
Refrigerator
Oct 24, 2025 · Apt BASEME
Close - Heat/hot water
Apartment only
Apr 27, 2025 · Apt BASEME
Close - Paint/plaster
Door/frame
Apr 23, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Mar 7, 2025 · Apt 1
Close - Unsanitary condition
Pests
Mar 7, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Dec 26, 2024 · Apt 1
Close - Water leak
Heavy flow
Dec 26, 2024 · Apt 1
Close - Plumbing
Water supply
Dec 26, 2024 · Apt 1
Close - Paint/plaster
Wall
Dec 4, 2024 · Apt BASEME
Close - Unsanitary condition
Mold
Dec 4, 2024 · Apt BASEME
Close - Unsanitary condition
Pests
Dec 4, 2024 · Apt BASEME
Close - Plumbing
Toilet
Dec 4, 2024 · Apt BASEME
Close - Unsanitary condition
Pests
Nov 26, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Nov 15, 2024 · Apt 1
Close - Outside building
Porch/balcony
Oct 18, 2024 · Apt 2
Close - Flooring/stairs
Floor
Oct 18, 2024 · Apt 1
Close - Paint/plaster
Wall
Oct 18, 2024 · Apt 1
Close - Plumbing
Basin/sink
Oct 18, 2024 · Apt 1
Close - Water leak
Damp spot
Oct 18, 2024 · Apt 1
Close - Plumbing
Basin/sink
Sep 30, 2024 · Apt 1
Close - Plumbing
Toilet
Sep 30, 2024 · Apt 1
Close - Flooring/stairs
Floor
Sep 29, 2024 · Apt 1
Close - Plumbing
Basin/sink
Sep 29, 2024 · Apt 1
Close - Plumbing
Toilet
Sep 29, 2024 · Apt 1
Close - Water leak
Slow leak
Aug 16, 2024 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1935
- Floors
- 2
- Residential units
- 2
- Building area
- 1,880 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5
- Community board
- 211
- Council district
- 13
- Block / lot
- 4445 / 58
- Assessed value
- $55,920
- Landmark / historic district
- No
HPD registration #714900, last renewed Oct 27, 2025.
Questions about 2539 Radcliff Avenue
Who owns 2539 Radcliff Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Chigbu, Lois E.
Does 2539 Radcliff Avenue have violations?
Yes. NYC HPD has recorded 79 housing violations at this property.
Is 2539 Radcliff Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2539 Radcliff Avenue built?
City records list 1935 as the year it was built.
How many apartments are in 2539 Radcliff Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.