2517 Cruger Avenue
Bronx, NY 10467BBL 2-04433-0057Map
Owner of record: Ashmeade, Andrew
2517 Cruger Avenue is a two-family home built in 1910 in Bronx, 10467. It has 2 residential units across 2 floors. The owner of record is Ashmeade, Andrew. HPD has recorded 264 housing violations here, most recently on January 22, 2025. 50 of the 50 most recent violations are still open.
- HPD violations
- 264
- DOB violations
- 3
- ECB violations
- 10
- HPD complaints
- 164
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 264
- CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 3rd room from east at north located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 22, 2025 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the private hallway located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 22, 2025 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective ,broken upper window glass pane, 1st window from south at west wall in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from south at west
Jan 19, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and west wall in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from south at west
Jan 19, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from south at west
Jan 19, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... ,greater than 30 sqft. at west wall in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from south at west
Jan 19, 2025 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of rodents kitchen(rats) in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 19, 2025 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 19, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 19, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 19, 2025 · Apt 1
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 19, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Nov 27, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Nov 27, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway , the 1st room from east, the 5th room from east at south, the 5th room from east at north located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and the west wall ceiling, west wall in the 2nd room from east located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east wall in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from west at north wall in the 2nd room from east located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at the west wall in the 5th room from east at north located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at the range in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 23, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 21, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of rodents rats in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 21, 2024 · Apt 1STFLO
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective rotted/ splinting wood sink base cabinet in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 21, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 21, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq.ft at west wall west wall in the 5th room from east at north located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 21, 2024 · Apt 1STFLO
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of rodents rats in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 21, 2024 · Apt 1STFLO
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 21, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 21, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 21, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective cracked ceramic tiles at countertop at sink base cabinet in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 21, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective cracked ceramic tiles at floor in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 21, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story
Aug 27, 2024 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story
Aug 27, 2024 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story
Aug 27, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the bathroom , the foyer , the 2nd room from east, the 5th room from east at north, the 5th room from east at south located at apt 1, 1st story, 1st apartment from north at east
Aug 15, 2024 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling in the 5th room from east at north located at apt 1, 1st story, 1st apartment from north at east
Aug 15, 2024 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall in the foyer located at apt 1, 1st story, 1st apartment from north at east
Aug 15, 2024 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east wall in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Aug 15, 2024 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, south wall, west wall, east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from north at east
Aug 15, 2024 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 13, 2024
Open — Info nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west
Aug 9, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls at 2nd story public hall
Aug 9, 2024
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls at 2nd story public hall
Aug 9, 2024
Open — Nov sent out - BHazardous
Provide wired mesh under skylight at 2nd story public hall
Aug 9, 2024
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the consisting of garbage at 1st story extension roof, building rear
Aug 9, 2024
Open — Nov sent out
DOB building violations · 3
- Immediate emergency anythingoptional
Seal the side cellar entrance door plywood, cement, and stucco
Apr 9, 2025
Dob violation - active - Construction other optional
Work without permit; noted at cellar level installed various full height partitions and doors to create bathroom, and 2 additional rooms, with additional electrical lines for light, switches and outlets. installed water and waste lines for residential sink, 3-piece bathroom, and washer machine. installed gas lines for stove and dryer.
Jul 9, 2024
Dob violation - active - Construction other optional
Occupancy contrary; noted official building department records lno #916 indicates building as 2 family 2 story. occupancy contrary noted at cellar level set -up and arranged as a class a apartment with kitchen with residential sink, gas stove, 3-piece bathroom, and 2 additional rooms. vacate entire cellar.
Jul 9, 2024
Dob violation - active
ECB violations · 10
- Class - 3
Failure to maintain building in code complaint manner; noted at exposure 3 rear yard sections of wood fence not secure and falling, held up by wood cabinet. also piles of branches, old lumber, and plastic bucke
Mar 19, 2026 · Penalty $500
Active - Class - 2
Work without permit; noted at rear of building erected wood shed approximately 12' wide x 12' deep x 12' high with 1 entrance door and 1 window., obtain all permits
Apr 9, 2025 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code complaint manner; noted at side cellar entrance door open and unlockable leaving cellar open to the elements and the public. at cellar level apartment at kitchen ceiling, br
Apr 9, 2025 · Penalty $12,500
Active - Class - 2
Failure to maintain. exposure#3, observed excessive debris being stored. observed rear yard structure with cracks and chips on cement surface., repair and/or replace; repair/replace
Feb 3, 2025 · Penalty $3,125
Active - Class - 2
Failure to file a certificate of correction for violation#35667936k, file a certificate of correction; file a certificate of correction
Feb 3, 2025 · Penalty $3,125
Resolve - Class - 1
: failure to maintain building in code complaint manner; noted at cellar level apartment at kitchen ceiling broken water pipe causing flooding and mold throughout cellar, and missing sheet rock on ceiling due t
Feb 3, 2025 · Penalty $6,250
Active - Class - 1
N: occupancy contrary; noted official building department records lno #916 indicates building as 2 family 2 story. occupancy contrary noted at cellar level set -up and arranged as a class "a" apartment with kit
Feb 3, 2025 · Penalty $12,500
Active - Class - 1
: work without permit; noted at cellar level installed various full height partitions and doors to create bathroom, and 2 additional rooms, with additional electrical lines for light, switches and outlets. inst
Feb 3, 2025 · Penalty $12,500
Active - Class - 1
Failure to maintain building in code-compliant manner. at exposure 3 defective masonry parting at various locations. at exposure 4 2nd floordefective lintel, brickwork and mortar joints. remedy: repair and/r re
Aug 10, 2024 · Penalty $6,250
Active - Class - 2
Occupancy contrary to that allowed by c/o and/or department of building records.illegal converted cellar into class a apartment with bathroom and kitchen unit in vacant at time of inspection.rem:discontinue the
Feb 22, 2024 · Penalty $6,250
Active
Complaints
- Unsanitary condition
Garbage/recycling storage
Jan 29, 2025 · Apt BACKYA
Close - Heat/hot water
Apartment only
Jan 17, 2025 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Nov 22, 2024 · Apt 1
Close - General
Cooking gas
Nov 5, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Nov 5, 2024 · Apt 1
Close - Electric
Power outage
Nov 5, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Oct 18, 2024 · Apt 1STFLO
Close - Appliance
Refrigerator
Aug 8, 2024 · Apt APT2
Close - Unsanitary condition
Pests
Aug 8, 2024 · Apt APT2
Close - Unsanitary condition
Mold
Aug 8, 2024 · Apt APT2
Close
Show 40 more ↓
- Appliance
Electric/gas range
Aug 8, 2024 · Apt APT2
Close - Unsanitary condition
Pests
Aug 8, 2024 · Apt APT2
Close - Plumbing
Basin/sink
Aug 8, 2024 · Apt APT2
Close - Flooring/stairs
Floor
Aug 8, 2024 · Apt APT2
Close - Plumbing
Bathtub/shower
Aug 8, 2024 · Apt APT2
Close - Plumbing
Toilet
Aug 8, 2024 · Apt APT2
Close - Appliance
Electric/gas range
Jul 9, 2024 · Apt 1
Close - Plumbing
Toilet
Jul 9, 2024 · Apt 1
Close - Unsanitary condition
Mold
Jul 9, 2024 · Apt 1
Close - Door/window
Door
Jul 9, 2024 · Apt 1
Close - Flooring/stairs
Floor
Jul 9, 2024 · Apt 1
Close - Plumbing
Basin/sink
Jul 9, 2024 · Apt 1
Close - Appliance
Refrigerator
Jul 9, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Jul 9, 2024 · Apt 1
Close - General
Cooking gas
Apr 6, 2024 · Apt 1
Close - Heat/hot water
Entire building
Apr 6, 2024 · Apt 1
Close - Flooring/stairs
Floor
Feb 21, 2024 · Apt 1
Close - Plumbing
Toilet
Feb 21, 2024 · Apt 1
Close - Plumbing
Basin/sink
Feb 21, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Feb 21, 2024 · Apt 1
Close - Appliance
Refrigerator
Jul 7, 2023 · Apt 1
Close - Electric
Outlet/switch
Jul 7, 2023 · Apt 1
Close - Water leak
Heavy flow
Aug 23, 2021 · Apt 2
Close - Flooring/stairs
Floor
Jun 16, 2021 · Apt 2
Close - Water leak
Slow leak
Jun 16, 2021 · Apt 2
Close - Heat/hot water
Apartment only
Jan 18, 2020 · Apt 2
Close - General
Cabinet
Apr 25, 2018 · Apt 2
Close - Unsanitary condition
Pests
Apr 25, 2018 · Apt 2
Close - Door/window
Window frame
Apr 25, 2018 · Apt 2
Close - Plumbing
Bathtub/shower
Apr 25, 2018 · Apt 2
Close - Paint/plaster
Ceiling
Apr 25, 2018 · Apt 2
Close - Heat/hot water
Apartment only
Mar 20, 2018 · Apt 2
Close - Unsanitary condition
Pests
Mar 1, 2018 · Apt 2
Close - Plumbing
Toilet
Mar 1, 2018 · Apt 2
Close - Plumbing
Bathtub/shower
Mar 1, 2018 · Apt 2
Close - Paint/plaster
Ceiling
Mar 1, 2018 · Apt 2
Close - Paint/plaster
Ceiling
Mar 1, 2018 · Apt 2
Close - Paint/plaster
Ceiling
Jul 28, 2016 · Apt 1
Close - Plumbing
Radiator
Jul 28, 2016 · Apt 1
Close - Door/window
Window frame
Jul 28, 2016 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1910
- Floors
- 2
- Residential units
- 2
- Building area
- 1,932 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 211
- Council district
- 13
- Block / lot
- 4433 / 57
- Assessed value
- $43,020
- Landmark / historic district
- No
Questions about 2517 Cruger Avenue
Who owns 2517 Cruger Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Ashmeade, Andrew.
Does 2517 Cruger Avenue have violations?
Yes. NYC HPD has recorded 264 housing violations at this property.
Is 2517 Cruger Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2517 Cruger Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 2517 Cruger Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.