2440 Boston Road
Bronx, NY 10467BBL 2-04431-0001Map
Owner of record: NYC Housing Authority
2440 Boston Road is an elevator apartment building built in 1972 in Bronx, 10467. It has 241 residential units across 20 floors. The owner of record is NYC Housing Authority. HPD has recorded 107 housing violations here, most recently on July 6, 2026.
- HPD violations
- 107
- DOB violations
- 18
- ECB violations
- 23
- HPD complaints
- 129
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 107
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroom located at apt 9e, 9th story
Jul 6, 2026 · Apt 9E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 9e, 9th story
Jul 6, 2026 · Apt 9E
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 18f, 18th story, 2nd apartment from south at west , section at south
Nov 15, 2025 · Apt 18F
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 15, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at 1st fire door from north at east at (stairwell ''18b'') at public hall, 18th story
Nov 15, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective latch and assembly at 1st fire door from north at east at (stairwell ''18b'') at public hall, 18th story
Nov 15, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Oct 14, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Oct 14, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at basement at public hall
Oct 3, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at vestibule
Oct 3, 2025
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling at vestibule
Oct 3, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling at vestibule
Oct 3, 2025
Closed — Violation dismissed - BHazardous
Provide heavy duty key locking device and assembly at vestibule to basement public hall
Oct 3, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch and assemblys at staircase a at public hall stairs, 14th story
Oct 3, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of a electromagnetic locking device installed at vestibule to basement public hall
Oct 3, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at staircase a at public hall stairs, 14th story
Oct 3, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling at basement at public hall
Oct 3, 2025
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at washbasin and bathtub in the bathroom located at apt 16e, 16th story, 2nd apartment from south at west
Oct 1, 2025 · Apt 16E
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 16e, 16th story, 2nd apartment from south at west
Oct 1, 2025 · Apt 16E
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 16e, 16th story, 2nd apartment from south at west
Oct 1, 2025 · Apt 16E
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures no volume to the fixtures at washbasin, and bathtub in the bathroom located at apt 16e, 16th story, 2nd apartment from south at west
Oct 1, 2025 · Apt 16E
Closed — Violation dismissed - BHazardous
Provide in the event of power outrage by means of an acceptable mechanical heavy duty lock and assembly at vestibule door at public hall
Sep 28, 2025
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of a dual motion electromagnetic device installed at vestibule door at public hall
Sep 28, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall
Sep 28, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall
Sep 28, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall
Sep 28, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing drop down kickstand installed at door in the entrance located at apt 17d, 17th story, 1st apartment from south at west , section ''south''
Sep 27, 2025 · Apt 17D
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 17d, 17th story, 1st apartment from south at west , section ''south''
Sep 27, 2025 · Apt 17D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 17d, 17th story, 1st apartment from south at west , section ''south''
Sep 27, 2025 · Apt 17D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling 1st story public hall , 1st story
Sep 5, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling 1st public hall , 1st story
Sep 5, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective entrance door hinges in the entrance located at apt 9e, 9th story, 2nd apartment from south at west
Sep 5, 2025 · Apt 9E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the 2nd room from north at west located at apt 9e, 9th story, 2nd apartment from south at west
Jul 29, 2025 · Apt 9E
Closed — Violation closed - BHazardous
Replace with new the missing vanity at washbasin in the bathroom located at apt 9e, 9th story, 2nd apartment from south at west
Jul 29, 2025 · Apt 9E
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 9e, 9th story, 2nd apartment from south at west
Jul 29, 2025 · Apt 9E
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at ceiling light fixture in the 1st room from north at west located at apt 9e, 9th story, 2nd apartment from south at west
Jul 29, 2025 · Apt 9E
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinge in the entrance located at apt 9e, 9th story, 2nd apartment from south at west
Jul 29, 2025 · Apt 9E
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story
Jul 23, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Jul 23, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lockset at mailbox for apt 18g at public hall, 1st story
Jun 13, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective the lockset at entrance door to bldg at public hall, 1st story
Feb 2, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 20l, 20th story, 2nd apartment from north at east
Jan 29, 2025 · Apt 20L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (hinges) at apartment door in the entrance located at apt 20l, 20th story, 2nd apartment from north at east
Jan 29, 2025 · Apt 20L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 1st story, 1st apartment from south at west
Jan 29, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1d, 1st story, 1st apartment from south at west
Jan 29, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 16, 2025
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 4h, 4th story, 1st apartment from south at west
Jan 16, 2025 · Apt 4H
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective radiator in the 1st room from north at west located at apt 4h, 4th story, 1st apartment from south at west
Jan 16, 2025 · Apt 4H
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building vestibule door , 1st story
Jan 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2h, 2nd story, 1st apartment from south at west
Jan 16, 2025 · Apt 2H
Closed — Violation dismissed
DOB building violations · 18
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Aug 21, 2022
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jul 3, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed
Show 8 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 31, 1992
Vp*-violation unserved ecb- dismissed
ECB violations · 23
- Class - 2
At time of inspection observed active suspended scaffolds. upon reviewing c-hook drawings notice work does not conform. one of the platforms at exposure 3 on drawings shows the c-hooks on different parapet wall
Jan 27, 2025 · Penalty $625
Resolve - Class - 2
At time of inspection, observed active suspended scaffolds. upon requesting manufacture specs for sky climber platform to rigging foreman he could not provided. unable to verified compliance with safe working c
Jan 27, 2025 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed 3 active suspended scaffolds at exp. 3. upon requesting certificate of fitness to all suspended scaffold users 4 uses could not provide them. as per 1rcny special rigger is respon
Jan 27, 2025 · Penalty $625
Resolve - Class - 2
At time of inspection, observed active construction site. upon reviewing site safety plan, noticed tree protection is require at the perimeter of site. none of the trees have been protected contrary to approved
Jan 27, 2025 · Penalty $1,250
Resolve - Class - 2
At time of inspection, observed active construction activities. at ground floor observed a large opening on wall with shoring. upon inquiry with cp he confirm they made opening. upon requesting design drawings
Jan 27, 2025 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed active construction site. upon requesting require training to all workers mastan singh provided an expired sst card. a safety orientation was provided for this worker. this means
Jan 27, 2025 · Penalty $2,500
Resolve - Class - 2
No rating plates on blrs-lugz missing-pump leak-guards missing at water glasses-no drip on backflow-makeup tank overflow-no pres. ctl. cover-glass assembly corro/leak-lwc drain clogged-welded fitting corro/leak
Jul 26, 2021 · Penalty $625
Active - Class - 2
B254 ftm as per 27-2033 ý access to boiler room¨ must post a visible sign in vestibule of building to be seen from outer door, as to where key for boiler room can be found , as well as supers location phone # a
Apr 16, 2021 · Penalty $625
Resolve - Class - 1
59b10. brake monitor switch not working with controller repairso the switch can be read or show the fault in the controller proper parameter.
Dec 30, 2015
Resolve - Class - 1
42g11,42x10,42l10,59x10. 42g11-replace jumped fuses on controller;42x 10-repair inoperative overload relay on controller; 42l10-repair defective regulator box on controller; 59x10-repair brake monitoring switch
Dec 29, 2015
Resolve
Show 13 more ↓
- Class - 1
Failure to maintain bldg exteriors at north elvn - (i) fallen trimmingstones (conc) were found at 14/f & 16/f & ii spalled patchings were found @ soffit of concrete slab at 16/f.remedy: repair defects including
Jan 25, 2011
Resolve - Class - 2
29q03,39x10,60q03,69m07,71x10,77x10,81m07. 39x10-repair light on top of car. 77x10-repair light under car.
Oct 8, 2009
Resolve - Class - 2
Altered bldg occupied w/o a valid c of o. c of o #200704372t004 expired 9.11.08. remedy: obtain a valid c of o or discontinue illegal occupancy.
Jan 21, 2009
Resolve - Hazardous
Using hoisting equipment in an unsafe manner.men working outside of motor stirrups @ edge of platform.5 x 16 wire rope not set up as per plan.(fist clamps).license rigger #5821.
Sep 19, 2007 · Penalty $4,000
Resolve - Hazardous
Operation of hoisting equipment in an unsafe manner. remedy:refer to swo # 17134.
May 22, 2007 · Penalty $5,000
Resolve - Hazardous
Licensed rigger failed to ensure scaffold workers met minimum requirements. (no cert of fitness) remedy: refer to swo # 17134
May 22, 2007 · Penalty $2,500
Resolve - Non-hazardous
Altered building occupied without a valid certificate of occupancy #2pl000610t1 c of o#2pl000610t1 exp feb 1, 2001 remedy:obtain a valid c of o
Dec 21, 2001 · Penalty $2,500
Resolve - Hazardous
Altered building occupied without valid c of o alt # 370/88 2pl00610 t1 note temp certififcate of occupancy exp 02-01-01 remedy otain vali c of o
Aug 20, 2001
Resolve - Non-hazardous
Altered buildinng number 370/88 is occupied without a valid certificate of occupancy. t.c.o. 2p1000610 expired 2/1/01
Aug 15, 2001
Resolve - Non-hazardous
Altered building occupied without a valid certificate of occupancy:cofo#073282 expired 01/19/00.remedy:obtain a valid cofo.
Sep 21, 2000 · Penalty $2,500
Resolve - Non-hazardous
Altrered building occupied without a valid c of o alt 370-88 1st floor offices. remedy: discontnue illegal use or obtain a new c of o.
Apr 11, 1994
Resolve - Hazardous
Use of swinging scaffold with sterrups placed approx.4' to 6' from andof flatform. move stirrups in accordance to dob code. stop work order#3766.
Nov 23, 1993 · Penalty $500
Resolve - Non-hazardous
Work without permit work noted: removed kitchen at apts ib and ic on 1st floor changed to management office space. remedy: obtain permit.
Feb 8, 1989
Resolve
Complaints
- Flooring/stairs
Floor
Sep 29, 2026 · Apt 17H
Close - Flooring/stairs
Floor
Sep 29, 2026 · Apt 17H
Close - Door/window
Door
Sep 29, 2026 · Apt 17H
Close - Unsanitary condition
Pests
Sep 29, 2026 · Apt 17H
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 8G
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 8G
Close - Heat/hot water
Entire building
Nov 13, 2025 · Apt 18F
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 8G
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt 5G
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2025 · Apt 8G
Close - Electric
Power outage
Oct 2, 2025 · Apt 14B
Close - Plumbing
Water supply
Sep 30, 2025 · Apt 18C
Close - Heat/hot water
Entire building
Sep 30, 2025 · Apt 16E
Close - Electric
Lighting
Aug 18, 2025 · Apt 17D
Close - General
Cabinet
Aug 18, 2025 · Apt 17D
Close - Paint/plaster
Wall
Aug 18, 2025 · Apt 17D
Close - Electric
Wiring
Aug 18, 2025 · Apt 17D
Close - Plumbing
Water supply
Aug 2, 2025 · Apt 7M
Close - Unsanitary condition
Garbage/recycling storage
Jul 21, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jul 21, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Jun 24, 2025 · Apt 9E
Close - Door/window
Door
May 14, 2025 · Apt 14F
Close - General
Mailbox
May 3, 2025 · Apt 18G
Close - Plumbing
Water supply
Apr 10, 2025 · Apt 18D
Close - Heat/hot water
Entire building
Feb 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 8, 2025 · Apt 6G
Close - Heat/hot water
Apartment only
Jan 30, 2025 · Apt 6G
Close - Heat/hot water
Entire building
Jan 28, 2025 · Apt 18G
Close - Heat/hot water
Apartment only
Jan 27, 2025 · Apt 15D
Close - Heat/hot water
Entire building
Jan 27, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 25, 2025 · Apt 15L
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 18G
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Jan 21, 2025 · Apt 15L
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 17, 2025 · Apt 15L
Close - Heat/hot water
Entire building
Jan 16, 2025 · Apt 20L
Close - Heat/hot water
Entire building
Jan 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 14, 2025 · Apt 15L
Close - Heat/hot water
Entire building
Jan 11, 2025 · Apt BUILDI
Close - Heat/hot water
Apartment only
Jan 10, 2025 · Apt 15L
Close - Heat/hot water
Apartment only
Jan 10, 2025 · Apt 18G
Close - Plumbing
Basin/sink
Jan 10, 2025 · Apt 4H
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1972
- Floors
- 20
- Residential units
- 241
- Building area
- 195,780 ft²
- Lot area
- 84,550 ft²
- Zoning
- R6
- Community board
- 211
- Council district
- 13
- Block / lot
- 4431 / 1
- Assessed value
- $5,041,800
- Landmark / historic district
- No
HPD registration #229057, last renewed Jul 16, 2026.
Questions about 2440 Boston Road
Who owns 2440 Boston Road?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 2440 Boston Road have violations?
Yes. NYC HPD has recorded 107 housing violations at this property.
Is 2440 Boston Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2440 Boston Road built?
City records list 1972 as the year it was built.
How many apartments are in 2440 Boston Road?
It has 241 residential units and 242 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.