2135 Colonial Avenue
Bronx, NY 10461BBL 2-04251-0030Map
Owner of record: Pelham Residences LLC
2135 Colonial Avenue is an elevator apartment building built in 2024 in Bronx, 10461. It has 59 residential units across 9 floors. The owner of record is Pelham Residences LLC. HPD has recorded 16 housing violations here, most recently on June 24, 2026. 1 of the 16 most recent violations are still open.
- HPD violations
- 16
- DOB violations
- 3
- ECB violations
- 15
- HPD complaints
- 24
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- CImmediately hazardous
Remove the illegal fastening consisting of unacceptable electromagnetic locking device at building entrance door , 1st story
Jun 24, 2026
Closed — Violation dismissed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock set at building entrance door , 1st story
Jun 24, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective exhaust vent at ceiling in the bathroom located at apt apt4f, 4th story, 1st apartment from south at west
Jun 19, 2026 · Apt APT4F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective exhaust vent at ceiling in the kitchen located at apt apt4f, 4th story, 1st apartment from south at west
Jun 19, 2026 · Apt APT4F
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of lockable slide bolt at door that is impeding egress in the entrance located at apt apt4f, 4th story, 1st apartment from south at west
Jun 19, 2026 · Apt APT4F
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of a two action electronic magnetic locking device at door [ street to public hall] , 1st story
Jun 19, 2026
Closed — Violation dismissed - BHazardous
Provide security in the event of a power outage by means of heavy duty lock and latch set installed at building entrance , 1st story
Oct 24, 2025
Closed — Violation dismissed - BHazardous
Properly secure the loose upper cabinet at east wall in the kitchen located at apt 5f, 5th story, 1st apartment from south at west
Oct 24, 2025 · Apt 5F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective air vent at ceiling in the bathroom located at apt 5f, 5th story, 1st apartment from south at west
Oct 24, 2025 · Apt 5F
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of two motion electromagnetic locking device installed at building entrance door , 1st story
Oct 24, 2025
Closed — Violation dismissed
Show 6 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 16, 2022
Closed — Violation closed - ANon-hazardous
Repair the broken or defective rain leader at southeast corner of building
Sep 12, 2021
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 21, 2021
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 8, 2019
Closed — Violation closed
DOB building violations · 3
- Plumbing none
The borough commissioner intends to revoke all plumbing approvals and permit under job #220409948 , due to revocation of license master plumber #9646 , stop all plumbing work under above mentioned permit immediately.
Dec 28, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed
ECB violations · 15
- Class - 2
Kitchen and bathroom exhaust are not operating. fail to maintain the exhaust system as per mc-502.1, repair and/or replace; correct all violating conditions and submit a certificate of correction.
Jul 9, 2026
Resolve - Class - 1
Observed in cellar,chopping of concrete and making trenches for plumbing to be installed later. work is approx 25% complete. no permit on file for scope of work., obtain permit; stop all work in cellar make sit
Jun 11, 2026 · Penalty $2,500
Resolve - Class - 1
Atoi, wwop: it was observed that work was conducted on the staircase leading from the cellar to the first floor on the left side of the building at colonial avenue without the proper permits. the staircase appe
May 27, 2026 · Penalty $2,500
Resolve - Class - 1
During the inspection, it was observed that electrical work was exposed and not properly capped off, indicating a violation related to failure to maintain proper electrical safety practices for the scope of wor
May 27, 2026 · Penalty $2,500
Resolve - Class - 2
Observed workers installing top rail locking components for temper glass at balconies exp4,no pedestrian protection in place no safety monitoring at sidewalk,top rail for temper glass missing various locations
Sep 16, 2024 · Penalty $2,400
Resolve - Class - 1
3303.8.1(4)at a active 9 story building i noticed at roof level and at various floors stand pipe gauges reading less then 15psi .upon reviewing approved plans pressure should be between 15 -25 psi for stand pip
Jul 16, 2024
Resolve - Class - 1
At a active jobsite 9 story building.i noticed a stand pipe alarm system at the 1st floor level.upon reviewing department of building records i found no electrical permit for alarm system, a licensed electricia
Jul 16, 2024
Resolve - Class - 2
At roof observed accumulation of styrofoam pellets and no safety measures in place for containment of pellets,accumulation of pellets observed within vicinity of jobsite public street and neighboring properties
Jul 12, 2024 · Penalty $5,000
Resolve - Class - 2
At roof exp3 and 4 observed unenclosed perimeter with vertical nets not maintained unto cable wire system as per bc3308.5 and bc3308.5.2 creates hazard for workers,pedestrians and adj.properties of strike from
Jul 12, 2024 · Penalty $2,500
Resolve - Class - 2
Observed exp1 fire hydrant with hose connection and no use of backflow diverter to prevent water contamination, upon request from gc for permit use of fire hydrant failed to provide. title 15 chapter 20 rules o
Jul 12, 2024
Resolve
Show 5 more ↓
- Class - 2
Bc 3307.6.4.2.2 storage. observed construction material such as 6 foot supported scaffold frames, osha planks and foam stored on top of sidewalk shed(sws) deck. when reviewing approved dob sws drawings, it was
May 23, 2024 · Penalty $2,500
Resolve - Class - 2
Bc 3314.1 scope. observed supported scaffold @exposure 3 and 4 inadequately maintained. debris netting hanging off frames, as well as tears and holes @ multiple location/exposures on the nettings, and construct
May 23, 2024 · Penalty $2,500
Resolve - Class - 2
Work not conform to approve plans @ exposure #1 different installation gc install on the round pile adding horizontal steal support for the waller, don't show on drawing detailsconform to approval plans or ame
Dec 11, 2023
Resolve - Class - 1
Work w/o permit. at time of inspection in cellar,i observed new 3 direct vent (meter) heaters & gas furnace w/new gas piping observed on attic 2 new gas furnaces w/new gas piping. all work was done under job #
Jun 13, 2018 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. at time of inspection in cellar,i observed 3 hot water heaters connected to together using gas flex connector-prohibited material. remedy: comply w/code.
Jun 13, 2018 · Penalty $625
Resolve
Complaints
- Electric
Outlet/switch
Aug 5, 2026 · Apt 7F
Close - Unsanitary condition
Mold
Jun 17, 2026 · Apt APT4F
Close - General
Cabinet
Jun 17, 2026 · Apt APT4F
Close - Unsanitary condition
Mold
Jun 16, 2026 · Apt 4F
Close - Door/window
Window frame
Jun 15, 2026 · Apt 4F
Close - Water leak
Slow leak
Dec 19, 2025 · Apt 8B
Close - Water leak
Heavy flow
Dec 19, 2025 · Apt 8B
Close - Paint/plaster
Ceiling
Dec 19, 2025 · Apt 8B
Close - Paint/plaster
Wall
Dec 19, 2025 · Apt 8B
Close - Paint/plaster
Ceiling
Dec 19, 2025 · Apt 8B
Close
Show 14 more ↓
- Water leak
Damp spot
Dec 19, 2025 · Apt 8B
Close - Unsanitary condition
Mold
Dec 17, 2025 · Apt 8C
Close - Water leak
Heavy flow
Dec 8, 2025 · Apt 8B
Close - Paint/plaster
Wall
Dec 8, 2025 · Apt 8B
Close - Unsanitary condition
Mold
Dec 8, 2025 · Apt 8B
Close - Water leak
Slow leak
Dec 8, 2025 · Apt 8B
Close - Paint/plaster
Wall
Dec 8, 2025 · Apt 8B
Close - Paint/plaster
Ceiling
Dec 8, 2025 · Apt 8B
Close - Water leak
Damp spot
Dec 8, 2025 · Apt 8B
Close - General
Cabinet
Oct 24, 2025 · Apt 5F
Close - Heat/hot water
Apartment only
Oct 24, 2025 · Apt 5F
Close - General
Ventilation system
Oct 24, 2025 · Apt 5F
Close - Electric
Power outage
Oct 24, 2025 · Apt 5F
Close - Unsanitary condition
Sewage
Sep 10, 2021 · Apt BSMT
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2024
- Floors
- 9
- Residential units
- 59
- Building area
- 47,701 ft²
- Lot area
- 4,900 ft²
- Zoning
- R7-1
- Community board
- 210
- Council district
- 13
- Block / lot
- 4251 / 30
- Assessed value
- $3,460,050
- Landmark / historic district
- No
HPD registration #229215, last renewed Sep 17, 2025.
Questions about 2135 Colonial Avenue
Who owns 2135 Colonial Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Pelham Residences LLC.
Does 2135 Colonial Avenue have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 2135 Colonial Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2135 Colonial Avenue built?
City records list 2024 as the year it was built.
How many apartments are in 2135 Colonial Avenue?
It has 59 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.