2431 Fuller Street
Bronx, NY 10461BBL 2-03997-0065Map
Owner of record: Nizam, Mohammed
2431 Fuller Street is a walk-up apartment building built in 1928 in Bronx, 10461. It has 4 residential units across 2 floors. The owner of record is Nizam, Mohammed. HPD has recorded 41 housing violations here, most recently on April 30, 2026. 27 of the 41 most recent violations are still open.
- HPD violations
- 41
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 16
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the private hallway located at apt 2r, 2nd story, 1st apartment from south at west
Apr 1, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Apr 1, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 24, 2024
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Mar 24, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at building entrance door , 1st story
Mar 24, 2024
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Mar 24, 2024 · Apt 2R
Open — Nov sent out
Show 31 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Mar 24, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 2r, 2nd story, 1st apartment from east at south
Mar 24, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 1st door frame from south at west wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 21, 2024 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 21, 2024 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 21, 2024 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 21, 2024 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, 1st story
Mar 21, 2024
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 2nd room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 21, 2024 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the foyer located at apt 1f, 1st story, 1st apartment from east at south
Mar 21, 2024 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Mar 21, 2024 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd closet from west at north wall door frame in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 21, 2024 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Mar 21, 2024 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1f, 1st story, 1st apartment from east at south
Mar 21, 2024 · Apt 1F
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing
Mar 14, 2024
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 14, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Mar 14, 2024 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Mar 14, 2024 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the public part of the building and on each floor of such building, where an owner must make a repair that may result in an interruption of essential services such as utilities(heat, hot water, gas, electricity, or elevator) that is expected to continue for more than two hours. sample notice available at www.nyc.gov/hpd or as provided in this notice of violation. ...
Mar 14, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 17, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 2, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 28, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 11, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 28, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 4, 2015
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Nov 9, 2011 · Apt 2R
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Nov 9, 2011 · Apt 2R
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Hazardous
Occupancy contrary to that allowed by c of o or bldg dept records. cellar converted from ordinary use into an illegal class a apt w/ partitions erected creating 3 rms, kitchen & full bath.
Jun 9, 1998 · Penalty $800
Resolve
Complaints
- Heat/hot water
Apartment only
Nov 24, 2024 · Apt 2R
Close - General
Cooking gas
Mar 21, 2024 · Apt 2R
Close - Heat/hot water
Entire building
Mar 21, 2024 · Apt 2R
Close - General
Cooking gas
Mar 11, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Mar 11, 2024 · Apt 2F
Close - Heat/hot water
Entire building
Mar 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2024 · Apt 1FL
Close - Heat/hot water
Apartment only
Nov 12, 2023 · Apt 12F
Close - Heat/hot water
Apartment only
Nov 9, 2023 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 8, 2018 · Apt 2F
Close
Show 6 more ↓
- Nonconst
Vermin
Nov 3, 2011 · Apt 2R
Close - Paint/plaster
Wall
Nov 3, 2011 · Apt 2R
Close - Paint/plaster
Wall
Nov 3, 2011 · Apt 2R
Close - Paint/plaster
Wall
Nov 3, 2011 · Apt 2R
Close - Paint/plaster
Wall
Nov 3, 2011 · Apt 2R
Close - General
Cooking gas
Nov 4, 2003 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1928
- Floors
- 2
- Residential units
- 4
- Building area
- 3,296 ft²
- Lot area
- 2,250 ft²
- Zoning
- R6
- Community board
- 210
- Council district
- 18
- Block / lot
- 3997 / 65
- Assessed value
- $433,800
- Landmark / historic district
- No
HPD registration #219977, last renewed Jul 30, 2024.
Questions about 2431 Fuller Street
Who owns 2431 Fuller Street?
The owner of record in NYC Department of City Planning PLUTO data is Nizam, Mohammed.
Does 2431 Fuller Street have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 2431 Fuller Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2431 Fuller Street built?
City records list 1928 as the year it was built.
How many apartments are in 2431 Fuller Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.