2430 Fuller Street
Bronx, NY 10461BBL 2-03996-0017Map
Owner of record: Martinez, Antonio
2430 Fuller Street is a walk-up apartment building built in 1926 in Bronx, 10461. It has 4 residential units across 2 floors. The owner of record is Martinez, Antonio. HPD has recorded 90 housing violations here, most recently on September 23, 2026. 49 of the 50 most recent violations are still open.
- HPD violations
- 90
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 65
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 90
- BHazardous
Properly repair or replace the broken or defective lower shelf at base cabinet in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Sep 23, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Sep 23, 2026 · Apt 1B
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective deadlock at door in the entrance located at apt 1b, 1st story, 1st apartment from south at west
Sep 23, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Sep 23, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Aug 3, 2026 · Apt 1A
Open — Invalid certification - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Aug 3, 2026 · Apt 1A
Open — Nov certified late - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Aug 3, 2026 · Apt 1A
Open — Nov certified late - ANon-hazardous
Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at east wall, south wall, west wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Aug 3, 2026 · Apt 1A
Open — Civ14 mailed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain finish in bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Aug 3, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the private hallway located at apt 1a, 1st story, 1st apartment from east at south
Aug 3, 2026 · Apt 1A
Open — Invalid certification
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Aug 3, 2026 · Apt 1A
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Aug 3, 2026 · Apt 1A
Open — Nov certified late - ANon-hazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Aug 3, 2026 · Apt 1A
Open — Civ14 mailed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
May 20, 2026
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at 1st closet north wall from south at west in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of nails protruding at 1st closet door frame ( jamb) from south at west in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Replace with new the missing metal escutcheon plate at ceiling at heat riser at east wall in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenette located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mold at the edge lining of bathtub at west wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east wall and south wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov certified late - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov certified late - ANon-hazardous
Paint metal in accordance with dept. regulation the door in the entrance located at apt 1b, 1st story, 1st apartment from north at east
May 20, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Certification postponment granted - BHazardous
Properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, 1st door from west at north wall in the foyer located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the foyer located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the 1st room from east located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from east located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 2nd closet from west at north wall door frame in the private hallway located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from east at south wall in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the 5th room from east located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective ceramic tile at floor in the private hallway located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 5th room from east located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, east wall, east wall in the 1st room from east located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, ceiling, south wall, ceiling, 2nd closet from west at north wall door in the private hallway located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from south at west wall in the 2nd room from east located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 2nd room from east located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 5th room from east located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, 1st door from west at north wall, 1st door from west at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
May 10, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Pests
Sep 15, 2026 · Apt 1B
Close - Door/window
Door
Sep 15, 2026 · Apt 1B
Close - Paint/plaster
Wall
Sep 15, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Sep 15, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Sep 15, 2026 · Apt 1B
Close - Electric
Lighting
Jul 11, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Jul 11, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Jul 11, 2026 · Apt 1A
Close - Unsanitary condition
Mold
Jul 11, 2026 · Apt 1A
Close - Flooring/stairs
Floor
Jul 11, 2026 · Apt 1A
Close
Show 40 more ↓
- Paint/plaster
Wall
Jul 11, 2026 · Apt 1A
Close - Unsanitary condition
Mold
May 11, 2026 · Apt 1R
Close - Paint/plaster
Wall
May 11, 2026 · Apt 1R
Close - Paint/plaster
Ceiling
May 11, 2026 · Apt 1R
Close - Plumbing
Bathtub/shower
May 11, 2026 · Apt 1R
Close - Unsanitary condition
Pests
May 11, 2026 · Apt 1R
Close - Unsanitary condition
Pests
May 11, 2026 · Apt 1R
Close - Plumbing
Toilet
May 11, 2026 · Apt 1R
Close - Plumbing
Toilet
May 11, 2026 · Apt 1R
Close - Unsanitary condition
Pests
May 7, 2026 · Apt 1A
Close - Paint/plaster
Wall
May 7, 2026 · Apt 1A
Close - Unsanitary condition
Mold
May 7, 2026 · Apt 1A
Close - Appliance
Refrigerator
May 7, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
May 7, 2026 · Apt 1A
Close - Plumbing
Toilet
May 7, 2026 · Apt 1A
Close - Electric
Outlet/switch
May 7, 2026 · Apt 1A
Close - Electric
Lighting
May 7, 2026 · Apt 1A
Close - Unsanitary condition
Pests
May 7, 2026 · Apt 1A
Close - Unsanitary condition
Mold
Jan 20, 2026 · Apt 1B
Close - Paint/plaster
Wall
Jan 20, 2026 · Apt 1B
Close - Door/window
Window frame
Jan 20, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Jan 20, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Jul 1, 2025 · Apt 1B
Close - Unsanitary condition
Mold
Jan 23, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Jan 23, 2025 · Apt 1B
Close - Paint/plaster
Wall
Jan 23, 2025 · Apt 1B
Close - Paint/plaster
Ceiling
Jan 23, 2025 · Apt 1B
Close - Door/window
Window frame
Jan 23, 2025 · Apt 1B
Close - Unsanitary condition
Mold
Aug 4, 2024 · Apt 1B1RR
Close - Unsanitary condition
Pests
Aug 4, 2024 · Apt 1B1RR
Close - Paint/plaster
Wall
Aug 4, 2024 · Apt 1B1RR
Close - Plumbing
Bathtub/shower
Aug 4, 2024 · Apt 1B1RR
Close - Unsanitary condition
Mold
Aug 1, 2024 · Apt 1B
Close - Plumbing
Toilet
Aug 1, 2024 · Apt 1B
Close - Unsanitary condition
Pests
Aug 1, 2024 · Apt 1B
Close - Unsanitary condition
Mold
Jul 17, 2024 · Apt 1B
Close - Plumbing
Toilet
Jul 17, 2024 · Apt 1B
Close - Unsanitary condition
Pests
Jul 17, 2024 · Apt 1B
Close - Plumbing
Bathtub/shower
Jul 17, 2024 · Apt 1B
Close - Door/window
Door
Jun 2, 2024 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1926
- Floors
- 2
- Residential units
- 4
- Building area
- 7,600 ft²
- Lot area
- 2,229 ft²
- Zoning
- R6
- Community board
- 210
- Council district
- 18
- Block / lot
- 3996 / 17
- Assessed value
- $680,400
- Landmark / historic district
- No
HPD registration #219492, last renewed Jul 1, 2025.
Questions about 2430 Fuller Street
Who owns 2430 Fuller Street?
The owner of record in NYC Department of City Planning PLUTO data is Martinez, Antonio.
Does 2430 Fuller Street have violations?
Yes. NYC HPD has recorded 90 housing violations at this property.
Is 2430 Fuller Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2430 Fuller Street built?
City records list 1926 as the year it was built.
How many apartments are in 2430 Fuller Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.