1468 St Lawrence Avenue
Bronx, NY 10460BBL 2-03916-0004Map
Owner of record: Kagan, Elchanan E
1468 St Lawrence Avenue is a two-family home built in 1920 in Bronx, 10460. It has 2 residential units across 2 floors. The owner of record is Kagan, Elchanan E. HPD has recorded 111 housing violations here, most recently on October 9, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 111
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 59
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 111
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, north wall in the 1st private hallway from east located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from west at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from east at south wall, north wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from east at south wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st door frame from west at north wall, 1st wall cabinet from east at south wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall in the 2nd room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from north at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, east wall, west wall, 2nd window frame from east at south wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in washbasin in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the 2nd room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at west wall, north wall, east wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door frame, 1st closet from west at north wall door, 1st closet from west at north wall door in the 1st private hallway from east located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, baseboard at west wall, 1st door frame from north at east wall, picture moulding at south wall, south wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the 2nd room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 2nd room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Oct 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from east, the 4th room from east, the 2nd room from east at south, the bathroom located at apt 1, 1st story, 1st apartment from north at east
Oct 8, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Oct 8, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from north at east wall, 1st riser from north at east wall, 2nd riser from north at east wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from north at east
Oct 8, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from north at east
Oct 8, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from east at south wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from north at east
Oct 8, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from east located at apt 1, 1st story, 1st apartment from north at east
Oct 8, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing located at apt 1, 1st story, 1st apartment from north at east
Oct 8, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from north at east
Oct 8, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of slide bolt with eye arranged to be lockable at door in the entrance located at apt 1, 1st story, 1st apartment from north at east
Oct 8, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from north at east
Oct 8, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper window sash glass pane in the 5th room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 5th room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, south wall in the 5th room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet ... in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2
Open — Civ14 mailed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, east wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, west wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective upper wood cabinet at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water temperature exceeding over 130 degrees at all fixtures in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Apr 5, 2026 · Apt 1STFLO
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Mold
Oct 6, 2026 · Apt 1
Close - Water leak
Damp spot
Oct 6, 2026 · Apt 1
Close - Paint/plaster
Wall
Oct 6, 2026 · Apt 1
Close - Unsanitary condition
Mold
Oct 6, 2026 · Apt 1ASPER
Close - Unsanitary condition
Mold
Sep 26, 2026 · Apt 1
Close - Paint/plaster
Wall
Sep 26, 2026 · Apt 1
Close - Water leak
Slow leak
Sep 26, 2026 · Apt 1
Close - Unsanitary condition
Mold
Sep 23, 2026 · Apt 2
Close - Flooring/stairs
Floor
Sep 23, 2026 · Apt 2
Close - Unsanitary condition
Pests
Sep 23, 2026 · Apt 2
Close
Show 40 more ↓
- Unsanitary condition
Mold
Sep 2, 2026 · Apt 2
Close - Paint/plaster
Wall
Sep 2, 2026 · Apt 2
Close - Plumbing
Basin/sink
Sep 2, 2026 · Apt 2
Close - Unsanitary condition
Pests
Sep 2, 2026 · Apt 2
Close - Heat/hot water
Entire building
Apr 3, 2026 · Apt 1STFLO
Close - Water leak
Slow leak
Mar 30, 2026 · Apt 1STFLO
Close - Unsanitary condition
Mold
Mar 30, 2026 · Apt 1STFLO
Close - Water leak
Heavy flow
Mar 30, 2026 · Apt 1STFLO
Close - Paint/plaster
Ceiling
Mar 30, 2026 · Apt 1STFLO
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Water leak
Slow leak
Nov 18, 2025 · Apt 2STORY
Close - General
Cabinet
Aug 3, 2025 · Apt 1
Close - Unsanitary condition
Sewage
Aug 3, 2025 · Apt 1
Close - Flooring/stairs
Floor
Aug 3, 2025 · Apt 1
Close - Unsanitary condition
Pests
Aug 3, 2025 · Apt 1
Close - Appliance
Electric/gas range
Aug 3, 2025 · Apt 1
Close - Unsanitary condition
Mold
Aug 3, 2025 · Apt 1
Close - Plumbing
Basin/sink
Aug 3, 2025 · Apt 1
Close - Electric
Lighting
Jun 24, 2025 · Apt 1
Close - Heat/hot water
Entire building
Apr 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 2, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 9, 2024 · Apt 2
Close - Water leak
Damp spot
Nov 26, 2024 · Apt 2
Close - Unsanitary condition
Mold
Aug 11, 2024 · Apt 1
Close - General
Bell/buzzer/intercom
Jul 25, 2024 · Apt 2
Close - Safety
Fire escape
Jul 25, 2024 · Apt 2
Close - Paint/plaster
Wall
Jul 25, 2024 · Apt 2
Close - Electric
Lighting
Jul 25, 2024 · Apt 2
Close - Electric
Outlet/switch
Jul 25, 2024 · Apt 2
Close - Unsanitary condition
Pests
Jul 25, 2024 · Apt 2
Close - Safety
Carbon monoxide detector
Jul 25, 2024 · Apt 2
Close - Appliance
Refrigerator
Jul 25, 2024 · Apt 2
Close - Safety
Fire escape
Jul 25, 2024 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Jul 25, 2024 · Apt 2
Close - General
Janitor/super
Jul 25, 2024 · Apt 2
Close - General
Bell/buzzer/intercom
Jul 10, 2024 · Apt 2
Close - Electric
Power outage
Jul 10, 2024 · Apt 2
Close - Safety
Fire escape
Jul 10, 2024 · Apt 2
Close - Unsanitary condition
Pests
Jul 10, 2024 · Apt 2
Close - Electric
Lighting
Jul 10, 2024 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 2,244 ft²
- Lot area
- 2,375 ft²
- Zoning
- R5
- Community board
- 209
- Council district
- 17
- Block / lot
- 3916 / 4
- Assessed value
- $53,280
- Landmark / historic district
- No
HPD registration #713981, last renewed Jun 23, 2026.
Questions about 1468 St Lawrence Avenue
Who owns 1468 St Lawrence Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Kagan, Elchanan E.
Does 1468 St Lawrence Avenue have violations?
Yes. NYC HPD has recorded 111 housing violations at this property.
Is 1468 St Lawrence Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1468 St Lawrence Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 1468 St Lawrence Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.