1260 Evergreen Avenue
Bronx, NY 10472BBL 2-03771-0032Map
Owner of record: Ali, Christine
1260 Evergreen Avenue is a two-family home built in 1930 in Bronx, 10472. It has 2 residential units across 2 floors. The owner of record is Ali, Christine. HPD has recorded 44 housing violations here, most recently on April 28, 2025. 34 of the 44 most recent violations are still open.
- HPD violations
- 44
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 62
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 44
- BHazardous
Make safe by properly repairing the structural defect consisting of leaning parapet wall at building front facade , 2nd story
Apr 28, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall and north wall in the 1st room from east at north located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st foyer located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east at north located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 5th room from east located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall in the 4th room from east located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east at south located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electric light fixture at ceiling in the 5th room from east located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out
Show 34 more ↓
- BHazardous
Properly repair or replace the broken or defective radiator air valve in the 1st room from east at north located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, west wall in the 1st room from east at north located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ... south wall in the 1st room from east at north located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 3rd room from east at south located at apt 1st fl, 1st story, 1st apartment from north at east
Dec 6, 2023 · Apt 1ST FL
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Nov 30, 2023 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Nov 30, 2023 · Apt 1STFLO
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair or replace the broken or defective sink basin door (missing) in the kitchen located at apt 1stflo, 1st story, 1st apartment from north at east
Nov 30, 2023 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective lower wood cabinet ( missing draw in the kitchen located at apt 1stflo, 1st story, 1st apartment from north at east
Nov 30, 2023 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at the ceiling in the 6th room from north located at apt 1stflo, 1st story, 1st apartment from north at east
Nov 30, 2023 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 6th room from north located at apt 1stflo, 1st story, 1st apartment from north at east
Nov 30, 2023 · Apt 1STFLO
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 13, 2023
Open — Info nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood paneling at walls in the entire apartment located at apt privat, 1st story, 1st apartment from north at east
Nov 12, 2023 · Apt PRIVAT
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Nov 12, 2023 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from east located at apt privat, 1st story, 1st apartment from north at east
Nov 12, 2023 · Apt PRIVAT
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective shut off valve at radiator in the 1st room from east at north located at apt privat, 1st story, 1st apartment from north at east
Nov 12, 2023 · Apt PRIVAT
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acrostic tiles at ceilings in the entire apartment located at apt privat, 1st story, 1st apartment from north at east
Nov 12, 2023 · Apt PRIVAT
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at east wall in the kitchen located at apt firstf, 1st story, 1st apartment from north at east
Apr 12, 2022 · Apt FIRSTF
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at apt firstf, 1st story, 1st apartment from north at east
Apr 12, 2022 · Apt FIRSTF
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east at north located at apt firstf, 1st story, 1st apartment from north at east
Apr 12, 2022 · Apt FIRSTF
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jun 25, 2021
Open — Info nov sent out - CImmediately hazardous
Replace with new the broken or defective glass pane at first window from north at east at front areaway, 1st story
Jun 23, 2021
Closed — Violation closed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door at builsding storm gate at front areaway, 1st story
Jun 23, 2021
Open — Nov sent out - CImmediately hazardous
Abate the nuisnace consisting of rodents (rats thru-out) in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Aug 17, 2018 · Apt 1
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Feb 3, 2016 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall above bathtub in the bathroom located at apt 1, 1st story, apartment at east
Jan 12, 2016 · Apt 1
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 1, 1st story, apartment at east
Jan 12, 2016 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective glass pane at the entrance door to the apartment in the entrance located at apt 1, 1st story, apartment at east
Jan 12, 2016 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cracked ceramic tiles on east wall in the bathroom located at apt 1fl, 1st story, apartment at west
Aug 27, 2014 · Apt 1FL
Open — Nov certified late - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 4th room from east located at apt 1fl, 1st story, apartment at west
Aug 27, 2014 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 3rd room from east located at apt 1fl, 1st story, apartment at west
Aug 27, 2014 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 1st room from east located at apt 1fl, 1st story, apartment at west
Aug 27, 2014 · Apt 1FL
Closed — Violation closed - BHazardous
Properly repair the broken or defective the counter balance of lower window sash, west wall in the 4th room from east at north located at apt 1fl, 1st story, apartment at west
Aug 27, 2014 · Apt 1FL
Open — Nov certified late - BHazardous
Replace with new the missing escutcheon plate at riser in the 2nd room from east located at apt 1fl, 1st story
Aug 27, 2014 · Apt 1FL
Open — Nov certified late - BHazardous
Properly repair the broken or defective counter balance for upper window sash at south wall in the 2nd room from east located at apt 1fl, 1st story, apartment at west
Aug 27, 2014 · Apt 1FL
Open — Nov certified late
DOB building violations · 3
- Immediate emergency anythingoptional
Erect appx 50 linear feet of tigh board fence as follows: appx. 26 lin ear feet of high board fence at expo 1 to extend approximately 12" to the curb at both expo 1 and 2 to enclose potential collapse zone and safeguard the public
Apr 29, 2025
Dob violation - active - Construction other optional
Failure to maintain bldg in a safe condition.the exp1 masonry parapet exhibited excessive outwrd lean.addtnl crck was obsrvd@the exp1/2 cornr.various crcks were observed on the parapet.ownr to immed rtain nyspe to eval the ent bldg,dtrmine the strctrl stbility&prepare/file dwgs.bldg to be rpaird undr prmt
Apr 29, 2025
Dob violation - active - Construction other optional
Emergency work order.exp1 masonry exhibited excessive outward lean this outward displacement extended the adj bldg @1258evergreen ave, signt plulling exp1 parapet wall of neighborng bldg.owner to immed retain nyspe+reg constractor to hand remove the struct compromised parapet to a safe level
Apr 29, 2025
Dob violation - active
ECB violations · 1
- Class - 1
At time of inspection observed parapet wall leaning/bulging outward approx.2 inches in danger of collapse to grade over entrance to building at exp.1 (front of building). large step crack at parapet level of ex
Apr 29, 2025 · Penalty $2,500
Resolve
Complaints
- Paint/plaster
Ceiling
Apr 25, 2025 · Apt 1
Close - Safety
Smoke detector
Apr 25, 2025 · Apt 1
Close - Safety
Carbon monoxide detector
Apr 25, 2025 · Apt 1
Close - Electric
Wiring
Sep 26, 2024 · Apt 1STFLO
Close - Unsanitary condition
Pests
Sep 26, 2024 · Apt 1STFLO
Close - Flooring/stairs
Floor
Sep 26, 2024 · Apt 1STFLO
Close - Paint/plaster
Wall
Sep 26, 2024 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Dec 7, 2023 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Nov 28, 2023 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Nov 13, 2023 · Apt 1FL
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 10, 2023 · Apt PRIVAT
Close - Paint/plaster
Ceiling
Nov 10, 2023 · Apt PRIVAT
Close - Paint/plaster
Wall
Nov 10, 2023 · Apt PRIVAT
Close - Heat/hot water
Apartment only
Nov 27, 2022 · Apt 1
Close - Plumbing
Basin/sink
Apr 27, 2022 · Apt 1FL
Close - Unsanitary condition
Mold
Apr 27, 2022 · Apt 1FL
Close - Unsanitary condition
Mold
Apr 6, 2022 · Apt FIRSTF
Close - Plumbing
Basin/sink
Apr 6, 2022 · Apt FIRSTF
Close - Unsanitary condition
Mold
Jun 5, 2021 · Apt 1
Close - Water leak
Damp spot
Jun 5, 2021 · Apt 1
Close - Heat/hot water
Entire building
Dec 19, 2019 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 12, 2018 · Apt 1
Close - Door/window
Window frame
Jan 8, 2015 · Apt GFL
Close - Door/window
Window frame
Jan 8, 2015 · Apt GFL
Close - Door/window
Door frame
Jan 8, 2015 · Apt GFL
Close - Heat/hot water
Apartment only
Jan 8, 2015 · Apt GFL
Close - Door/window
Window pane
Jul 25, 2014 · Apt 1FL
Close - Paint/plaster
Wall
Jul 25, 2014 · Apt 1FL
Close - Unsanitary condition
Pests
Jul 25, 2014 · Apt 1FL
Close - Unsanitary condition
Pests
Jul 25, 2014 · Apt 1FL
Close - Door/window
Window frame
Jul 25, 2014 · Apt 1FL
Close - Unsanitary condition
Mold
Jul 25, 2014 · Apt 1FL
Close - Heating
Heat related
Dec 30, 2010 · Apt 1FL
Close - Paint/plaster
Wall
Apr 28, 2010 · Apt BSMT
Close - Heating
Heat related
Dec 23, 2008 · Apt 1FL
Close - General
Windows
Dec 23, 2008 · Apt 1FL
Close - General
Windows
Dec 23, 2008 · Apt 1FL
Close - Heating
Heat related
Dec 23, 2008 · Apt 1FL
Close - Heating
Heat related
Jan 21, 2008 · Apt 1FL
Close - Heating
Heat related
Jan 30, 2007 · Apt 1
Close - Heating
Heat related
Nov 20, 2006 · Apt 1
Close - Heating
Heat related
Nov 20, 2006 · Apt 1
Close - Heating
Heat related
Nov 19, 2006 · Apt BLDG
Close - Heating
Heat related
Nov 2, 2006 · Apt 1
Close - Heating
Heat related
Dec 14, 2005 · Apt BLDG
Close - Heating
Heat related
Dec 21, 2004 · Apt 1
Close - General
Cabinet
May 12, 2004 · Apt 1 FL
Close - General
Cabinet
Apr 22, 2004 · Apt 1 FL
Close - Nonconst
Rubbish
Mar 23, 2004 · Apt 1 FL
Close - Nonconst
Vermin
Mar 23, 2004 · Apt 1 FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1930
- Floors
- 2
- Residential units
- 2
- Building area
- 2,604 ft²
- Lot area
- 2,467 ft²
- Zoning
- R6
- Community board
- 209
- Council district
- 17
- Block / lot
- 3771 / 32
- Assessed value
- $56,400
- Landmark / historic district
- No
Questions about 1260 Evergreen Avenue
Who owns 1260 Evergreen Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Ali, Christine.
Does 1260 Evergreen Avenue have violations?
Yes. NYC HPD has recorded 44 housing violations at this property.
Is 1260 Evergreen Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1260 Evergreen Avenue built?
City records list 1930 as the year it was built.
How many apartments are in 1260 Evergreen Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.