roofy

1261 Evergreen Avenue

Bronx, NY 10472BBL 2-03770-0007Map

Owner of record: Juan Castillo

1261 Evergreen Avenue is a two-family home built in 1930 in Bronx, 10472. It has 2 residential units across 2 floors. The owner of record is Juan Castillo. HPD has recorded 73 housing violations here, most recently on August 19, 2026. 38 of the 50 most recent violations are still open.

HPD violations
73
DOB violations
0
ECB violations
2
HPD complaints
61

What to know

Concern
14 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 19, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 73

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, west wall, 1st window frame from east at south wall in the kitchen located at apt 2, 2nd story, 2nd apartment from south at west

    Aug 19, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall in the 6th room from east at north located at apt 2, 2nd story, 2nd apartment from south at west

    Aug 19, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the bathroom located at apt 2, 2nd story, 2nd apartment from south at west

    Aug 19, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 1st window frame from east at south wall, 2nd window frame from south at west wall in the 6th room from east at south located at apt 2, 2nd story, 2nd apartment from south at west

    Aug 19, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from north at east wall in the private hallway located at apt 2, 2nd story, 2nd apartment from south at west

    Aug 19, 2026 · Apt 2

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 2nd apartment from south at west

    Aug 19, 2026 · Apt 2

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 2nd story, 2nd apartment from south at west

    Aug 19, 2026 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at south wall in the kitchen located at apt 2, 2nd story, 2nd apartment from south at west

    Aug 19, 2026 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from south at west wall, west wall in the 6th room from east at north located at apt 2, 2nd story, 2nd apartment from south at west

    Aug 19, 2026 · Apt 2

    Open — Nov sent out
  • B

    Abate the nuisance consisting of household items obstructing the scuttle ladder inside the closet at east wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from east at south

    Jun 25, 2026 · Apt 2

    Open — Nov sent out
Show 40 more ↓
  • A

    Replace with new the missing privacy lock at door in the entrance located at apt 2, 2nd story, 1st apartment from east at south

    Jun 25, 2026 · Apt 2

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Jun 25, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2, 2nd story, 1st apartment from east at south

    Jun 25, 2026 · Apt 2

    Open — Nov sent out
  • B

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jun 25, 2026 · Apt 2

    Open — Nov sent out
  • B

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 14, 2026 · Apt 2FLOOR

    Open — Nov sent out
  • C

    Abate the nuisance consisting of scuttle closet located within room in the 6th room from east at north located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 14, 2026 · Apt 2FLOOR

    Open — Nov sent out
  • A

    Replace with new the missing privacy lock at door in the entrance located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 14, 2026 · Apt 2FLOOR

    Open — Nov sent out
  • A

    Properly secure the loose ceramic tile at north wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 14, 2026 · Apt 2FLOOR

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at east wall, south wall, west wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 14, 2026 · Apt 2FLOOR

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 14, 2026 · Apt 2FLOOR

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 6th room from east at north, the 3rd room from east, the 1st room from east at south located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 14, 2026 · Apt 2FLOOR

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 14, 2026 · Apt 2FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st closet from north at east wall door frame in the 2nd private hallway from east located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 14, 2026 · Apt 2FLOOR

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective lock at door in the entrance located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door frame, 1st closet from north at east wall door frame in the 2nd private hallway from east located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the 3rd room from east located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Open — Certification postponment denied
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from north at east wall door in the 2nd private hallway from east located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Closed — Violation closed
  • A

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective porcelain finish in bathtub in the bathroom located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, west wall in the 6th room from east at north located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Closed — Violation closed
  • B

    Repair the broken or defective connection at waste line at washbasin in the bathroom located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame in the 1st private hallway from east located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from east at north located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from north at east wall, east wall in the 6th room from east at south located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st closet from north at east wall door in the 6th room from east at north located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 6th room from east at north located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Closed — Violation closed
  • C

    Properly repair and abate unsafe electric wiring condition consisting of expsed electrical wiring at junction box at west wall in the kitchen located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt second, 2nd story, 1st apartment from east at south

    Apr 9, 2026 · Apt SECOND

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jan 13, 2026 · Apt 2

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jan 13, 2026 · Apt 2

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jan 3, 2026 · Apt 2

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective caulking around window frame in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Jan 3, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from east at south

    Jan 3, 2026 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from east at south

    Jan 3, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from east at south

    Jan 3, 2026 · Apt 2

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures to range in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jan 3, 2026 · Apt 2

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 2

  • Class - 2

    Illegal use in a residential district. noted: at time of my inspectionof the aforementioned premises, i observed an autobody mechanic shop being ran out of the garage at exp1, on the bronx river avenue side of

    Apr 7, 2017 · Penalty $800

    Active
  • Non-hazardous

    Illegal use in a residential district private garage at rear entrance thru 1266 bronx river ave operating an auto repair shop in a r-6 district remedy discontinue illegal use forthwith

    Oct 4, 1990 · Penalty $460

    Resolve

Complaints

  • Paint/plaster

    Wall

    Aug 10, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Aug 10, 2026 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Aug 10, 2026 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Aug 10, 2026 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Aug 10, 2026 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Aug 10, 2026 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Jun 17, 2026 · Apt 2

    Close
  • Plumbing

    Water supply

    Jun 17, 2026 · Apt 2

    Close
  • Plumbing

    Water supply

    Jun 17, 2026 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Jun 17, 2026 · Apt 2

    Close
Show 40 more ↓
  • General

    Cooking gas

    Jun 12, 2026 · Apt 2FLOOR

    Close
  • Door/window

    Door to dumbwaiter

    Jun 12, 2026 · Apt 2FLOOR

    Close
  • Heat/hot water

    Apartment only

    Jun 12, 2026 · Apt 2FLOOR

    Close
  • Paint/plaster

    Wall

    Apr 9, 2026 · Apt SECOND

    Close
  • Heat/hot water

    Apartment only

    Apr 9, 2026 · Apt SECOND

    Close
  • Plumbing

    Basin/sink

    Apr 9, 2026 · Apt SECOND

    Close
  • Appliance

    Electric/gas range

    Apr 9, 2026 · Apt SECOND

    Close
  • Plumbing

    Bathtub/shower

    Apr 9, 2026 · Apt SECOND

    Close
  • Plumbing

    Bathtub/shower

    Apr 9, 2026 · Apt SECOND

    Close
  • Door/window

    Door

    Apr 9, 2026 · Apt SECOND

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 2

    Close
  • General

    Cooking gas

    Feb 1, 2026 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Jan 12, 2026 · Apt 2FLOOR

    Close
  • Appliance

    Electric/gas range

    Jan 12, 2026 · Apt 2FLOOR

    Close
  • Heat/hot water

    Apartment only

    Jan 9, 2026 · Apt 2

    Open
  • General

    Cooking gas

    Jan 9, 2026 · Apt 2

    Open
  • General

    Cooking gas

    Jan 6, 2026 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 6, 2026 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 2, 2026 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Jan 2, 2026 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 12, 2025 · Apt 2

    Close
  • General

    Cooking gas

    Dec 12, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 7, 2025 · Apt 2

    Close
  • General

    Cooking gas

    Dec 7, 2025 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Nov 7, 2019 · Apt 2

    Close
  • Door/window

    Window pane

    Nov 7, 2019 · Apt 2

    Close
  • General

    Cabinet

    Nov 7, 2019 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Nov 7, 2019 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Nov 7, 2019 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Nov 7, 2019 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Nov 7, 2019 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Nov 7, 2019 · Apt 2

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 7, 2019 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Jul 31, 2019 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Jul 31, 2019 · Apt 2

    Close
  • Door/window

    Window frame

    Jul 31, 2019 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Jul 31, 2019 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Nov 30, 2017 · Apt BASEMT

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B1)
Year built
1930
Floors
2
Residential units
2
Building area
3,840 ft²
Lot area
3,257 ft²
Zoning
R6
Community board
209
Council district
17
Block / lot
3770 / 7
Assessed value
$54,540
Landmark / historic district
No

HPD registration #713814, last renewed Sep 10, 2019.

Questions about 1261 Evergreen Avenue

Who owns 1261 Evergreen Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Juan Castillo.

Does 1261 Evergreen Avenue have violations?

Yes. NYC HPD has recorded 73 housing violations at this property.

Is 1261 Evergreen Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1261 Evergreen Avenue built?

City records list 1930 as the year it was built.

How many apartments are in 1261 Evergreen Avenue?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.