1261 Evergreen Avenue
Bronx, NY 10472BBL 2-03770-0007Map
Owner of record: Juan Castillo
1261 Evergreen Avenue is a two-family home built in 1930 in Bronx, 10472. It has 2 residential units across 2 floors. The owner of record is Juan Castillo. HPD has recorded 73 housing violations here, most recently on August 19, 2026. 38 of the 50 most recent violations are still open.
- HPD violations
- 73
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 61
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 73
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, west wall, 1st window frame from east at south wall in the kitchen located at apt 2, 2nd story, 2nd apartment from south at west
Aug 19, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall in the 6th room from east at north located at apt 2, 2nd story, 2nd apartment from south at west
Aug 19, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the bathroom located at apt 2, 2nd story, 2nd apartment from south at west
Aug 19, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 1st window frame from east at south wall, 2nd window frame from south at west wall in the 6th room from east at south located at apt 2, 2nd story, 2nd apartment from south at west
Aug 19, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from north at east wall in the private hallway located at apt 2, 2nd story, 2nd apartment from south at west
Aug 19, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 2nd apartment from south at west
Aug 19, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 2nd story, 2nd apartment from south at west
Aug 19, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the kitchen located at apt 2, 2nd story, 2nd apartment from south at west
Aug 19, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from south at west wall, west wall in the 6th room from east at north located at apt 2, 2nd story, 2nd apartment from south at west
Aug 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of household items obstructing the scuttle ladder inside the closet at east wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Jun 25, 2026 · Apt 2
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Replace with new the missing privacy lock at door in the entrance located at apt 2, 2nd story, 1st apartment from east at south
Jun 25, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jun 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Jun 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jun 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2floor, 2nd story, 1st apartment from east at south
Jun 14, 2026 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scuttle closet located within room in the 6th room from east at north located at apt 2floor, 2nd story, 1st apartment from east at south
Jun 14, 2026 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Replace with new the missing privacy lock at door in the entrance located at apt 2floor, 2nd story, 1st apartment from east at south
Jun 14, 2026 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Properly secure the loose ceramic tile at north wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from east at south
Jun 14, 2026 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at east wall, south wall, west wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from east at south
Jun 14, 2026 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 2floor, 2nd story, 1st apartment from east at south
Jun 14, 2026 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 6th room from east at north, the 3rd room from east, the 1st room from east at south located at apt 2floor, 2nd story, 1st apartment from east at south
Jun 14, 2026 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2floor, 2nd story, 1st apartment from east at south
Jun 14, 2026 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st closet from north at east wall door frame in the 2nd private hallway from east located at apt 2floor, 2nd story, 1st apartment from east at south
Jun 14, 2026 · Apt 2FLOOR
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lock at door in the entrance located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door frame, 1st closet from north at east wall door frame in the 2nd private hallway from east located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the 3rd room from east located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Open — Certification postponment denied - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from north at east wall door in the 2nd private hallway from east located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective porcelain finish in bathtub in the bathroom located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, west wall in the 6th room from east at north located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Closed — Violation closed - BHazardous
Repair the broken or defective connection at waste line at washbasin in the bathroom located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame in the 1st private hallway from east located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from east at north located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from north at east wall, east wall in the 6th room from east at south located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st closet from north at east wall door in the 6th room from east at north located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 6th room from east at north located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of expsed electrical wiring at junction box at west wall in the kitchen located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt second, 2nd story, 1st apartment from east at south
Apr 9, 2026 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jan 13, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jan 13, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jan 3, 2026 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective caulking around window frame in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jan 3, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Jan 3, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Jan 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Jan 3, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures to range in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jan 3, 2026 · Apt 2
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Class - 2
Illegal use in a residential district. noted: at time of my inspectionof the aforementioned premises, i observed an autobody mechanic shop being ran out of the garage at exp1, on the bronx river avenue side of
Apr 7, 2017 · Penalty $800
Active - Non-hazardous
Illegal use in a residential district private garage at rear entrance thru 1266 bronx river ave operating an auto repair shop in a r-6 district remedy discontinue illegal use forthwith
Oct 4, 1990 · Penalty $460
Resolve
Complaints
- Paint/plaster
Wall
Aug 10, 2026 · Apt 2
Close - Paint/plaster
Wall
Aug 10, 2026 · Apt 2
Close - Plumbing
Basin/sink
Aug 10, 2026 · Apt 2
Close - Plumbing
Bathtub/shower
Aug 10, 2026 · Apt 2
Close - Unsanitary condition
Mold
Aug 10, 2026 · Apt 2
Close - Appliance
Electric/gas range
Aug 10, 2026 · Apt 2
Close - Appliance
Electric/gas range
Jun 17, 2026 · Apt 2
Close - Plumbing
Water supply
Jun 17, 2026 · Apt 2
Close - Plumbing
Water supply
Jun 17, 2026 · Apt 2
Close - Flooring/stairs
Floor
Jun 17, 2026 · Apt 2
Close
Show 40 more ↓
- General
Cooking gas
Jun 12, 2026 · Apt 2FLOOR
Close - Door/window
Door to dumbwaiter
Jun 12, 2026 · Apt 2FLOOR
Close - Heat/hot water
Apartment only
Jun 12, 2026 · Apt 2FLOOR
Close - Paint/plaster
Wall
Apr 9, 2026 · Apt SECOND
Close - Heat/hot water
Apartment only
Apr 9, 2026 · Apt SECOND
Close - Plumbing
Basin/sink
Apr 9, 2026 · Apt SECOND
Close - Appliance
Electric/gas range
Apr 9, 2026 · Apt SECOND
Close - Plumbing
Bathtub/shower
Apr 9, 2026 · Apt SECOND
Close - Plumbing
Bathtub/shower
Apr 9, 2026 · Apt SECOND
Close - Door/window
Door
Apr 9, 2026 · Apt SECOND
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 2
Close - General
Cooking gas
Feb 1, 2026 · Apt 2
Close - Heat/hot water
Entire building
Jan 12, 2026 · Apt 2FLOOR
Close - Appliance
Electric/gas range
Jan 12, 2026 · Apt 2FLOOR
Close - Heat/hot water
Apartment only
Jan 9, 2026 · Apt 2
Open - General
Cooking gas
Jan 9, 2026 · Apt 2
Open - General
Cooking gas
Jan 6, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 6, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt 2
Close - Appliance
Electric/gas range
Jan 2, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Dec 12, 2025 · Apt 2
Close - General
Cooking gas
Dec 12, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Dec 7, 2025 · Apt 2
Close - General
Cooking gas
Dec 7, 2025 · Apt 2
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Flooring/stairs
Floor
Nov 7, 2019 · Apt 2
Close - Door/window
Window pane
Nov 7, 2019 · Apt 2
Close - General
Cabinet
Nov 7, 2019 · Apt 2
Close - Unsanitary condition
Pests
Nov 7, 2019 · Apt 2
Close - Plumbing
Basin/sink
Nov 7, 2019 · Apt 2
Close - Plumbing
Basin/sink
Nov 7, 2019 · Apt 2
Close - Paint/plaster
Ceiling
Nov 7, 2019 · Apt 2
Close - Unsanitary condition
Pests
Nov 7, 2019 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Nov 7, 2019 · Apt BLDG
Close - Flooring/stairs
Floor
Jul 31, 2019 · Apt 2
Close - Unsanitary condition
Mold
Jul 31, 2019 · Apt 2
Close - Door/window
Window frame
Jul 31, 2019 · Apt 2
Close - Flooring/stairs
Floor
Jul 31, 2019 · Apt 2
Close - Heat/hot water
Apartment only
Nov 30, 2017 · Apt BASEMT
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1930
- Floors
- 2
- Residential units
- 2
- Building area
- 3,840 ft²
- Lot area
- 3,257 ft²
- Zoning
- R6
- Community board
- 209
- Council district
- 17
- Block / lot
- 3770 / 7
- Assessed value
- $54,540
- Landmark / historic district
- No
HPD registration #713814, last renewed Sep 10, 2019.
Questions about 1261 Evergreen Avenue
Who owns 1261 Evergreen Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Juan Castillo.
Does 1261 Evergreen Avenue have violations?
Yes. NYC HPD has recorded 73 housing violations at this property.
Is 1261 Evergreen Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1261 Evergreen Avenue built?
City records list 1930 as the year it was built.
How many apartments are in 1261 Evergreen Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.