roofy

1039 Manor Avenue

Bronx, NY 10472BBL 2-03716-0050Map

Owner of record: 1039 Manor Ave LLC

1039 Manor Avenue is a walk-up apartment building built in 1926 in Bronx, 10472. It has 4 residential units across 2 floors. The owner of record is 1039 Manor Ave LLC. HPD has recorded 183 housing violations here, most recently on June 9, 2026.

HPD violations
183
DOB violations
0
ECB violations
1
HPD complaints
140

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 183

  • B

    Properly repair with similar material the broken or defective box newel post at public hall stairs, 2nd story

    Jun 9, 2026

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mortise lock at building entrance door at public hall, 1st story

    Jun 9, 2026

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door was locked at boiler room

    Nov 24, 2025

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Nov 24, 2025 · Apt 2A

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeds the maximum of 130 degrees in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east

    Dec 7, 2024 · Apt 2F

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective ceramic tiles around bathtub in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Aug 8, 2024 · Apt 2A

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from east located at apt 2a, 2nd story, 1st apartment from north at east

    Aug 8, 2024 · Apt 2A

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the ceramicwall tiles in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Aug 8, 2024 · Apt 2A

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; located at apt 2a, 2nd story, 1st apartment from north at east

    Aug 1, 2024 · Apt 2A

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 17, 2024

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    May 17, 2024

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of rodents at east yard at building front

    May 17, 2024

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Apr 18, 2024 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). additional needed in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Apr 18, 2024 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Apr 18, 2024 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector additional needed in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Apr 18, 2024 · Apt 2A

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Apr 18, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Apr 18, 2024

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame, 1st door frame from south at west wall, north wall, west wall, 1st window frame from north at east wall in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east at south located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from north at east wall, 1st window frame from east at south wall in the foyer located at apartment 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 2nd room from east located at apartment 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall wall, ceiling in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from east located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 2nd closet from west at north wall door frame in the foyer located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from east at south located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 1st room from east at south located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over the ceiling in the foyer located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 2nd closet from west at north wall door, 1st door frame from south at west wall in the foyer located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 2nd room from east located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door, 1st closet from south at west wall door frame, 1st door from west at north wall, west wall, 1st closet from south at west wall door frame, 1st closet from south at west wall door in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over the ceiling in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... 2 square feet at ceiling in the foyer located at apt 2a, 2nd story, 1st apartment from north at east

    Mar 26, 2024 · Apt 2A

    Closed — Violation dismissed
  • B

    Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof at public hall, 2nd story

    Mar 25, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at vestibule leading to public hall, 2nd story

    Mar 25, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch set at door at vestibule leading to public hall, 1st story

    Mar 25, 2024

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 2nd story

    Mar 25, 2024

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall at public hall, 2nd story

    Mar 25, 2024

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 1

  • Class - 1

    Occupancy in contrary to that allowed by c/o or dept of bldgs records.2 illegal class "a" apartments created at cellar,no 2nd means of egress in each.front studio apt & rear studio apt.the windows are inadequat

    Feb 10, 2021 · Penalty $2,500

    Resolve

Complaints

  • Electric

    Power outage

    Jun 6, 2026 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Nov 22, 2025 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2025 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Nov 11, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2025 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2024 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Dec 4, 2024 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Nov 29, 2024 · Apt 2F

    Close
  • Water leak

    Heavy flow

    Jul 28, 2024 · Apt 1F

    Close
  • Plumbing

    Toilet

    Apr 9, 2024 · Apt 2R

    Close
Show 40 more ↓
  • Water leak

    Heavy flow

    Apr 9, 2024 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Mar 28, 2024 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Mar 28, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Mar 23, 2024 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Mar 23, 2024 · Apt 2A

    Close
  • Door/window

    Window frame

    Mar 23, 2024 · Apt 2A

    Close
  • Water leak

    Slow leak

    Mar 23, 2024 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Dec 6, 2023 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Dec 6, 2023 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Nov 21, 2023 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Jun 26, 2023 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Jun 14, 2023 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    May 8, 2023 · Apt BLDG

    Close
  • Door/window

    Door

    Dec 5, 2022 · Apt 2R

    Close
  • Door/window

    Door

    Dec 5, 2022 · Apt 2R

    Close
  • Door/window

    Window frame

    Dec 5, 2022 · Apt 2R

    Close
  • Paint/plaster

    Radiator

    Dec 5, 2022 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Dec 5, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Dec 5, 2022 · Apt 2R

    Close
  • Door/window

    Window frame

    Dec 5, 2022 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Nov 21, 2022 · Apt 2R

    Close
  • Electric

    No lighting

    Jul 24, 2022 · Apt 2B

    Close
  • Safety

    Fire escape

    May 13, 2022 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    May 13, 2022 · Apt 2A

    Close
  • Plumbing

    Water supply

    May 13, 2022 · Apt 2A

    Close
  • Safety

    Smoke detector

    May 13, 2022 · Apt 1B

    Close
  • Safety

    Carbon monoxide detector

    May 13, 2022 · Apt 1B

    Close
  • Plumbing

    Water supply

    May 13, 2022 · Apt 1B

    Close
  • Electric

    Wiring

    May 13, 2022 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    May 13, 2022 · Apt 1A

    Close
  • Door/window

    Door

    May 13, 2022 · Apt 1A

    Close
  • Safety

    Smoke detector

    May 13, 2022 · Apt 1A

    Close
  • Safety

    Carbon monoxide detector

    May 13, 2022 · Apt 1A

    Close
  • Plumbing

    Water supply

    May 13, 2022 · Apt 1A

    Close
  • Door/window

    Door

    May 13, 2022 · Apt PBLC

    Close
  • Heat/hot water

    Apartment only

    Feb 8, 2022 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2022 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2022 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Dec 22, 2021 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Dec 22, 2021 · Apt ENTIRE

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1926
Floors
2
Residential units
4
Building area
3,321 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
209
Council district
18
Block / lot
3716 / 50
Assessed value
$366,750
Landmark / historic district
No

HPD registration #226798, last renewed Aug 14, 2025.

Questions about 1039 Manor Avenue

Who owns 1039 Manor Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1039 Manor Ave LLC.

Does 1039 Manor Avenue have violations?

Yes. NYC HPD has recorded 183 housing violations at this property.

Is 1039 Manor Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1039 Manor Avenue built?

City records list 1926 as the year it was built.

How many apartments are in 1039 Manor Avenue?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.