roofy

1551 Bruckner Boulevard

Bronx, NY 10472BBL 2-03715-0071Map

Owner of record: Valenzuela-Castillo, Maria P

1551 Bruckner Boulevard is a walk-up apartment building built in 2005 in Bronx, 10472. It has 3 residential units across 3 floors. The owner of record is Valenzuela-Castillo, Maria P. HPD has recorded 82 housing violations here, most recently on May 8, 2026. 31 of the 50 most recent violations are still open.

HPD violations
82
DOB violations
0
ECB violations
1
HPD complaints
63

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 8, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 82

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 13, 2025

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective drawer (wood) unstable at lower sink cabinet (north wall) in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Dec 27, 2024 · Apt 2

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective door frame (wood) splitting (splinter/ impaling hazard) at room entrance door in the 2nd room from north located at apt 2, 2nd story, 1st apartment from north at east

    Dec 27, 2024 · Apt 2

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Dec 27, 2024 · Apt 2

    Open — Notice of issuance sent to tenant
  • C

    M/d law abate the nuisance consisting of excessive hot water exceeding over 130f degrees at bathroom and in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Dec 27, 2024 · Apt 2

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of double cylinder lock at fire escape door leading to balcony from rm n-4 in the 4th room from north located at apt 2, 2nd story, 1st apartment from north at east

    Dec 27, 2024 · Apt 2

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective defective hinges and latch set in the entrance located at apt 2, 2nd story, 1st apartment from north at east

    Nov 2, 2024 · Apt 2

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from north located at apt 2, 2nd story, 1st apartment from north at east

    Nov 2, 2024 · Apt 2

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in water closet in the 1st bathroom from north located at apt 2, 2nd story, 1st apartment from north at east

    Nov 2, 2024 · Apt 2

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective door in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east

    Nov 2, 2024 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet cover at south wall in the 5th room from north located at apt 2, 2nd story, 1st apartment from north at east

    Nov 2, 2024 · Apt 2

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall at bulkhead at public hall, 3rd story original violation 17201396 issued 17-aug-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Aug 17, 2024

    Open — Not complied with
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall at bulkhead at public hall, 3rd story

    Aug 17, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges on door to roof at bulkhead at public hall, 3rd story

    Aug 17, 2024

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department south wall at bulkhead at public hall, 3rd story

    Aug 17, 2024

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of rodents rats at building front yard

    Aug 17, 2024

    Open — Defect letter issued
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Aug 10, 2024 · Apt 2

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at south wall in the 3rd room from north located at apt 2, 2nd story, 1st apartment from north at east

    Aug 10, 2024 · Apt 2

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the 1st room from north located at apt 2, 2nd story, 1st apartment from north at east

    Aug 10, 2024 · Apt 2

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from north at west located at apt 2, 2nd story, 1st apartment from north at east

    Aug 10, 2024 · Apt 2

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective glass at window upper sash in the 1st room from north located at apt 2, 2nd story, 1st apartment from north at east

    Aug 10, 2024 · Apt 2

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 17, 2024

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing

    Feb 3, 2024

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Jan 17, 2024 · Apt 1

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 17, 2024

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Jan 17, 2024 · Apt 1

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 30, 2023

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 19, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 19, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2019

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall 1st story and boiler room door in basement

    Mar 13, 2019

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 13, 2019

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Mar 13, 2019

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Mar 13, 2019

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Mar 13, 2019

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Mar 13, 2019

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 13, 2019

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls and closets in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east

    Mar 13, 2019 · Apt 3F

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... aprx 6 sq feet at ceiling and west wall at private hall located at apt 3f, 3rd story, 1st apartment from north at east

    Mar 13, 2019 · Apt 3F

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 3f, 3rd story, 1st apartment from north at east

    Mar 13, 2019 · Apt 3F

    Open — Nov sent out
  • B

    Arrange and make self-closing the doors .. in the entrance located at apt 3f, 3rd story, 1st apartment from north at east

    Mar 13, 2019 · Apt 3F

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water temp. exceeding 130 f at kitchen sink and washbasin in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east

    Mar 13, 2019 · Apt 3F

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... aprx 6 sq feet at ceiling and west wall at private hall located at apt 3f, 3rd story, 1st apartment from north at east original violation 12957163 issued 13-mar-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Mar 13, 2019 · Apt 3F

    Open — First no access to re- inspect violation
  • B

    Repair or replace the smoke detector defective located at apt 3f, 3rd story, 1st apartment from north at east

    Mar 13, 2019 · Apt 3F

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 26, 2018

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling west and south walls in the 1st room from north located at apt 3f, 3rd story, 1st apartment from north at east

    Jun 9, 2018 · Apt 3F

    Open — Nov sent out
  • B

    Replace with new the broken or defective wast line pipe in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east

    Jun 9, 2018 · Apt 3F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from north at east

    Jun 9, 2018 · Apt 3F

    Open — Nov sent out
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east

    Jun 9, 2018 · Apt 3F

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 1

  • Non-hazardous

    Work does not conform to approved plans. non-conforming work noted. entire buildings including heights of buildings are contrary to approvedplans job number 200975105-200975132 including buildings on boynton

    Oct 3, 2005 · Penalty $2,500

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Jan 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 23, 2024 · Apt 2

    Close
  • Water leak

    Slow leak

    Dec 16, 2024 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Dec 16, 2024 · Apt 2

    Close
  • Door/window

    Door

    Dec 16, 2024 · Apt 2

    Close
  • Water leak

    Heavy flow

    Dec 16, 2024 · Apt 2

    Close
  • General

    Cabinet

    Dec 16, 2024 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2024 · Apt 2

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Nov 1, 2024 · Apt 2

    Close
  • General

    Cabinet

    Nov 1, 2024 · Apt 2

    Close
  • Door/window

    Window frame

    Nov 1, 2024 · Apt 2

    Close
  • Door/window

    Door

    Nov 1, 2024 · Apt 2

    Close
  • Water leak

    Heavy flow

    Nov 1, 2024 · Apt 2

    Close
  • Water leak

    Heavy flow

    Oct 16, 2024 · Apt 2

    Close
  • Electric

    Lighting

    Aug 8, 2024 · Apt 2

    Close
  • Water leak

    Slow leak

    Aug 8, 2024 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Aug 8, 2024 · Apt 2

    Close
  • Safety

    Window guard broken/missing

    Aug 8, 2024 · Apt 2

    Close
  • Door/window

    Window pane

    Aug 8, 2024 · Apt 2

    Close
  • Paint/plaster

    Wall

    Aug 8, 2024 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Aug 8, 2024 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Aug 8, 2024 · Apt 2

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 8, 2024 · Apt 2

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 29, 2024 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Mar 15, 2024 · Apt 2

    Close
  • Safety

    Window guard broken/missing

    Mar 15, 2024 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Mar 15, 2024 · Apt 2

    Close
  • Door/window

    Window frame

    Mar 15, 2024 · Apt 2

    Close
  • Water leak

    Heavy flow

    Mar 15, 2024 · Apt 2

    Close
  • Safety

    Window guard broken/missing

    Mar 15, 2024 · Apt 2

    Close
  • Door/window

    Window frame

    Mar 15, 2024 · Apt 2

    Close
  • Door/window

    Door

    Feb 25, 2024 · Apt BLDG

    Close
  • Safety

    Window guard broken/missing

    Feb 25, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 25, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 20, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 7, 2021 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 7, 2019 · Apt 3F

    Close
  • Plumbing

    Water supply

    Mar 7, 2019 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2019 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2018 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    May 30, 2018 · Apt 3F

    Close
  • Plumbing

    Water supply

    May 30, 2018 · Apt 3F

    Close
  • Door/window

    Door

    May 30, 2018 · Apt 3F

    Close
  • Plumbing

    Water supply

    May 30, 2018 · Apt 3F

    Close
  • Paint/plaster

    Ceiling

    May 30, 2018 · Apt 3F

    Close
  • Unsanitary condition

    Mold

    May 30, 2018 · Apt 3F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
2005
Floors
3
Residential units
3
Building area
3,054 ft²
Lot area
1,567 ft²
Zoning
R6
Community board
209
Council district
18
Block / lot
3715 / 71
Assessed value
$55,500
Landmark / historic district
No

HPD registration #225454, last renewed Jul 29, 2025.

Questions about 1551 Bruckner Boulevard

Who owns 1551 Bruckner Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is Valenzuela-Castillo, Maria P.

Does 1551 Bruckner Boulevard have violations?

Yes. NYC HPD has recorded 82 housing violations at this property.

Is 1551 Bruckner Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1551 Bruckner Boulevard built?

City records list 2005 as the year it was built.

How many apartments are in 1551 Bruckner Boulevard?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.