3530 Wayne Avenue
Bronx, NY 10467BBL 2-03344-0052Map
Owner of record: 3530 Wayne
3530 Wayne Avenue is a hospital / health built in 1975 in Bronx, 10467. The owner of record is 3530 Wayne. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 88
- ECB violations
- 36
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 88
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed
Show 40 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 2, 2022
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Jun 1, 2021
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 8a unsafe report filed
Jun 1, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2021
Dob violation - resolved - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2019
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 27, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 27, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 22, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 22, 2016
Dob violation - resolved
ECB violations · 36
- Class - 1
Failure to maintain buildings exterior walls and/or appurtenances.-at time of inspection observed cracked brick masonry at 2 locations and abroken window on 6th floor of exposure 1(west elevation). also cracked
May 16, 2024
Resolve - Class - 2
Removal of public protection from unsafe facade without approval from the department.-at time of inspection observed sidewalk shed protection removed from site. the owner did not obtain departmment approval to
May 16, 2024
Resolve - Class - 2
Failure to file acceptable amended cycle 8a and 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #913268. agg1: prior nov 37022372z under
Jan 16, 2024 · Penalty $3,125
Resolve - Class - 1
Work contrary to site safety plan.note:at the time of inspection observed an alteration on work in progress on 7 sty building.workers working on this site.also observed they built about 15 feet height pipe scaf
Nov 9, 2021 · Penalty $1,250
Resolve - Class - 2
Inadequate construction fence.note:at the time of inspection observed an alteration work in progress on a 7 sty building.workers working on it.also they built a 15 height pipe scaffolding,about 65 long fence wi
Nov 9, 2021 · Penalty $1,000
Resolve - Class - 2
Failure to file acceptable amended cycle 8a & 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#913268. remedy: file acceptable report.
Oct 8, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to maintain/display onsite documents-documents to be kept onsite(design drawing).noted:at time of inspection of a 7 story alterationactive jobsite i observed wooden staircase installed and in use at exp
Jan 21, 2021
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments(supported scaffold)noted at time of inspection of a 7 story alteration active jobsite i observed supported scaffold in place a
Jan 21, 2021
Resolve - Class - 2
Ac28-110.1 inadequate site safety plan.noted:at time of inspection of a 7 story alteration active jobsite i observed jobsite trailer at exposure#3 in place and in use.upon further review of site safety plan pag
Jan 21, 2021
Resolve - Class - 1
Guardrails at the 2nd story enlargement an 221 street.at time of inspection of building up to 3rd fl.observed guardrails were removed and studs were installed allowing studs between studs for something to fall.
Apr 28, 2020
Resolve
Show 26 more ↓
- Class - 1
Failure to maintain/display on site documents required by chapter 33.at time of inspection of an active site workers were working on a foundation wall.next to an latter.when i asked for the ssp none was provide
Mar 20, 2020 · Penalty $625
Resolve - Class - 2
Failure to file certificate of correction for facade unit violations issued 10/30/19 35254440l/41n/42p., file a certificate of correction
Jan 18, 2020 · Penalty $1,250
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments(cd-5)at time of inspection of a 7 story bldg,with ongoing facade repair,i observed suspended scaffold in use at exp#3 & exp#4.
Jan 9, 2020 · Penalty $625
Resolve - Class - 1
Failure to protec lifelines from sharp edges and abrasion causing a hazardous condition for worker on suspended.note:at time of inspection i observed work in progress on alt 3 facade work/job.i observed lifelin
Jan 9, 2020 · Penalty $2,500
Resolve - Class - 1
Improper installation of tie back, partial stop work order for suspended scaffold and all facade work issued pursuant to 28-207.2. note: at time of inspection of an alt 3 facade job in progress i observed impro
Jan 9, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3314152-partial stop work order for suspended scaffold issued persuant to 28-207.2 all facade work(exterior work)note:at time of inspection i observed suspended scaffold in place and in use at expo#3 the stir
Jan 9, 2020 · Penalty $2,500
Resolve - Class - 2
No periodic inspection (sidewalk shed) @time of inspection for a 7 stybldg under an alt iii facade job, i observed a sidewalk shed in place @exp#1. upon request for a 6 months) periodic inspection letter from
Jan 9, 2020
Resolve - Class - 1
Pre installation inspection report. note: at time of inspection i observed suspended scaffold in place andin use upon request of pre installation report the foreman (henry campos). none was provided the results
Jan 9, 2020 · Penalty $2,500
Resolve - Class - 2
Bc 3307.6.5.10 no log book note: @time of inspection of a 7 sty alt iii facade job,i observed a sidewalk shed in place @exp#1. upon request for the daily inspection log book from the rigging foreman(henry campo
Jan 9, 2020
Resolve - Class - 2
Failure to provide approved/accepted const doc @jobsite @time of inspection @time of inspection of a 7 sty bldg, with ongoing alt iii facade work,i observed a sidewalk shed. in place @exp#1. upon request from
Jan 9, 2020
Resolve - Class - 1
Failure to maintain exterior building walls and appurtenances.as notedat time of inspection 9 observed on roof exposure water tower brick enclosure cracks and iminently hazardous step cracks,damaged mortar join
Oct 30, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to repair swamp condition in a timely manner. note: recommen ded date for completion of swamp condition was 2018-06-07 to this dateno repairs were made. conditions still exist. r.a. john schimenti
Oct 30, 2018
Resolve - Class - 1
Failure to maintain exterior building walls and appurtenances. note: exposure #1 south elevation 2. observed vertical cracks at parapet wall. vertical cracks on 1st and 2nd floors.(spandrer)exp 2 west elevati
Oct 30, 2018
Resolve - Class - 1
1rcny 103-04(6)(i)/failure to repari swarmp condition in a timely manner.as noted recommended date for completion of swarmp conditon ws 2018-06-07 as to this date no repairs were made to correct previous violat
Oct 30, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior building walls and appurtenances.as notedon expo#2 south elevation;9 observed vertical cracks on parapet wall vertical cracks on 1st and 2nd flrs spandral.expo#2 west elev.step crac
Oct 30, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #813268.submit required technical report.
May 18, 2018 · Penalty $625
Resolve - Class - 2
36)as per class 254-36 boiler not register as per dob records.
Sep 26, 2017 · Penalty $500
Resolve - Class - 2
Failure to file a final inspection for completed work within 1 year of permit expiration. under alt2 3220d10262 which expire 10.10.2013 is completed and substantially compliant to plans. applicant has not filed
Aug 7, 2017 · Penalty $800
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000001964 hasbeen inspected,tested,and disinfected,and that a maintenance plan has been developed and implemented,by november 1.2016.rem:file annual cert
Jun 20, 2017 · Penalty $2,000
Resolve - Class - 1
Failure to provide sidewalk shed where required. noted: upon inspection, observed men working on suspended scaffold at exp #1 w/o a sidewalkshed. when a structure is 40' or higher the horizontal distance from
Aug 22, 2013 · Penalty $4,800
Resolve - Class - 2
70o02 16m10 24m10. 16m10-basement & 5th flr hoistway door sight guards. 24-in car 7th flr indicator missing.
Sep 1, 2011 · Penalty $500
Resolve - Class - 2
52k10 70o02 56y10 16m10 16d06. 52-hoistway ropes are rusted w/rouge. 16m10-missing sight guard on 3rd flr. 16d06-properly secure sight guards on 4th, 6th & 7th flr hoistway doors.
Sep 1, 2011 · Penalty $500
Resolve - Non-hazardous
Fult0n y.t. boiler, 15 hp, nb 32810, gas, 1976 (50a) boiler #1 flue pipe in solid contact out with the water column piping system of boiler#2. re-position flue pipe to ensure full clearance. (50b) flue pipe sy
Nov 2, 2005
Resolve - Non-hazardous
50a/50b. fulton y.t. boiler, 15hp, nb95426, gas, 2003 replacement in 2004 for colombia vt blr 15 nb98033, 1976 (50a) no slope on boiler flue pipe elevation to breeching. (50b) no structure supports on flue pipe
Nov 2, 2005
Resolve - Non-hazardous
36/50 fulton 2003 natl 95426 50)remove and install properly all bx cable over 3'long on the boiler
Mar 9, 2004
Resolve - Non-hazardous
38/50a/18b/50b fulton 1976 natl bd 32810 50a)secure to boiler the loose flue pipe 50b)install two slow opening valves on the bottom blowdownline or one quick ball valve at the boiler follwed bt a slow opening
Mar 9, 2004
Resolve
Complaints
- Heat/hot water
Apartment only
Jun 30, 2019 · Apt 425
Close - Heat/hot water
Entire building
Mar 23, 2018 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hospital / health (I6)
- Year built
- 1975
- Floors
- 7
- Residential units
- —
- Building area
- 128,088 ft²
- Lot area
- 30,371 ft²
- Zoning
- R7-1
- Community board
- 207
- Council district
- 11
- Block / lot
- 3344 / 52
- Assessed value
- $11,678,850
- Landmark / historic district
- No
Questions about 3530 Wayne Avenue
Who owns 3530 Wayne Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 3530 Wayne.
Does 3530 Wayne Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 3530 Wayne Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3530 Wayne Avenue built?
City records list 1975 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.