Webster Avenue
Bronx, NY 10467BBL 2-03331-0053Map
Owner of record: Geel Webster Avenue Housing Development Fund Corpo
Webster Avenue is an elevator apartment building built in 2023 in Bronx, 10467. The owner of record is Geel Webster Avenue Housing Development Fund Corpo. HPD has recorded 14 housing violations here, most recently on October 21, 2026. 6 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 0
- ECB violations
- 14
- HPD complaints
- 75
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 8e, 8th story, 4th apartment from south at west
Oct 21, 2026 · Apt 8E
Open — Violation open - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor in sanitary conditions in the entire apartment located at apt 8e, 8th story, 4th apartment from south at west
Oct 21, 2026 · Apt 8E
Open — Violation open - BHazardous
Repair the roof so that it will not leak over the ceiling in the entrance located at apt 11a, 11th story, 1st apartment from south at west
Oct 1, 2026 · Apt 11A
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the entrance located at apt 11a, 11th story, 1st apartment from south at west
Oct 1, 2026 · Apt 11A
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective the mecanical ventilation system at ceiling in the bathroom located at apt 6a, 6th story, 1st apartment from south at west
Sep 9, 2026 · Apt 6A
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective the mecanical ventilation system at south wall in the kitchen located at apt 6a, 6th story, 1st apartment from south at west
Sep 9, 2026 · Apt 6A
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at staircase (b) door leading to 2nd story at public hall, 1st story
Jun 11, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures located at b-room 9a, 9th story, 1st b-room from south at west
Feb 19, 2026 · Apt 9A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 19, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 9, 2026
Closed — Violation closed
Show 4 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 11b , 11th story, 2nd apartment from south at west
Feb 9, 2026 · Apt 11B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7m, 7th story, 4th apartment from north at east
Feb 9, 2026 · Apt 7M
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9a, 9th story, 1st apartment from west at north
Feb 2, 2026 · Apt 9A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Feb 2, 2026
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 14
- Class - 2
11 story new building closed site weather advisory inspection.exp#1 observed material storage zone on street.yodok barriers with fencing collapsed on to street/bus lane causing a hazard to public/property and v
Mar 5, 2025
Resolve - Class - 1
11 story nb active site.observed worker's performing masonary work on supported scaffolds in place at exp#1 permit #00909901 in use.review of inspection logs prior to use/request for 32 hr/8 hr refresher instal
Sep 6, 2024 · Penalty $1,250
Resolve - Class - 2
11 story nb active site. observed unfinished masonary brick facade work at rear exp#3,4. also observed no/missing or inadequate roof/balcony protection of adjoining property approximately 8 feet within adjoinin
Sep 6, 2024
Resolve - Class - 2
At time of inspection observed active jobsite. supported scaffold installed exp. 1 and in use. upon inspecting supported scaffold notice it was not maintain in code complying manner. inadequate guardrail system
Jul 30, 2024 · Penalty $2,500
Resolve - Class - 2
At time of inspection, observed active supported scaffold at exp. 1 on nb project. upon reviewing approved drawings notice setup does not conform. at the base of scaffold on lower part of sws no details of this
Jul 30, 2024 · Penalty $1,250
Resolve - Class - 2
Exp1 observed inadequate working platforms and guardrails system throughout supported scaffold and accumation of debris creating an unsafe working conditions for workers leads to injuries or fatal scaffold is t
Mar 27, 2024 · Penalty $2,500
Resolve - Class - 2
An active 11 story nb i observed only partial roof protection installed. adjoining roof parapet was not protected. roof protection does not reflection the conditon on the provided ssp. roof work was not fully c
Mar 20, 2024 · Penalty $2,500
Resolve - Class - 2
28-110.2 phased site safety plans- site safety plan provided at time of inspection not phased with multiple scribbled notes @ incorrect phase of construction project. does not show current phase of operations
Jan 30, 2024 · Penalty $2,500
Resolve - Class - 2
Observed supported scaffolding installed @ all 4 exposures of jobsite approx. 106 ft in height. scaffold installed on needle beams & sidewalk shed @ exposure 2 without loads imposed letter onsite required as pe
Jan 30, 2024 · Penalty $1,250
Resolve - Class - 2
Bc3310.8.3 inspections- ssc 2926 didn't document daily inspections properly 3310.8.4 & follow steps to record & correct:standpipe not painted red, no hydrostatic test records, street occupancy w/active generato
Jan 30, 2024 · Penalty $2,500
Resolve
Show 4 more ↓
- Class - 1
Observed street occupied with generator & 30 yard container @expo 1 of jobsite. yodok barriers not fully connected with makeshift netting installed and caution tape around the equipment in street. upon review o
Jan 30, 2024 · Penalty $625
Resolve - Class - 2
Bc 3305.3.3 stay form steel installed in foundation-work does not conform observed ongoing construction operations on a jobsite in foundation phase. foundation walls at exposures 2 & 4 has stay-form steel insta
Jul 14, 2023
Resolve - Class - 2
At time of my inspection of a proposed 11 story building at excavation phase. i reviewed approved site safety plan and noticed that office trailer placed on street at exposure#1 surrounded with yodok barrier ar
Dec 7, 2022
Resolve - Class - 2
Failure to maintain fence ato my insp on demo jobsite.observed that const fence had been poorly maintained.for instance,theres unlawful marking all over fence@exp1&fence isnt secured@portion of fence.for public
Jan 20, 2022
Resolve
Complaints
- Appliance
Electric/gas range
Oct 23, 2026 · Apt 6A
Open - Appliance
Electric/gas range
Oct 23, 2026 · Apt 6A
Open - Unsanitary condition
Pests
Oct 19, 2026 · Apt 8E
Close - Flooring/stairs
Floor
Oct 19, 2026 · Apt 8E
Close - Unsanitary condition
Sewage
Oct 19, 2026 · Apt 8E
Close - Water leak
Heavy flow
Oct 15, 2026 · Apt 11A
Close - Water leak
Heavy flow
Oct 12, 2026 · Apt 11A
Close - Water leak
Heavy flow
Sep 28, 2026 · Apt 11A
Close - Appliance
Electric/gas range
Sep 28, 2026 · Apt 6A
Close - Heat/hot water
Apartment only
Jun 10, 2026 · Apt 11A
Close
Show 40 more ↓
- General
Ventilation system
Jun 8, 2026 · Apt 6A
Close - Water leak
Heavy flow
Jun 7, 2026 · Apt 11A
Close - General
Ventilation system
Jun 7, 2026 · Apt 11A
Close - Water leak
Heavy flow
Mar 23, 2026 · Apt 11A
Close - Water leak
Slow leak
Mar 22, 2026 · Apt 6J
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 23, 2026 · Apt 9A
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt 9A
Close - Heat/hot water
Apartment only
Feb 23, 2026 · Apt 8G
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt 9A
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2026 · Apt 9A
Close - Heat/hot water
Apartment only
Feb 11, 2026 · Apt 11G
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 11A
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 9A
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 10E
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 7, 2026 · Apt 6A
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt 9A
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt 8J
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt 11A
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 10F
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 9A
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 4L
Close - Appliance
Electric/gas range
Jan 12, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Jan 12, 2026 · Apt 2E
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt 4L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2023
- Floors
- 11
- Residential units
- —
- Building area
- 69,151 ft²
- Lot area
- 11,875 ft²
- Zoning
- R7D
- Community board
- 207
- Council district
- 11
- Block / lot
- 3331 / 53
- Assessed value
- $5,781,150
- Landmark / historic district
- No
HPD registration #229392, last renewed Nov 17, 2025.
Questions about Webster Avenue
Who owns Webster Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Geel Webster Avenue Housing Development Fund Corpo.
Does Webster Avenue have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is Webster Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was Webster Avenue built?
City records list 2023 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.