3424 Kossuth Avenue
Bronx, NY 10467BBL 2-03327-0200Map
Owner of record: NYC Health And Hospitals Corporation
3424 Kossuth Avenue is a hospital / health built in 1972 in Bronx, 10467. The owner of record is NYC Health And Hospitals Corporation. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 220
- ECB violations
- 33
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 220
- High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2021
Dob violation - active
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2021
Dob violation - resolved - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2019
Dob violation - resolved - Facade safety program facade required
Fisp-facade safety program facade required
Jan 29, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2018
Dob violation - resolved
ECB violations · 33
- Class - 2
Failure to file acceptable amended cycle 8b and 9b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #910569. remedy: file acceptable report.
Jan 16, 2024 · Penalty $1,250
Active - Class - 2
Failure to comply w/ the commissioner's order. note-respondent failed to comply w/ previous vio#35670787n dated 3/21/23 which requires adequate safety measures. however as of today 5/24/23 no safety measures in
May 24, 2023 · Penalty $1,250
Resolve - Class - 1
Failure to take and provide safety measures,sidewalk shed netting etc,where required to protect and secure public safety from documented unsafe facade. the technical report(tr6) received from pe/ra on 2/24/23 f
Mar 21, 2023 · Penalty $10,000
Resolve - Class - 3
Observed water leak damages to drop ceiling at thirteen floor (room#13a-08). observed opened ceiling and water damaged ceiling tile at the floor., repair and or replace
Jun 11, 2021 · Penalty $500
Resolve - Class - 2
Failure to comply with the commissioner's orders violation# 39036031k
May 28, 2021 · Penalty $1,250
Active - Class - 1
Observed hot spots near the top of 7th panel on the right side of boiler. peform and provide signed and sealed copy of a controls and safety devices test for system
Feb 4, 2021 · Penalty $1,250
Resolve - Class - 1
Fuel oil leak above fuel burner. peform and provide signed and sealed copy of a controls and safety devices test for system
Feb 4, 2021 · Penalty $1,250
Active - Class - 1
Covers missing on controls and defective gauge on burner. perform and provide signed and sealed copy of a controls and safety devices test for system
Feb 4, 2021 · Penalty $1,250
Active - Class - 1
Boiler was effected by a burner malfunction, causing the side panels to be dislodge from boiler. issued a cease use seal to boiler.
Feb 4, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to submit a required cycle 88 report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #808198. rmdy: submit required technical report.
Oct 15, 2018
Resolve
Show 23 more ↓
- Class - 2
26b11.54b67.(26)replace top emergency exit switch(59)bk maint tag insufficient.
Apr 3, 2018
Resolve - Class - 2
26b11.59b07.99b07.(26)replace piramid switch for manually reset switch(59)penmantly dated tag.
Apr 3, 2018
Resolve - Class - 2
97x10.(97x10)return to service.elevator is out of service.return device to service or file application to have device remove.
Apr 3, 2018
Resolve - Class - 2
52k11.26b11.59b07.99b07.(52-k-11)hoist ropes rusted,replace(26-b-11)top emergency exits switch insufficient replace for manually reset sw (59)bk maint tag insufficient(99)1y/rest tag insuff.
Apr 3, 2018
Resolve - Class - 1
Failure to take required measures to secure public safety from unsafe facade. as noted on 2/21/18, 3424 kossuth ave had no safety measures to protect public from a facade filed unsafe on 2/16/18 & bldg did not
Feb 21, 2018
Resolve - Class - 2
Fail to file an acceptable 6th round technical report in compliance w/code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations 36010657h.rem:fi
Jul 12, 2010
Resolve - Class - 2
Failure to file an architect/engineer report certifying exit/directional signs are connected to emergency power source/storage battery equipment. remedy: file architect/engineer report.
Jan 27, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations
Nov 27, 2009
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance with code provisions: periodic inspection of exterior walls and appurtenances as required by article 28.302 and the department of build
Feb 6, 2009
Resolve - Class - 2
50.bryan wt.boiler #1 safety valve discharge manifold 50 the combined safety valve discharge piping system installed on the referenced independently fired boiler #1 is directly connected to a similar piping sys
Oct 17, 2008 · Penalty $2,500
Resolve - Class - 2
50 bryan wt.boiler #5 safety valve discharge manifold 50 the combined safety valve discharge piping system installed on the referenced boiler #5 is directly connected to a similar piping system on boiler #4 the
Oct 17, 2008 · Penalty $2,500
Resolve - Class - 2
50.bryan wt.boiler #3 safety valve discharge manifold 50 the combined safety valve discharge piping system installed on the referenced indepently fired boiler #3 is directly connected to a similar piping system
Oct 17, 2008 · Penalty $2,500
Resolve - Class - 2
50.bryan wt.boiler # 4 safety valve discharge manifold 50 the combinedsafety valve discharge piping system installed on the referenced indepently fired boiler #4 is directly connected to a similar piping system
Oct 17, 2008 · Penalty $2,500
Resolve - Non-hazardous
Failure to submit a fifth round technical report:perdioc inspection of exterior walls and appurtenances as required by local law 11 of 1998 and the department of bldgs rules and regulations.remedy:file the req
Oct 22, 2003
Resolve - Non-hazardous
55x11
Aug 4, 2000
Resolve - Non-hazardous
35h4,35-repair leaks in motorroom overtramformation and patch all holes in ceiking water damage
Apr 20, 2000 · Penalty $2,500
Resolve - Non-hazardous
74i11,74d6,32d11,74##,73#7. repair secondary level floor danage 74-smoke hole 2nd level cover missing 32-repair damaged work top car 73-before put elevator back in service call d.o.b to do brake test 312-8732
Mar 30, 2000 · Penalty $2,500
Resolve - Non-hazardous
75u
Jun 15, 1999
Resolve - Non-hazardous
75u
Jun 15, 1999
Resolve - Non-hazardous
75u
Jun 15, 1999
Resolve - Non-hazardous
Failure to maintain the condition of the exterior walls, as follows: -west facade - brick buckling (35 ft wide) 3rd floor (north area). -all facades - spalling brick and spalling concrete panels. remedy:
Jul 23, 1998
Resolve - Non-hazardous
43x35x37a35#30o25m57o 38-remove pumper 72-72x repair 38-more light in motor rm 28-replace door operator cover 30-clean car top.
Apr 28, 1998
Resolve - Non-hazardous
73x57o25m30o35y 73-put car back in secure be inspected by d.o.b. 30-clean car top.
Apr 28, 1998 · Penalty $350
Resolve
Complaints
- General
Ventilation system
Apr 22, 2019 · Apt 3G04A
Close - Heat/hot water
Entire building
Feb 13, 2016 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 10, 2016 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hospital / health (I1)
- Year built
- 1972
- Floors
- 18
- Residential units
- —
- Building area
- 204,200 ft²
- Lot area
- 73,007 ft²
- Zoning
- R7-1
- Community board
- 207
- Council district
- 11
- Block / lot
- 3327 / 200
- Assessed value
- $88,122,600
- Landmark / historic district
- No
Questions about 3424 Kossuth Avenue
Who owns 3424 Kossuth Avenue?
The owner of record in NYC Department of City Planning PLUTO data is NYC Health And Hospitals Corporation.
Does 3424 Kossuth Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 3424 Kossuth Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3424 Kossuth Avenue built?
City records list 1972 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.