roofy

2874 Briggs Avenue

Bronx, NY 10458BBL 2-03296-0021Map

Owner of record: Zbk Holdings LLC

2874 Briggs Avenue is a walk-up apartment building built in 1901 in Bronx, 10458. It has 3 residential units across 3 floors. The owner of record is Zbk Holdings LLC. HPD has recorded 125 housing violations here, most recently on April 29, 2026.

HPD violations
125
DOB violations
3
ECB violations
5
HPD complaints
138

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 125

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2026 · Apt 1

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2026 · Apt 1

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2026 · Apt 1

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Apr 9, 2026

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Apr 5, 2026 · Apt 1

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Apr 5, 2026 · Apt 1

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Apr 5, 2026

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt apt1, 1st story, 1st apartment from north at east

    Mar 18, 2026 · Apt APT1

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Mar 18, 2026

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt apt1, 1st story, 1st apartment from north at east

    Mar 18, 2026 · Apt APT1

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt apt1, 1st story, 1st apartment from north at east

    Mar 18, 2026 · Apt APT1

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective door ( broken) leading to east yard in the 1st room from east at north located at apt apt1, 1st story, 1st apartment from north at east

    Mar 18, 2026 · Apt APT1

    Closed — Violation closed
  • B

    Refit door at entrance in the bathroom located at apt apt1, 1st story, 1st apartment from north at east

    Mar 18, 2026 · Apt APT1

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt apt1, 1st story, 1st apartment from north at east

    Mar 18, 2026 · Apt APT1

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt apt1, 1st story, 1st apartment from north at east

    Mar 18, 2026 · Apt APT1

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures to range in the kitchen located at apt apt1, 1st story, 1st apartment from north at east

    Mar 18, 2026 · Apt APT1

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Jan 5, 2024 · Apt 1

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Jan 5, 2024 · Apt 1

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Jan 5, 2024 · Apt 1

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1, 1st story, 1st apartment from east at south

    Jan 5, 2024 · Apt 1

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 16, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 9, 2017

    Closed — Violation dismissed
  • C

    Properly repair the broken or defective locking device at building entrance door , 1st story

    Jul 31, 2015

    Closed — Violation closed
  • B

    Replace with new the missing mortice lock at entrance door to vestibule , 1st story

    Jul 24, 2015

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Jul 24, 2015

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 15, 2015

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective unfinished wood floor at public hall, 1st story

    Jun 15, 2015

    Closed — Violation closed
  • B

    Replace with new the missing marble floor saddle at entrance from vestibule to lobby at public hall, 1st story

    Jun 15, 2015

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of illegal wire tape from ceiling light fixture to toggle switch at south wall in the private hallway located at apt 3, 3rd story, 1st apartment from north at east

    Jun 15, 2015 · Apt 3

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 3, 3rd story, 1st apartment from north at east

    Jun 15, 2015 · Apt 3

    Closed — Violation closed
  • A

    M/d law abate the nuisance consisting of commercial tiles on top of ceramic tiles in the bathroom located at apt 3, 3rd story, 1st apartment from north at east

    Jun 15, 2015 · Apt 3

    Closed — Violation closed
  • B

    Replace with new the missing marble floor saddle at entrance in the bathroom located at apt 3, 3rd story, 1st apartment from north at east

    Jun 15, 2015 · Apt 3

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant ceiling at vestibule at public hall, 1st story

    Jun 15, 2015

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the fire retardant ceiling at vestibule at public hall, 1st story

    Jun 15, 2015

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tile floor at vestibule at public hall, 1st story

    Jun 15, 2015

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entire area at cellar

    Jun 15, 2015

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 30, 2015

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    May 30, 2015

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    May 30, 2015

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 3, 2015

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector (missing) located at apt 3fl, 3rd story, apartment at east

    Aug 25, 2014 · Apt 3FL

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). (missing) located at apt 3fl, 3rd story, apartment at east

    Aug 25, 2014 · Apt 3FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective hole at ceramic tile floor under washbasin cabinet in the bathroom located at apt 3fl, 3rd story, apartment at east

    Aug 25, 2014 · Apt 3FL

    Closed — Violation closed
  • B

    Properly secure the loose sink at the north wall in the kitchen located at apt 3fl, 3rd story, apartment at east

    Aug 25, 2014 · Apt 3FL

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system .locked door to boiler at basement

    Aug 25, 2014

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3fl, 3rd story, apartment at east

    Aug 25, 2014 · Apt 3FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the walls at public hall, 3rd story

    Aug 25, 2014

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood door frame to the entrance door of the apartment in the entrance located at apt 3fl, 3rd story, apartment at east

    Aug 25, 2014 · Apt 3FL

    Closed — Violation closed

DOB building violations · 3

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 22, 2012

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Jun 4, 2012

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 1, 2012

    Dob violation - dismissed

ECB violations · 5

  • Class - 1

    Sec. 28-209.1 failure to comply w/comm's order to vacate. note: partial vacate order with # 48/2012 issued 3-15-12 for entire 2nd & 3rd fl sro's (only) is currently violated w/an sro at front 2nd fl currently

    Jun 22, 2012

    Resolve
  • Class - 1

    Sec. 28-201.1;28-202.1;203.1 it shall be unlawful to fail to comply w/an order of the commissioner or to violate any order of the commissioner or to violate any order of the commissioner issued pursuant to this

    Jun 1, 2012

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34936793z issued on 3/15/12 pursuant to 28-204.4 & 1rcny 102-01. for residence altered for occupanc

    May 30, 2012

    Resolve
  • Class - 1

    Residence altered for occupancy as a dwelling for more than the legally approved numbers of families. this is a 3 family dwelling there is aclass "a" apartment of the 1st flr. at the 2nd & 3rd flrs,each has 6 s

    Mar 15, 2012

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by certificate of occupancy or bldg dept records first story and (2nd)second converted from ordinary use into single room occupancy arrangement

    Sep 24, 2001 · Penalty $2,500

    Resolve

Complaints

  • Appliance

    Electric/gas range

    Sep 16, 2026 · Apt APT1

    Close
  • Water leak

    Slow leak

    Sep 16, 2026 · Apt APT1

    Close
  • Heat/hot water

    Entire building

    Apr 19, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Apr 9, 2026 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Apr 9, 2026 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Apr 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 5, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 3, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Apr 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 20, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Mar 17, 2026 · Apt APT1

    Close
  • Paint/plaster

    Wall

    Jul 27, 2023 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Jul 27, 2023 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Jun 7, 2022 · Apt 2FLOOR

    Close
  • Plumbing

    Bathtub/shower

    Jun 7, 2022 · Apt 2FLOOR

    Close
  • Plumbing

    Basin/sink

    Jun 7, 2022 · Apt 2FLOOR

    Close
  • Unsanitary condition

    Pests

    Jun 7, 2022 · Apt 2FLOOR

    Close
  • Safety

    Fire escape

    Jul 22, 2015 · Apt 2

    Close
  • Safety

    Window guard broken/missing

    Jul 22, 2015 · Apt 2

    Close
  • Electric

    Wiring

    May 23, 2015 · Apt 1

    Close
  • Electric

    Power outage

    Apr 23, 2015 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Aug 18, 2014 · Apt 3FL

    Close
  • Unsanitary condition

    Pests

    Aug 18, 2014 · Apt 3FL

    Close
  • Unsanitary condition

    Pests

    Aug 18, 2014 · Apt 3FL

    Close
  • Door/window

    Door frame

    Aug 18, 2014 · Apt 3FL

    Close
  • Door/window

    Door

    Aug 14, 2014 · Apt 3FL

    Close
  • Paint/plaster

    Wall

    Aug 14, 2014 · Apt 3FL

    Close
  • Plumbing

    Water supply

    Aug 14, 2014 · Apt 3FL

    Close
  • Flooring/stairs

    Floor

    Aug 14, 2014 · Apt 3FL

    Close
  • Door/window

    Door

    Aug 14, 2014 · Apt 3FL

    Close
  • Plumbing

    Bathtub/shower

    Aug 14, 2014 · Apt 3FL

    Close
  • Unsanitary condition

    Pests

    Aug 14, 2014 · Apt 3FL

    Close
  • Unsanitary condition

    Pests

    Aug 14, 2014 · Apt 3FL

    Close
  • Paint/plaster

    Wall

    Aug 14, 2014 · Apt 3FL

    Close
  • Paint/plaster

    Ceiling

    Aug 14, 2014 · Apt 3FL

    Close
  • Paint/plaster

    Wall

    Aug 14, 2014 · Apt 3FL

    Close
  • Plumbing

    Radiator

    Aug 14, 2014 · Apt 3FL

    Close
  • Plumbing

    Bathtub/shower

    Aug 11, 2014 · Apt TOPFL

    Close
  • Flooring/stairs

    Floor

    Aug 11, 2014 · Apt TOPFL

    Close
  • Paint/plaster

    Ceiling

    Aug 11, 2014 · Apt TOPFL

    Close
  • Flooring/stairs

    Floor

    Aug 11, 2014 · Apt TOPFL

    Close
  • Plumbing

    Radiator

    Aug 11, 2014 · Apt TOPFL

    Close
  • Unsanitary condition

    Pests

    Aug 11, 2014 · Apt TOPFL

    Close
  • Unsanitary condition

    Pests

    Aug 11, 2014 · Apt TOPFL

    Close
  • General

    Cabinet

    Aug 11, 2014 · Apt TOPFL

    Close
  • Door/window

    Door frame

    Aug 11, 2014 · Apt TOPFL

    Close
  • Unsanitary condition

    Mold

    Aug 11, 2014 · Apt TOPFL

    Close
  • Plumbing

    Radiator

    Aug 7, 2014 · Apt 3

    Close
  • Door/window

    Door

    Aug 7, 2014 · Apt 3

    Close
  • Plumbing

    Radiator

    Aug 7, 2014 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1901
Floors
3
Residential units
3
Building area
4,026 ft²
Lot area
3,125 ft²
Zoning
R5B
Community board
207
Council district
15
Block / lot
3296 / 21
Assessed value
$59,880
Landmark / historic district
No

HPD registration #218486, last renewed Jul 16, 2025.

Questions about 2874 Briggs Avenue

Who owns 2874 Briggs Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Zbk Holdings LLC.

Does 2874 Briggs Avenue have violations?

Yes. NYC HPD has recorded 125 housing violations at this property.

Is 2874 Briggs Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2874 Briggs Avenue built?

City records list 1901 as the year it was built.

How many apartments are in 2874 Briggs Avenue?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.