roofy

2680 Briggs Avenue

Bronx, NY 10458BBL 2-03294-0026Map

Owner of record: 2680briggs LLC

2680 Briggs Avenue is a walk-up apartment building built in 1915 in Bronx, 10458. It has 3 residential units across 3 floors. The owner of record is 2680briggs LLC. HPD has recorded 61 housing violations here, most recently on September 4, 2026. 40 of the 50 most recent violations are still open.

HPD violations
61
DOB violations
0
ECB violations
2
HPD complaints
21

What to know

Concern
26 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 61

  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 4 in the entire apartment located at apt 3, 2nd story, 1st apartment from east at south

    Sep 4, 2026 · Apt 3

    Open — Invalid certification
  • C

    Properly repair or replace the broken or defective spring balance at lower sash, 1st window from north at east wall in the private hallway located at apt 3 upper level, 2nd story, 1st apartment from east at south

    Sep 4, 2026 · Apt 3

    Open — Invalid certification
  • C

    Properly repair or replace the broken or defective / painted sprinkler head in the private hallway located at apt 3 upper level, 2nd story, 1st apartment from east at south

    Sep 4, 2026 · Apt 3

    Open — Invalid certification
  • C

    Properly repair or replace the broken or defective / painted sprinkler head in the private hallway located at apt 3 lower level, 2nd story, 1st apartment from east at south

    Sep 4, 2026 · Apt 3

    Open — Invalid certification
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the private hallway located at apt 3 lower level, 2nd story, 1st apartment from east at south

    Sep 4, 2026 · Apt 3

    Open — Invalid certification
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 22, 2024

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Sep 12, 2024

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Sep 12, 2024 · Apt 3

    Closed — Violation closed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the foyer located at apt 3, 3rd story, 1st apartment from east at south

    Sep 12, 2024 · Apt 3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the foyer located at apt 3, 3rd story, 1st apartment from east at south

    Sep 12, 2024 · Apt 3

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Sep 12, 2024 · Apt 3

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of rodents rats in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Sep 12, 2024 · Apt 3

    Open — Notice of issuance sent to tenant
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq ft at ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from east at south

    Sep 12, 2024 · Apt 3

    Open — First no access to re- inspect violation
  • C

    Trace and repair the source and abate the visible mold condition... more than 30 sq. ft. at north wall, east wall, south wall and ceiling in the 11th bathroom located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Notice of issuance sent to tenant
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Notice of issuance sent to tenant
  • C

    Provide ready access to buildings heating system paldock at door leading to cellar. at boiler room

    Aug 23, 2024

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak above the ceiling in the 21st private hallway located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, south wall, north wall, ceiling in the 11th bathroom located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the 11th bathroom located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, west wall, ceiling in the 21st private hallway located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall, 1st closet from south at west wall door frame, 1st closet from south at west wall door in the 11th room from east at south located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall door in the 12th room from east at south located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall, 1st closet from north at east wall door frame in the 22nd room from east at north located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall in the kitchen located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective ceramic tiled floor in the foyer located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 11th bathroom located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 11th room from east at south located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st wall cabinet from west at north wall in the 11th private hallway located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 1st door frame from west at north wall, 1st window frame from east at south wall in the 12th room from east at south located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 13th room from east at south located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the 13th room from east at north located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 1st window frame from south at west wall in the 22nd room from east at south located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 22nd room from east at north located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 21st private hallway located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, south wall in the 11th room from east at south located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3rdflo, 2nd story, 1st apartment from east at south

    Aug 23, 2024 · Apt 3RDFLO

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 16, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 3, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 2, 2021

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 2

  • Hazardous

    27-217 occupancy contrary to that allowed by certificate of occupancy or building department records cellar converted from ordinary use into class 'a' apartment with full bathroom, kitchen sleeding area and

    Aug 10, 1998 · Penalty $800

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by certificate of occupancy or bldgdept records cellar converted from ordinary use to ullegal class 'a' apartment with partiton walls erected creating a bathroom and two

    Apr 18, 1998 · Penalty $2,500

    Resolve

Complaints

  • Safety

    Window guard broken/missing

    Aug 25, 2026 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Aug 25, 2026 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Aug 25, 2026 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Sep 10, 2024 · Apt 3RDFL

    Close
  • Heat/hot water

    Entire building

    Aug 23, 2024 · Apt 3RDFLO

    Close
  • Unsanitary condition

    Pests

    Aug 23, 2024 · Apt 3RDFLO

    Close
  • Unsanitary condition

    Pests

    Aug 23, 2024 · Apt 3RDFLO

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2017 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Dec 28, 2016 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jan 18, 2015 · Apt 3

    Close
Show 11 more ↓
  • Water leak

    Heavy flow

    Jan 18, 2015 · Apt 3

    Close
  • Heating

    Heat related

    Dec 17, 2009 · Apt 2

    Close
  • Nonconst

    Vermin

    Sep 21, 2009 · Apt 2

    Close
  • Nonconst

    Vermin

    Sep 15, 2009 · Apt 2

    Close
  • Heating

    Heat related

    Aug 27, 2009 · Apt APT2

    Close
  • Heating

    Heat related

    Mar 13, 2009 · Apt 2

    Close
  • Heating

    Heat related

    Feb 25, 2009 · Apt 2

    Close
  • Electric

    Electric-supply

    Feb 18, 2008 · Apt 3

    Close
  • Appliance

    Sprinker cert

    Jul 26, 2004

    Close
  • Plumbing

    Water-leaks

    Jul 12, 2004 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Jul 12, 2004 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1915
Floors
3
Residential units
3
Building area
2,523 ft²
Lot area
1,792 ft²
Zoning
R5B
Community board
207
Council district
15
Block / lot
3294 / 26
Assessed value
$50,220
Landmark / historic district
No

HPD registration #211240, last renewed Aug 22, 2025.

Questions about 2680 Briggs Avenue

Who owns 2680 Briggs Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 2680briggs LLC.

Does 2680 Briggs Avenue have violations?

Yes. NYC HPD has recorded 61 housing violations at this property.

Is 2680 Briggs Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2680 Briggs Avenue built?

City records list 1915 as the year it was built.

How many apartments are in 2680 Briggs Avenue?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.