274 East 194 Street
Bronx, NY 10458BBL 2-03293-0052Map
Owner of record: 274 East 194 St HDFC #
274 East 194 Street is a walk-up apartment building built in 1912 in Bronx, 10458. It has 20 residential units across 5 floors. The owner of record is 274 East 194 St HDFC #. HPD has recorded 156 housing violations here, most recently on August 30, 2026. 42 of the 50 most recent violations are still open.
- HPD violations
- 156
- DOB violations
- 0
- ECB violations
- 4
- HPD complaints
- 242
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 156
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door leading to south yard at public hall, 1st story
Aug 30, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and its assemblies at fire door leading to south yard at public hall, 1st story
Aug 30, 2026
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at fire door leading to south yard at public hall, 1st story
Aug 30, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall at intermediate landing at public hall stairs, 2nd story
Aug 30, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at south wall intermediate landing at public hall stairs, 2nd story
Aug 30, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north, south, and west walls at 1st public hall bulkhead from north, 5th story
Jun 10, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling at 1st public hall bulkhead from north, 5th story
Jun 10, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north wall at public hall, 5th story
Jun 10, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling and north wall at public hall, 5th story
Jun 10, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective frame at fire door to south rear yard at public hall, 1st story
Jun 10, 2026
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 1st public hall bulkhead from north, 5th story
May 24, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall at 1st public hall bulkhead from north, 5th story
May 24, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent materials at ceiling and west wall at 1st public hall bulkhead from north, 5th story
May 24, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling and and weat wall at 1st public hall bulkhead from north, 5th story
May 24, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceailing and north wall at 1st public hall bulkhead from north, 5th story
May 24, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent materials at ceiling and north wall at 1st public hall bulkhead from north, 5th story
May 24, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling and north wall, at 1st public hall bulkhead from north, 5th story
May 24, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at east wall in the bathroom located at apt 51, 5th story, 1st apartment from north at east
May 24, 2026 · Apt 51
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets . in the bathroom located at apt 51, 5th story, 1st apartment from north at east
May 24, 2026 · Apt 51
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabneits in the bathroom located at apt 51, 5th story, 1st apartment from north at east
May 24, 2026 · Apt 51
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at sink in the bathroom located at apt 51, 5th story, 1st apartment from north at east
Apr 29, 2026 · Apt 51
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 5th story
Apr 29, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north wall at public hall, 5th story
Apr 29, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 5th story
Apr 29, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 32, 3rd story, 1st apartment from west at north
Apr 29, 2026 · Apt 32
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 32, 3rd story, 1st apartment from west at north
Apr 29, 2026 · Apt 32
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 32, 3rd story, 1st apartment from west at north
Apr 29, 2026 · Apt 32
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the entire apartment located at apt 32, 3rd story, 1st apartment from west at north
Apr 29, 2026 · Apt 32
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the entire apartment located at apt 32, 3rd story, 1st apartment from west at north
Apr 29, 2026 · Apt 32
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective washbasin cabinet in the bathroom located at apt 51, 5th story, 1st apartment from north at east
Apr 29, 2026 · Apt 51
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder (shoe) using appropriate nuts and bolts at east exterior wall at fire escape
Mar 1, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
Mar 1, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vertical crack (brick and motar) at west exterior wall (near parapit wall)
Mar 1, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor defective at public hall, 1st story
Jan 7, 2026
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling at bathroom
Dec 23, 2025
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling at kitchen
Dec 23, 2025
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling at 1st room from east at south
Dec 23, 2025
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling at 1st room from east at north
Dec 23, 2025
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling at bathroom
Dec 23, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 41, 4th story, 1st apartment from north at east
Dec 13, 2025 · Apt 41
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 41, 4th story, 1st apartment from north at east original violation 18503868 issued 13-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Dec 13, 2025 · Apt 41
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 41, 4th story, 1st apartment from north at east
Dec 13, 2025 · Apt 41
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 41, 4th story, 1st apartment from north at east
Dec 13, 2025 · Apt 41
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Dec 13, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 41, 4th story, 1st apartment from north at east
Dec 13, 2025 · Apt 41
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Dec 11, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked
Dec 11, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Dec 11, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 51, 5th story, 1st apartment from north at east
Dec 10, 2025 · Apt 51
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 4
- Class - 3
Access was denied by the superintendent. access to the heating system shall be readily provided to the department as per hmc 27-2033 /correct all violating condition/submit certificate of correction; 27-misc,28
Jun 13, 2025 · Penalty $500
Active - Class - 2
No cold coil relief valve exposed wiring, defective back flow preventer
May 2, 2023 · Penalty $3,125
Active - Hazardous
Failure to maitnain the front and east parapet walls a large 5/8 in thick section of sement stucco fell onto the front sidewalk and curb remaining areas are cracked & bulging and in danger of collapse pedsdtria
Jan 17, 1997 · Penalty $800
Active - Non-hazardous
Failure to maitnain the front and east exterior parapet walls and l shape and 5/8 in thick fell onto the front sidewalk curb there are additional cracks at other parapet wall locations note remove stucco from b
Jan 16, 1997
Resolve
Complaints
- Heat/hot water
Entire building
Aug 29, 2026 · Apt BLDG
Close - Water leak
Slow leak
Jul 8, 2026 · Apt 2
Close - Plumbing
Basin/sink
May 22, 2026 · Apt 51
Close - Water leak
Heavy flow
May 22, 2026 · Apt 51
Close - Plumbing
Basin/sink
Apr 25, 2026 · Apt 51
Close - Water leak
Heavy flow
Apr 25, 2026 · Apt 51
Close - Water leak
Heavy flow
Mar 14, 2026 · Apt 32
Close - Heat/hot water
Entire building
Mar 10, 2026 · Apt BLDG
Close - Plumbing
Basin/sink
Mar 9, 2026 · Apt 51
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 53
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 2
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Nov 27, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Oct 30, 2025 · Apt 51
Close - Plumbing
Water supply
Oct 14, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Oct 1, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Sep 28, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Jun 10, 2025 · Apt 51FLOO
Close - Plumbing
Boiler
Jun 10, 2025 · Apt 51FLOO
Close - Heat/hot water
Apartment only
Jun 7, 2025 · Apt 51
Close - Water leak
Slow leak
Apr 30, 2025 · Apt 2
Close - Paint/plaster
Wall
Apr 30, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Apr 23, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Apr 22, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Mar 8, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Mar 8, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Mar 6, 2025 · Apt 515FLO
Close - Heat/hot water
Apartment only
Mar 2, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Feb 22, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Feb 20, 2025 · Apt 1E
Close - Heat/hot water
Apartment only
Feb 7, 2025 · Apt 51
Close - Heat/hot water
Apartment only
Feb 2, 2025 · Apt 51
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1912
- Floors
- 5
- Residential units
- 20
- Building area
- 18,500 ft²
- Lot area
- 3,564 ft²
- Zoning
- R7B
- Community board
- 207
- Council district
- 15
- Block / lot
- 3293 / 52
- Assessed value
- $382,950
- Landmark / historic district
- No
HPD registration #205800, last renewed Sep 11, 2024.
Questions about 274 East 194 Street
Who owns 274 East 194 Street?
The owner of record in NYC Department of City Planning PLUTO data is 274 East 194 St HDFC #.
Does 274 East 194 Street have violations?
Yes. NYC HPD has recorded 156 housing violations at this property.
Is 274 East 194 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 274 East 194 Street built?
City records list 1912 as the year it was built.
How many apartments are in 274 East 194 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.