roofy

2576 Bainbridge Avenue

Bronx, NY 10458BBL 2-03286-0033Map

Owner of record: Perez Victor

2576 Bainbridge Avenue is a walk-up apartment building built in 1915 in Bronx, 10458. It has 3 residential units across 2 floors. The owner of record is Perez Victor. HPD has recorded 74 housing violations here, most recently on August 31, 2026. 40 of the 50 most recent violations are still open.

HPD violations
74
DOB violations
0
ECB violations
0
HPD complaints
122

What to know

Concern
14 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 31, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 74

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 1st private hallway from east located at bsmt-apt 1, 1st bsmt-apt from north at east

    Aug 31, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 2nd room from east at south located at bsmt-apt 1, 1st bsmt-apt from north at east

    Aug 31, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at bsmt-apt 1, 1st bsmt-apt from north at east

    Aug 31, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at bsmt-apt 1, 1st bsmt-apt from north at east

    Aug 31, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st private hallway from east located at bsmt-apt 1, 1st bsmt-apt from north at east

    Aug 31, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window sash from east at south wall, 1st closet from north at east wall door frame in the 2nd room from east at south located at bsmt-apt 1, 1st bsmt-apt from north at east

    Aug 31, 2026 · Apt 1

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at north wall in the kitchen located at bsmt-apt 1, 1st bsmt-apt from north at east

    Aug 31, 2026 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall in the kitchen located at bsmt-apt 1, 1st bsmt-apt from north at east

    Aug 31, 2026 · Apt 1

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at bsmt-apt 1, 1st bsmt-apt from north at east

    Aug 31, 2026 · Apt 1

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from north at east

    Aug 3, 2026 · Apt 3

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Aug 3, 2026 · Apt 3

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Aug 3, 2026 · Apt 3

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Aug 3, 2026 · Apt 3

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Aug 3, 2026 · Apt 3

    Open — Notice of issuance sent to tenant
  • A

    Properly repair with similar material the broken or defective wood entrance door in the 2nd room from east located at apt 3, 2nd story, 1st apartment from north at east

    Aug 3, 2026 · Apt 3

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3, 2nd story, 1st apartment from north at east

    Aug 3, 2026 · Apt 3

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at bsmt-apt 1, 1st bsmt-apt from north at east

    Mar 9, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at bsmt-apt 1, 1st bsmt-apt from north at east

    Mar 9, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at bsmt-apt 1, 1st bsmt-apt from north at east

    Mar 9, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the private hallway located at bsmt-apt 1, 1st bsmt-apt from north at east

    Mar 9, 2026 · Apt 1

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at north located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 1, 1st apartment from north at east original violation 17798091 issued 02-apr-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Apr 2, 2025 · Apt 1

    Open — Defect letter issued
  • C

    Remove the illegal fastening security gate at south yard

    Apr 2, 2025

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective uneven wood floor in the 2nd room from east at south located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective uneven wood floor in the private hallway located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective uneven wood floor in the private hallway located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective door in the entrance located at bsmt-apt 1, 1st bsmt-apt from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected from floor to ceiling with door creating additional room in the 3rd room from east located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective counter balance at lower window sash in the bathroom located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective recalk around the bathtub in the bathroom located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Closed — Violation closed
  • C

    Remove the illegal fastening double cylinder lock on storm door to rear yard in the kitchen located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective door in the kitchen located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • A

    M/d law abate the nuisance consisting of vinyl tiles at floor in the foyer located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective uneven wood floor in the foyer located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the foyer located at apt 1, 1st apartment from north at east

    Apr 2, 2025 · Apt 1

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at front at public hall

    Mar 28, 2025

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Apr 17, 2024 · Apt 2NDFLO

    Open — Notice of issuance sent to tenant
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 16, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 3, 2022

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at bsmt-apt 1basem, 1st bsmt-apt from west at north

    Oct 26, 2022 · Apt 1BASEM

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt 1basem, 1st bsmt-apt from west at north

    Oct 26, 2022 · Apt 1BASEM

    Open — Notice of issuance sent to tenant

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Paint/plaster

    Wall

    Sep 4, 2026 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Sep 4, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Sep 4, 2026 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Sep 4, 2026 · Apt 1

    Close
  • Water leak

    Heavy flow

    Sep 4, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Sep 4, 2026 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Sep 4, 2026 · Apt 1

    Close
  • Water leak

    Heavy flow

    Aug 30, 2026 · Apt 1

    Close
  • Paint/plaster

    Wall

    Aug 30, 2026 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Aug 30, 2026 · Apt 1

    Close
Show 40 more ↓
  • Paint/plaster

    Ceiling

    Aug 30, 2026 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Jul 27, 2026 · Apt 3

    Close
  • Door/window

    Door

    Jul 27, 2026 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Jul 27, 2026 · Apt 3

    Close
  • Appliance

    Electric/gas range

    Jul 10, 2026 · Apt 3

    Close
  • Water leak

    Heavy flow

    Mar 8, 2026 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Mar 8, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Mar 8, 2026 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Mar 8, 2026 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 9, 2026 · Apt 3

    Close
  • Electric

    Power outage

    May 1, 2025 · Apt ROOM3

    Close
  • Electric

    Outlet/switch

    May 1, 2025 · Apt ROOM3

    Close
  • Unsanitary condition

    Pests

    May 1, 2025 · Apt ROOM3

    Close
  • Door/window

    Window frame

    May 1, 2025 · Apt ROOM3

    Close
  • Appliance

    Electric/gas range

    May 1, 2025 · Apt ROOM3

    Close
  • Door/window

    Door

    May 1, 2025 · Apt ROOM3

    Close
  • Unsanitary condition

    Pests

    May 1, 2025 · Apt ROOM3

    Close
  • Electric

    Power outage

    May 1, 2025 · Apt ROOM3

    Close
  • Paint/plaster

    Ceiling

    Mar 25, 2025 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Mar 25, 2025 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Mar 25, 2025 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Mar 25, 2025 · Apt 1

    Close
  • Water leak

    Damp spot

    Mar 25, 2025 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Feb 21, 2025 · Apt 1

    Close
  • Water leak

    Damp spot

    Feb 21, 2025 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Feb 21, 2025 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2025 · Apt 2FLOOR

    Close
  • Paint/plaster

    Wall

    Jan 31, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Ceiling

    Jan 31, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Ceiling

    Jan 31, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Ceiling

    Jan 31, 2025 · Apt GROUND

    Close
  • Flooring/stairs

    Floor

    Jan 31, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Wall

    Jan 31, 2025 · Apt GROUND

    Close
  • Unsanitary condition

    Mold

    Jan 31, 2025 · Apt GROUND

    Close
  • Unsanitary condition

    Mold

    Jan 31, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Wall

    Jan 31, 2025 · Apt GROUND

    Close
  • Water leak

    Damp spot

    Jan 31, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Wall

    Jan 31, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Wall

    Jan 31, 2025 · Apt GROUND

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1915
Floors
2
Residential units
3
Building area
3,100 ft²
Lot area
1,877 ft²
Zoning
R6B
Community board
207
Council district
15
Block / lot
3286 / 33
Assessed value
$60,300
Landmark / historic district
No

HPD registration #217789, last renewed Aug 24, 2025.

Questions about 2576 Bainbridge Avenue

Who owns 2576 Bainbridge Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Perez Victor.

Does 2576 Bainbridge Avenue have violations?

Yes. NYC HPD has recorded 74 housing violations at this property.

Is 2576 Bainbridge Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2576 Bainbridge Avenue built?

City records list 1915 as the year it was built.

How many apartments are in 2576 Bainbridge Avenue?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.