roofy

341 East 194 Street

Bronx, NY 10458BBL 2-03282-0001Map

Owner of record: Marion 2630 LLC

341 East 194 Street is a walk-up apartment building built in 1924 in Bronx, 10458. It has 45 residential units across 6 floors. The owner of record is Marion 2630 LLC. HPD has recorded 738 housing violations here, most recently on September 23, 2026. 38 of the 50 most recent violations are still open.

HPD violations
738
DOB violations
2
ECB violations
3
HPD complaints
1,059

What to know

Concern
22 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 23, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 738

  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Civ14 mailed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt b1, 2nd story, 1st apartment from south at west , section ''2632''

    Sep 23, 2026 · Apt B1

    Open — Civ14 mailed
  • C

    Provide ready access to buildings heating system celler entrance door and locked at boiler room

    Sep 23, 2026

    Open — Nov certified on time
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the foyer located at apt 5a, 5th story, 2nd apartment from south at west , section ''2632''

    Sep 23, 2026 · Apt 5A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the east wall, north wall, 1st window frame from west at north wall in the kitchen located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at north wall in the foyer located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall, south wall in the bathroom located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Civ14 mailed
  • A

    Properly repair the source and abate the evidence of a water leak over ceiling in the 1st room from east at south located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the 2nd room from east located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Civ14 mailed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall, north wall, south wall, east wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 2nd room from east located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Nov sent out
Show 40 more ↓
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, north wall in the private hallway located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st closet from south at west wall door, 1st closet from south at west wall door frame, north wall, south wall, east wall, west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, 1st door frame from east at south wall in the kitchen located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall, 1st window frame from north at east wall in the bathroom located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, north wall, south wall, west wall in the foyer located at apt 5d, 5th story, 1st apartment from north at east , section ''2632''

    Sep 23, 2026 · Apt 5D

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at riser pipe in the bathroom located at apt 5a, 5th story, 2nd apartment from south at west

    Sep 22, 2026 · Apt 5A

    Open — Civ14 mailed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 1st apartment from north at east , section at north

    Sep 22, 2026 · Apt 5D

    Open — Civ14 mailed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 1st apartment from north at east , section at north

    Sep 22, 2026 · Apt 3D

    Open — Civ14 mailed
  • B

    Repair the roof so that it will not leak at above ceiling in the foyer located at apt 5a, 5th story, 2nd apartment from south at west

    Sep 22, 2026 · Apt 5A

    Open — Civ14 mailed
  • B

    Refit at north fire door at public hall, 1st story

    Sep 22, 2026

    Open — Nov certified on time
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3d, 3rd story, 1st apartment from north at east , section at north

    Sep 22, 2026 · Apt 3D

    Open — Not complied with
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 2nd apartment from south at west

    Sep 22, 2026 · Apt 5A

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked door at basement at boiler room

    Sep 22, 2026

    Open — Nov certified on time
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sqft observed at all walls and ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from north at east , section at north

    Sep 22, 2026 · Apt 3D

    Open — Civ14 mailed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5a, 5th story, 2nd apartment from south at west

    Sep 22, 2026 · Apt 5A

    Open — First no access to re- inspect violation
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at north fire door at public hall, 1st story

    Sep 22, 2026

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 5d, 5th story, 1st apartment from north at east

    Aug 21, 2026 · Apt 5D

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the bathroom located at apt 5d, 5th story, 1st apartment from north at east

    Aug 21, 2026 · Apt 5D

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from west at north wall in the kitchen located at apt 5d, 5th story, 1st apartment from north at east

    Aug 21, 2026 · Apt 5D

    Open — Certification postponment granted
  • A

    Paint with light colored paint to the satisfaction of this department the west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall, 1st door frame from north at east wall, 1st door frame from south at west wall in the 99th terrace from north at center located at apt 5d, 5th story, 1st apartment from north at east

    Aug 21, 2026 · Apt 5D

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, south wall, east wall, west wall, ceiling, 1st door from south at west wall, 1st door frame from south at west wall in the bathroom located at apt 5d, 5th story, 1st apartment from north at east

    Aug 21, 2026 · Apt 5D

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, south wall in the kitchen located at apt 5d, 5th story, 1st apartment from north at east

    Aug 21, 2026 · Apt 5D

    Open — Civ14 mailed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 2nd closet from east at south wall door, north wall, south wall, east wall, west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 5d, 5th story, 1st apartment from north at east

    Aug 21, 2026 · Apt 5D

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the kitchen located at apt 5d, 5th story, 1st apartment from north at east

    Aug 21, 2026 · Apt 5D

    Open — Certification postponment granted
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2h, 2nd story, 1st apartment from north at east

    Aug 11, 2026 · Apt 2H

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2h, 2nd story, 1st apartment from north at east

    Aug 11, 2026 · Apt 2H

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2h, 2nd story, 1st apartment from north at east

    Aug 11, 2026 · Apt 2H

    Open — Civ14 mailed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2h, 2nd story, 1st apartment from north at east

    Aug 11, 2026 · Apt 2H

    Open — Civ14 mailed
  • C

    Replace or repair the self-closing doors that is missing or defective defective hinges in the entrance located at apt 2h, 2nd story, 1st apartment from north at east

    Aug 11, 2026 · Apt 2H

    Open — First no access to re- inspect violation
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4h, 4th story, 1st apartment from east at south , section ''2630''

    Jun 24, 2026 · Apt 4H

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west , section ''north''

    Apr 11, 2026 · Apt 2B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 2nd room from east located at apt 1d, 2nd story, 1st apartment from north at east , section ''north''

    Apr 11, 2026 · Apt 1D

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 1d, 2nd story, 1st apartment from north at east , section ''north''

    Apr 11, 2026 · Apt 1D

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1d, 2nd story, 1st apartment from north at east , section ''north''

    Apr 11, 2026 · Apt 1D

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1d, 2nd story, 1st apartment from north at east , section ''north''

    Apr 11, 2026 · Apt 1D

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at west wall in the 2nd room from east located at apt 1d, 2nd story, 1st apartment from north at east , section ''north''

    Apr 11, 2026 · Apt 1D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective bulging wood floor in the 2nd room from east located at apt 1d, 2nd story, 1st apartment from north at east , section ''north''

    Apr 11, 2026 · Apt 1D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood door frame in the bathroom located at apt 1d, 2nd story, 1st apartment from north at east , section ''north''

    Apr 11, 2026 · Apt 1D

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective marble saddle at floor in the bathroom located at apt 1d, 2nd story, 1st apartment from north at east , section ''north''

    Apr 11, 2026 · Apt 1D

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 30 sq ft at east wall, north wall and ceiling in the bathroom located at apt 1d, 2nd story, 1st apartment from north at east , section ''north''

    Apr 11, 2026 · Apt 1D

    Open — First no access to re- inspect violation

DOB building violations · 2

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Dec 11, 2001

    Dob violation - dismissed

ECB violations · 3

  • Class - 2

    At time of inspection,observed ongoing construction activities contrary mayor;s emergency executive order 120 & subsequant orders incorporating requirements of governor's executive order 202.34 & subsequant

    Jul 23, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to maintain. at time of inspection, i noticed the kitchen sink plumbing is leaking, the sink in bathroom faucet is leaking, there is indication of mold on bathroom ceiling, toilet tank is cracked, kitch

    Oct 8, 2019

    Resolve
  • Non-hazardous

    Failure to provide all required information to demonstrate compliance with all applicable laws for related application # 200639666. remedy: provide all required information forthwith.

    Apr 9, 2003

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 22, 2026 · Apt BLDG

    Open
  • Unsanitary condition

    Pests

    Oct 14, 2026 · Apt 5D

    Open
  • Paint/plaster

    Wall

    Oct 14, 2026 · Apt 5D

    Open
  • Plumbing

    Basin/sink

    Oct 14, 2026 · Apt 5D

    Open
  • Unsanitary condition

    Pests

    Sep 23, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Sep 23, 2026 · Apt 5D

    Close
  • Appliance

    Refrigerator

    Sep 20, 2026 · Apt 3C

    Close
  • Heat/hot water

    Apartment only

    Sep 20, 2026 · Apt 5A

    Close
  • Plumbing

    Water supply

    Sep 20, 2026 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Sep 20, 2026 · Apt 3C

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Sep 20, 2026 · Apt 5D

    Close
  • Unsanitary condition

    Pests

    Sep 16, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Sep 16, 2026 · Apt 5D

    Close
  • Paint/plaster

    Wall

    Sep 11, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Sep 11, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Aug 31, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Aug 24, 2026 · Apt 5D

    Close
  • Plumbing

    Water supply

    Aug 20, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Aug 16, 2026 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Aug 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Aug 16, 2026 · Apt 5D

    Close
  • Appliance

    Electric/gas range

    Aug 14, 2026 · Apt 5D

    Close
  • Flooring/stairs

    Floor

    Aug 14, 2026 · Apt 5D

    Close
  • Unsanitary condition

    Pests

    Aug 14, 2026 · Apt 5D

    Close
  • Unsanitary condition

    Pests

    Aug 14, 2026 · Apt 5D

    Close
  • Unsanitary condition

    Pests

    Aug 14, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Aug 14, 2026 · Apt 1G

    Close
  • Paint/plaster

    Wall

    Aug 14, 2026 · Apt 5D

    Close
  • Paint/plaster

    Wall

    Aug 10, 2026 · Apt 5D

    Close
  • Paint/plaster

    Wall

    Aug 10, 2026 · Apt 5D

    Close
  • Plumbing

    Water supply

    Aug 10, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Aug 9, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Aug 9, 2026 · Apt 5E

    Close
  • Plumbing

    Toilet

    Jul 30, 2026 · Apt 2H

    Close
  • Plumbing

    Bathtub/shower

    Jul 30, 2026 · Apt 2H

    Close
  • Plumbing

    Toilet

    Jul 27, 2026 · Apt 2H

    Close
  • Heat/hot water

    Apartment only

    Jul 27, 2026 · Apt 2H

    Close
  • Door/window

    Window frame

    May 27, 2026 · Apt 5D

    Close
  • Appliance

    Refrigerator

    Apr 9, 2026 · Apt 4H

    Close
  • Unsanitary condition

    Mold

    Mar 31, 2026 · Apt 1D

    Close
  • Door/window

    Door

    Mar 31, 2026 · Apt 1D

    Close
  • Paint/plaster

    Wall

    Mar 31, 2026 · Apt 1D

    Close
  • Flooring/stairs

    Floor

    Mar 31, 2026 · Apt 1D

    Close
  • Water leak

    Heavy flow

    Mar 31, 2026 · Apt 1D

    Close
  • Paint/plaster

    Wall

    Mar 31, 2026 · Apt 1D

    Close
  • Appliance

    Electric/gas range

    Mar 20, 2026 · Apt 2A

    Close
  • Appliance

    Electric/gas range

    Mar 16, 2026 · Apt 2B

    Close
  • Appliance

    Refrigerator

    Feb 25, 2026 · Apt 3C

    Close
  • Appliance

    Electric/gas range

    Feb 25, 2026 · Apt 3C

    Close
  • Door/window

    Door

    Feb 25, 2026 · Apt 3C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1924
Floors
6
Residential units
45
Building area
44,322 ft²
Lot area
8,366 ft²
Zoning
R7B
Community board
207
Council district
15
Block / lot
3282 / 1
Assessed value
$1,364,850
Landmark / historic district
No

HPD registration #200254, last renewed Aug 12, 2025.

Questions about 341 East 194 Street

Who owns 341 East 194 Street?

The owner of record in NYC Department of City Planning PLUTO data is Marion 2630 LLC.

Does 341 East 194 Street have violations?

Yes. NYC HPD has recorded 738 housing violations at this property.

Is 341 East 194 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 341 East 194 Street built?

City records list 1924 as the year it was built.

How many apartments are in 341 East 194 Street?

It has 45 residential units and 49 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.