roofy

2865 Webster Avenue

Bronx, NY 10458BBL 2-03279-0075Map

Owner of record: 2865 Webster Avenue LLC

2865 Webster Avenue is a walk-up apartment building built in 1925 in Bronx, 10458. It has 10 residential units across 3 floors. The owner of record is 2865 Webster Avenue LLC. HPD has recorded 214 housing violations here, most recently on January 23, 2026. 11 of the 50 most recent violations are still open.

HPD violations
214
DOB violations
26
ECB violations
11
HPD complaints
328

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jan 23, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 214

  • B

    Remove all encumbrances consisting of consisting of house hold items near scuttle ladder at public hall, 3rd story

    Jan 23, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 1

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building vestibule door (from vestibule to public hall) , 1st story

    Feb 23, 2025

    Open — Not complied with
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system incorrect information location: basement, at public hall, 1st story

    Dec 4, 2024

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at that is missing at public hall, 1st story

    Dec 4, 2024

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from south at west

    Dec 4, 2024 · Apt 1

    Closed — Violation closed
  • B

    Abate the nuisance consisting of construction materials at basement (boiler room) throughout

    Oct 31, 2024

    Closed — Violation dismissed
  • C

    Make safe by properly repairing the structural defect. cracks (wood) floor joist/ support pillar at basement (boiler room)

    Oct 31, 2024

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood(door) (hinge) vestibule to public hall from vestibule

    Oct 31, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective (wood) staircase at basement (boiler room) shaking/ old

    Oct 31, 2024

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Remove all encumbrances consisting of lock and garbage at vestibule

    Oct 31, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective door frame (wood) at vestibule door to vestibule from public hall (missing/ broken)

    Oct 31, 2024

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from south at west

    Oct 31, 2024 · Apt 1

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective erroded wood at cabinet floor at sink in the kitchen located at apt 1, 2nd story, 1st apartment from south at west

    Aug 9, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective erroded and cracked wood counter top at sink in the kitchen located at apt 1, 2nd story, 1st apartment from south at west

    Aug 9, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 3rd room from east at south located at apt 1, 2nd story, 1st apartment from south at west

    Aug 9, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective connection waste line pipe at sink in the kitchen located at apt 1, 2nd story, 1st apartment from south at west

    Aug 9, 2024 · Apt 1

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak above ceiling in the 3rd room from east at south located at apt 1, 2nd story, 1st apartment from south at west

    Aug 9, 2024 · Apt 1

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended celotex tiles at ceiling in the entire apartment located at apt 1, 2nd story, 1st apartment from south at west

    Jun 28, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1, 2nd story, 1st apartment from south at west

    Jun 28, 2024 · Apt 1

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east at north located at apt 1, 2nd story, 1st apartment from south at west

    Jun 28, 2024 · Apt 1

    Open — Nov sent out
  • C

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet at toilet in the bathroom located at apt 1, 2nd story, 1st apartment from south at west

    Jun 28, 2024 · Apt 1

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2fl, 3rd story, 1st apartment from north at east

    Jan 9, 2024 · Apt 2FL

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2fl, 3rd story, 1st apartment from north at east

    Jan 9, 2024 · Apt 2FL

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2fl, 3rd story, 1st apartment from north at east

    Jan 9, 2024 · Apt 2FL

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Apr 13, 2023 · Apt 1

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Apr 13, 2023 · Apt 1

    Closed — Violation dismissed
  • A

    Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk

    Mar 7, 2023

    Closed — Violation dismissed
  • C

    Properly repair the broken or defective at building entrance door , 1st story

    Mar 7, 2023

    Closed — Violation closed
  • C

    Properly repair the broken or defective lockset and assembly at building front entrance door at public hall, 1st story

    Aug 8, 2022

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of rodents rats at basement

    Aug 8, 2022

    Closed — Violation dismissed
  • C

    Cleanse and disinfect to the satisfaction of this department after removing the water and sewage at basement

    Aug 8, 2022

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south

    Apr 10, 2022 · Apt 1

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at building entrance at public hall, 1st story

    Jan 29, 2022

    Closed — Violation closed
  • C

    Properly repair the broken or defective lock set at entrance door to bldg at public hall stairs, 1st story

    Aug 18, 2021

    Closed — Violation closed
  • C

    Replace with new the broken or defective the 2nd and 3rd wood treads and risers up from bottom at public hall stairs, 1st story

    Aug 18, 2021

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1, 2nd story, 1st apartment from north at east

    May 12, 2021 · Apt 1

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling, east and south walls. in the bathroom located at apt 1, 2nd story, 1st apartment from north at east

    May 12, 2021 · Apt 1

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approx 10 sq ft at ceiling, approx 12 sq ft at east wall and approx 6 sq ft at south wall in the bathroom located at apt 1, 2nd story, 1st apartment from north at east

    May 12, 2021 · Apt 1

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; located at apt 1, 2nd story, 1st apartment from north at east

    May 12, 2021 · Apt 1

    Closed — Violation closed
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 2nd story, 1st apartment from west at north

    Dec 10, 2020 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north located at apt 1, 2nd story, 1st apartment from west at north

    Dec 10, 2020 · Apt 1

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling approx 5 sq feet in the kitchen located at apt 1, 2nd story, 1st apartment from west at north

    Dec 10, 2020 · Apt 1

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling approx 5 sq feet in the kitchen located at apt 1, 2nd story, 1st apartment from west at north original violation 13933703 issued 10-dec-20 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Dec 10, 2020 · Apt 1

    Closed — Violation closed
  • B

    Replace with new the broken or defective upper glass pane to window at west in the kitchen located at apt 1, 2nd story, apartment at east

    Sep 29, 2020 · Apt 1

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Sep 21, 2020 · Apt 1

    Open — First no access to re- inspect violation
  • A

    Properly secure the loose escutcheon at heat riser in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Sep 21, 2020 · Apt 1

    Open — First no access to re- inspect violation
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Sep 21, 2020 · Apt 1

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective warped wood floor in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Sep 21, 2020 · Apt 1

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from south at west

    Sep 21, 2020 · Apt 1

    Closed — Violation closed

DOB building violations · 26

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
Show 16 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 15, 2010

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 15, 2010

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 15, 2010

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed

ECB violations · 11

  • Class - 3

    Observed water stains and damaged ceiling finishes at the first floor commercial space exp.#1 (front)., repair and or replace

    Jan 6, 2022 · Penalty $500

    Active
  • Class - 2

    Failure to file a annual boiler report /correct all violating conditions and submit certificate of corrections other get rid of oil in pails, as well as, combustibles storage by fuel tank

    Apr 16, 2019 · Penalty $312

    Active
  • Class - 2

    B254:50 boiler room door not fire proof.50a no emergency switch outside of boiler room. 50b need to remove all (thing) out of boiler room.

    Aug 8, 2018 · Penalty $625

    Active
  • Class - 2

    B254;4a;19b;34a;34b;32a;50;50a:50-boiler room door not fire proof.51a-no emergency cut off switch outside boiler room.50b-need to remove allthings out of boiler room.

    Aug 8, 2018 · Penalty $625

    Active
  • Class - 1

    B154/4a/19b/34a/34b/32a/15/28/36/50a-boiler room door not fire proof/50b-no emergence cut off switch outside of boiler room door/50c-boiler room not a storage room/50d-remove threaded end from safety or relief

    Sep 11, 2010 · Penalty $1,000

    Resolve
  • Class - 1

    B154/4a/19b/34a/34b/32a/15/36/50a-boiler room not fire proof/50b-no emergence fuel cut off switch outside boiler door/50c-boiler room not a storage room/50d-remove threaded end from safety or relief valve disch

    Sep 11, 2010 · Penalty $1,000

    Resolve
  • Class - 3

    B354/38/50b/36/50a-no emergence fuel cut off switch @ door entrance

    Sep 11, 2010 · Penalty $200

    Resolve
  • Class - 1

    B101/50a/50b/50a-work w/o permit 28-105.1/50b-no work permit filled with dob for the installation of the boilers

    Sep 11, 2010

    Resolve
  • Class - 1

    B101,50a,b. 50a- work w/o a permit 28-105.1 50a- no work permit filed w/dob for the replacement boiler

    Jul 3, 2010

    Resolve
  • Class - 2

    B254,36,15,16,32a,50a. exposed wood beams in boiler room. 50b- valves on return and header missing.

    Jul 3, 2010 · Penalty $250

    Resolve
Show 1 more ↓
  • Class - 1

    1(b154),28-301.1,cease use,51,3b,c,15,32a,50,24b,50a,b,c,d,e,f. complaint #2146580- fdny shut boiler down due to hazardous fumes & smoke conditions 'agg-2'. repair hazardous condition immediately: do not leave

    Jun 18, 2010 · Penalty $5,000

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 22, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 22, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 22, 2026 · Apt ALL

    Open
  • Heat/hot water

    Entire building

    Oct 22, 2026 · Apt 1

    Open
  • Heat/hot water

    Entire building

    Oct 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 20, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jun 11, 2026 · Apt 1

    Close
  • Plumbing

    Water supply

    Jun 11, 2026 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Mar 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 8, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Jan 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2025 · Apt ALL

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt ALL

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2025 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2025 · Apt ALL

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 5, 2025 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2025 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Feb 12, 2025 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2024 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2024 · Apt BLDG

    Close
  • Plumbing

    Toilet

    Dec 7, 2024 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Dec 2, 2024 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 30, 2024 · Apt BUILDI

    Close
  • Plumbing

    Basin/sink

    Aug 8, 2024 · Apt 1

    Close
  • Plumbing

    Toilet

    Aug 8, 2024 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Aug 8, 2024 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Jun 27, 2024 · Apt 2869WE

    Close
  • Paint/plaster

    Ceiling

    Jun 27, 2024 · Apt 2869WE

    Close
  • Plumbing

    Toilet

    Jun 27, 2024 · Apt 2869WE

    Close
  • Heat/hot water

    Entire building

    Apr 19, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 7, 2024 · Apt 3R

    Close
  • Appliance

    Electric/gas range

    Jan 7, 2024 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Jan 7, 2024 · Apt 2FL

    Close
  • Heat/hot water

    Entire building

    Oct 23, 2023 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Oct 19, 2023 · Apt 1

    Close
  • Water leak

    Heavy flow

    Nov 3, 2022 · Apt SALONI

    Close
  • Electric

    Power outage

    Aug 7, 2022 · Apt 2

    Close
  • Electric

    Power outage

    Aug 7, 2022 · Apt 1

    Close
  • General

    Bell/buzzer/intercom

    Apr 8, 2022 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1925
Floors
3
Residential units
10
Building area
10,800 ft²
Lot area
11,468 ft²
Zoning
R7D
Community board
207
Council district
15
Block / lot
3279 / 75
Assessed value
$781,650
Landmark / historic district
No

HPD registration #711768, last renewed Oct 21, 2025.

Questions about 2865 Webster Avenue

Who owns 2865 Webster Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 2865 Webster Avenue LLC.

Does 2865 Webster Avenue have violations?

Yes. NYC HPD has recorded 214 housing violations at this property.

Is 2865 Webster Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2865 Webster Avenue built?

City records list 1925 as the year it was built.

How many apartments are in 2865 Webster Avenue?

It has 10 residential units and 16 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.