389 East 194 Street
Bronx, NY 10458BBL 2-03277-0002Map
Owner of record: 389 East 194 St HDFC
389 East 194 Street is a walk-up apartment building built in 1910 in Bronx, 10458. It has 15 residential units across 5 floors. The owner of record is 389 East 194 St HDFC. HPD has recorded 320 housing violations here, most recently on April 6, 2026. 42 of the 50 most recent violations are still open.
- HPD violations
- 320
- DOB violations
- 4
- ECB violations
- 3
- HPD complaints
- 367
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 320
- CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum of 130 degrees in the entire apartment located at apt 22, 2nd story, 1st apartment from south at west
Apr 6, 2026 · Apt 22
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 22, 2nd story, 1st apartment from south at west
Apr 6, 2026 · Apt 22
Open — Nov certified late - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 22, 2nd story, 1st apartment from south at west
Apr 6, 2026 · Apt 22
Open — Nov certified late - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 22, 2nd story, 1st apartment from south at west
Apr 6, 2026 · Apt 22
Open — Nov certified late - BHazardous
Repair the broken or defective connection wasteline at washbasin in the bathroom located at apt 22, 2nd story, 1st apartment from south at west
Apr 6, 2026 · Apt 22
Open — Nov certified late - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 22, 2nd story, 1st apartment from south at west
Apr 6, 2026 · Apt 22
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 31, 3rd story, 1st apartment from east at south
Mar 28, 2026 · Apt 31
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the bathroom located at apt 31, 3rd story, 1st apartment from east at south
Mar 28, 2026 · Apt 31
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum of 130 degrees in the entire apartment located at apt 31, 3rd story, 1st apartment from east at south
Mar 28, 2026 · Apt 31
Open — Invalid certification - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at riser in the bathroom located at apt 31, 3rd story, 1st apartment from east at south
Mar 28, 2026 · Apt 31
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations 2 improperly installed ( if on wall must be 4'' to 12'' from ceiling- if on ceiling must be 4'' from wall ) in the entire apartment located at apt 22, 2nd story, 1st apartment from south at west
Jan 18, 2026 · Apt 22
Open — Nov certified late - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules 2 improperly installed ( if on wall must be 4'' to 12'' from ceiling- if on ceiling must be 4'' from wall ) in the entire apartment located at apt 22, 2nd story, 1st apartment from south at west
Jan 18, 2026 · Apt 22
Open — Nov certified late - BHazardous
Repair the leaky and/or defective water supply pipe underneath washbasin in the bathroom located at apt 22, 2nd story, 1st apartment from south at west
Jan 18, 2026 · Apt 22
Open — Nov certified late - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceding 130 degrees at fixtures in the bathroom and kitchen. located at apt 22, 2nd story, 1st apartment from south at west
Jan 18, 2026 · Apt 22
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective metal cornice at roof parapet at south exterior wall front of building at cornice
Dec 22, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall at public hall, 1st story
Aug 8, 2025
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling and west wall at public hall, 1st story
Aug 8, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at intermediate landing at public hall stairs, 1st story
Aug 8, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent material at east wall at intermediate landing at public hall stairs, 1st story
Aug 8, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east and south wall at intermediate landing at public hall stairs, 2nd story
Aug 8, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked sheet metal cornice at building front at cornice
Aug 8, 2025
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 8, 2025
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 41, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 41
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent material at east and south wall at intermediate landing at public hall stairs, 2nd story
Aug 8, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at intermediate landing at public hall stairs, 3rd story
Aug 8, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent material at east wall at intermediate landing at public hall stairs, 3rd story
Aug 8, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak behind east wall at intermediate landing at public hall stairs, 3rd story
Aug 8, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at intermediate landing at public hall stairs, 4th story
Aug 8, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent material at east wall at intermediate landing at public hall stairs, 4th story
Aug 8, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak behind east wall at intermediate landing at public hall stairs, 4th story
Aug 8, 2025
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of consisting of vegetation growing vines growing on building at 5th to 2nd story, from north at west exterior wall
Aug 8, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective consisting of a slide bolt in lockable position at door in the entrance located at apt 41, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 41
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 41, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 41
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash spring balance at fire escape window at north wall in the 1st room from north at west located at apt 41, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 41
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroom located at apt 41, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 41
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling and behind north wall in the bathroom located at apt 41, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 41
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 41, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 41
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall at public hall stairs, 2nd story
Mar 9, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall at public hall stairs, 3rd story
Mar 9, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall stairs, 3rd story
Mar 9, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at south wall at public hall stairs, 2nd story
Mar 9, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall at public hall, 1st story
Mar 9, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 1st story
Mar 9, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall at public hall stairs, 1st story
Mar 9, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall stairs, 1st story
Mar 9, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3, 1st story, 1st apartment from north at east
Feb 26, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3, 1st story, 1st apartment from north at east
Feb 26, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 1st story, 1st apartment from north at east
Feb 26, 2025 · Apt 3
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 1st story, 1st apartment from north at east
Feb 26, 2025 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 3, 1st story, 1st apartment from north at east
Feb 26, 2025 · Apt 3
Open — Nov sent out
DOB building violations · 4
- Construction other optional
Partial vacate order due to; cracked/bulging/spalling/spalled stucco and cracked/cracking masonry at parapet on exposure #4 east elevation located above side exist door and staircase. remedy: vacate courtyard at exposure #4 east elevation and restrict access to vacate area
Aug 3, 2026
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner. observed the following conditions. exposure 1 south elevation damaged joints. loose brick & loose section of cornice. exposure 4 east elevation hazardous area collapsing masonry. remedy: repair and/or replace
Jul 22, 2026
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner. observed severly corroded cornice with large rust holes on exposure 1. remedy: repair and or replace
Oct 16, 2025
Dob violation - active - Immediate emergency anythingoptional
Install approximately 35 linear feet of sidewalk shed at exposure#1 to safeguard the public and property
Jun 27, 2022
Dob violation - dismissed
ECB violations · 3
- Class - 1
Failure to provide unobstructed exit passageway. observed the following objects stored at exposure 3 north elevation 2nd floor fire escape landing. remedy: removed egress obstruction.
Jul 22, 2026 · Penalty $2,500
Active - Class - 2
At time of inspection of a 5 story occupied building sidewalk shed erected exp#1 with valid permit i noticed sidewalk shed has missing information panel this create hazardous situation for first responder locat
Dec 6, 2024 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code complaint manner, note at the front of wood and metal cornice is open and defective., repair and/replace
Jun 23, 2022 · Penalty $1,250
Active
Complaints
- Safety
Smoke detector
May 26, 2026 · Apt 23
Close - Plumbing
Basin/sink
Apr 2, 2026 · Apt 22
Close - Safety
Smoke detector
Apr 2, 2026 · Apt 22
Close - Plumbing
Water supply
Apr 2, 2026 · Apt 22
Close - Plumbing
Basin/sink
Apr 2, 2026 · Apt 22
Close - Plumbing
Basin/sink
Apr 2, 2026 · Apt 23
Close - Plumbing
Basin/sink
Apr 2, 2026 · Apt 23
Close - Plumbing
Basin/sink
Apr 2, 2026 · Apt 23
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt 31
Close - Plumbing
Basin/sink
Mar 23, 2026 · Apt 23
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 16, 2026 · Apt 22
Close - Water leak
Heavy flow
Jan 16, 2026 · Apt 22
Close - Plumbing
Water supply
Jan 16, 2026 · Apt 22
Close - Heat/hot water
Entire building
Dec 19, 2025 · Apt BLDG
Close - Plumbing
Water supply
Aug 7, 2025 · Apt 41
Close - Paint/plaster
Ceiling
Aug 7, 2025 · Apt 41
Close - Plumbing
Bathtub/shower
Aug 7, 2025 · Apt 41
Close - Plumbing
Basin/sink
May 15, 2025 · Apt 23
Close - Water leak
Slow leak
May 15, 2025 · Apt 23
Close - Plumbing
Basin/sink
Apr 30, 2025 · Apt 23
Close - Water leak
Damp spot
Apr 21, 2025 · Apt APT23
Close - Heat/hot water
Entire building
Apr 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 29, 2025 · Apt 3
Close - Water leak
Slow leak
Jan 29, 2025 · Apt 3
Close - Flooring/stairs
Floor
Jan 29, 2025 · Apt 3
Close - Heat/hot water
Entire building
Jan 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2024 · Apt 22
Close - Heat/hot water
Entire building
Nov 24, 2024 · Apt 22
Close - Heat/hot water
Entire building
Nov 14, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 13, 2024 · Apt 22
Close - Heat/hot water
Entire building
Nov 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close - Flooring/stairs
Floor
Sep 26, 2024 · Apt 2
Close - Water leak
Heavy flow
Sep 26, 2024 · Apt 2
Close - Unsanitary condition
Mold
Sep 26, 2024 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1910
- Floors
- 5
- Residential units
- 15
- Building area
- 13,475 ft²
- Lot area
- 3,328 ft²
- Zoning
- R7D
- Community board
- 207
- Council district
- 15
- Block / lot
- 3277 / 2
- Assessed value
- $291,600
- Landmark / historic district
- No
HPD registration #204817, last renewed Sep 11, 2025.
Questions about 389 East 194 Street
Who owns 389 East 194 Street?
The owner of record in NYC Department of City Planning PLUTO data is 389 East 194 St HDFC.
Does 389 East 194 Street have violations?
Yes. NYC HPD has recorded 320 housing violations at this property.
Is 389 East 194 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 389 East 194 Street built?
City records list 1910 as the year it was built.
How many apartments are in 389 East 194 Street?
It has 15 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.