roofy

3436 Bailey Place

Bronx, NY 10463BBL 2-03261-0122Map

Owner of record: Broomfield, Angelena F

3436 Bailey Place is a two-family home built in 1910 in Bronx, 10463. It has 2 residential units across 2.5 floors. The owner of record is Broomfield, Angelena F. HPD has recorded 33 housing violations here, most recently on November 15, 2024. 28 of the 33 most recent violations are still open.

HPD violations
33
DOB violations
0
ECB violations
0
HPD complaints
29

What to know

Concern
11 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Nov 15, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 33

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Nov 15, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the 2nd room from east at south located at apt 2, 2nd story, 1st apartment from east at south

    Nov 15, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from east at south

    Nov 15, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 2nd room from east at north located at apt 2, 2nd story, 1st apartment from east at south

    Nov 15, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 2, 2nd story, 1st apartment from east at south

    Nov 15, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd door from north at east wall, 2nd door frame from north at east wall, north wall, east wall, west wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from east at south

    Nov 15, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from east at south

    Nov 15, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Nov 15, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, west wall in the 2nd room from east at north located at apt 2, 2nd story, 1st apartment from east at south

    Nov 15, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the foyer located at apt 2, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2

    Closed — Violation closed
Show 23 more ↓
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall, east wall in the 4th room from north at west located at apt 2, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at east wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from north at east wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective spring balance lower window sash at east wall in the 3rd room from north at east located at apt 2, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the 3rd room from north at east located at apt 2, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from north at west located at apt 2, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, north wall, south wall, west wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at west wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 25, 2024 · Apt 2FLOOR

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at east wall in the 2nd room from east at north located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 25, 2024 · Apt 2FLOOR

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 25, 2024 · Apt 2FLOOR

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the foyer located at apt 2floor, 2nd story, 1st apartment from east at south

    Jun 25, 2024 · Apt 2FLOOR

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 5, 2024

    Open — Info nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2ndflo, 2nd story, 1st apartment from east at south

    Mar 4, 2024 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at north located at apt 2ndflo, 2nd story, 1st apartment from east at south

    Mar 4, 2024 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from east at south

    Mar 4, 2024 · Apt 2NDFLO

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at west wall, 1st door from north at east wall, 1st door frame from north at east wall in the 4th room from east located at apt 2ndflo, 2nd story, 1st apartment from east at south

    Mar 4, 2024 · Apt 2NDFLO

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the 2nd room from east at south located at apt 2ndflo, 2nd story, 1st apartment from east at south

    Mar 4, 2024 · Apt 2NDFLO

    Open — Certification postponment granted
  • B

    Properly repair or replace the broken or defective electrical outlet at south wall in the 4th room from east located at apt 2ndflo, 2nd story, 1st apartment from east at south

    Mar 4, 2024 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the foyer located at apt 2ndflo, 2nd story, 1st apartment from east at south

    Mar 4, 2024 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from east at south

    Mar 4, 2024 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective window frame lower sash at second window from west at north in the 2nd room from east at north located at apt 2ndflo, 2nd story, 1st apartment from east at south

    Mar 4, 2024 · Apt 2NDFLO

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Nov 21, 2024 · Apt 2

    Close
  • Paint/plaster

    Wall

    Nov 15, 2024 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Nov 12, 2024 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Nov 3, 2024 · Apt 2

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 3, 2024 · Apt HALLWA

    Close
  • Safety

    Fire escape

    Oct 3, 2024 · Apt HALLWA

    Close
  • Unsanitary condition

    Pests

    Oct 3, 2024 · Apt HALLWA

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 3, 2024 · Apt HALLWA

    Close
  • Safety

    Fire escape

    Oct 3, 2024 · Apt HALLWA

    Close
  • Paint/plaster

    Wall

    Sep 12, 2024 · Apt 2

    Close
Show 19 more ↓
  • Door/window

    Window frame

    Sep 12, 2024 · Apt 2

    Close
  • Electric

    Wiring

    Sep 12, 2024 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Sep 12, 2024 · Apt 2

    Close
  • Safety

    Window guard broken/missing

    Jun 24, 2024 · Apt 2FLOOR

    Close
  • Door/window

    Window frame

    Jun 24, 2024 · Apt 2FLOOR

    Close
  • Paint/plaster

    Wall

    Jun 24, 2024 · Apt 2FLOOR

    Close
  • Paint/plaster

    Door/frame

    Jun 24, 2024 · Apt 2FLOOR

    Close
  • Electric

    Outlet/switch

    Jun 24, 2024 · Apt 2FLOOR

    Close
  • Flooring/stairs

    Floor

    Jun 24, 2024 · Apt 2FLOOR

    Close
  • Electric

    Wiring

    Jun 24, 2024 · Apt 2FLOOR

    Close
  • Electric

    Lighting

    Jun 24, 2024 · Apt 2FLOOR

    Close
  • Heat/hot water

    Apartment only

    Mar 29, 2024 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Mar 26, 2024 · Apt 2LEVEL

    Close
  • Heat/hot water

    Apartment only

    Mar 24, 2024 · Apt SECOND

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2024 · Apt 2NDFLO

    Close
  • Appliance

    Electric/gas range

    Feb 29, 2024 · Apt 2NDFLO

    Close
  • Door/window

    Window frame

    Feb 29, 2024 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Feb 29, 2024 · Apt 2NDFLO

    Close
  • Plumbing

    Water supply

    Feb 29, 2024 · Apt 2NDFLO

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
1910
Floors
2.5
Residential units
2
Building area
2,340 ft²
Lot area
2,950 ft²
Zoning
R6
Community board
208
Council district
14
Block / lot
3261 / 122
Assessed value
$54,840
Landmark / historic district
No

Questions about 3436 Bailey Place

Who owns 3436 Bailey Place?

The owner of record in NYC Department of City Planning PLUTO data is Broomfield, Angelena F.

Does 3436 Bailey Place have violations?

Yes. NYC HPD has recorded 33 housing violations at this property.

Is 3436 Bailey Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 3436 Bailey Place built?

City records list 1910 as the year it was built.

How many apartments are in 3436 Bailey Place?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.