roofy

3400 Ft Independence St

Bronx, NY 10463BBL 2-03258-0073Map

Owner of record: Cannon Heights INC

3400 Ft Independence St is an elevator apartment building built in 1965 in Bronx, 10463. It has 171 residential units across 22 floors. The owner of record is Cannon Heights INC. HPD has recorded 84 housing violations here, most recently on September 20, 2026. 17 of the 50 most recent violations are still open.

HPD violations
84
DOB violations
72
ECB violations
57
HPD complaints
198

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 20, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 84

  • C

    Remove device preventing door from being self-closing consisting of a door sweep permanently attached in the entrance located at apt 15c, 14th story, 4th apartment from north at east

    Sep 20, 2026 · Apt 15C

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and all walls throughout in the 3rd room from north at east located at apt 15c, 14th story, 4th apartment from north at east

    Sep 20, 2026 · Apt 15C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall at closet interior in the private hallway located at apt 15c, 14th story, 4th apartment from north at east

    Sep 20, 2026 · Apt 15C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 4th room from north located at apt 15c, 14th story, 4th apartment from north at east

    Sep 20, 2026 · Apt 15C

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall around waste line connection in the kitchen located at apt 15c mid level, 14th story, 4th apartment from north at east

    Sep 20, 2026 · Apt 15C

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 15c mid level, 14th story, 4th apartment from north at east

    Sep 20, 2026 · Apt 15C

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north located at apt 15c, 14th story, 4th apartment from north at east

    Sep 20, 2026 · Apt 15C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 14th story

    May 31, 2026

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling at public hall, 14th story

    May 31, 2026

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective mechanical ventilation system at west wall in the bathroom located at apt 15c, 14th story, 4th apartment from north at east

    May 31, 2026 · Apt 15C

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from north located at apt 15c, 14th story, 4th apartment from north at east

    May 31, 2026 · Apt 15C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway located at apt 15c, 14th story, 4th apartment from north at east

    May 31, 2026 · Apt 15C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east and north wall in the 3rd room from north at east located at apt 15c, 14th story, 4th apartment from north at east

    May 31, 2026 · Apt 15C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and east walls in the entire apartment located at apt 15c, 14th story, 4th apartment from north at east

    May 31, 2026 · Apt 15C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 14th story

    May 31, 2026

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 14th story

    May 20, 2026

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling at public hall, 14th story

    May 20, 2026

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 14th story

    May 20, 2026

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 14th story

    May 9, 2026

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at public hall, 15th story

    Apr 27, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at entrance in the entrance located at apt 15c, 15th story, 4th apartment from north at east

    Apr 27, 2026 · Apt 15C

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak at ceiling at public hall, 15th story

    Apr 27, 2026

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd private hallway from north located at apt 15c, 15th story, 4th apartment from north at east

    Apr 27, 2026 · Apt 15C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balance at lower sash at window in the kitchen located at apt 15c, 15th story, 4th apartment from north at east

    Apr 27, 2026 · Apt 15C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and east wall in the 3rd room from north located at apt 15c, 15th story, 4th apartment from north at east

    Apr 27, 2026 · Apt 15C

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall and east wall in the 1st room from north located at apt 15c, 15th story, 4th apartment from north at east

    Apr 27, 2026 · Apt 15C

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling and east wall in the 1st room from north located at apt 15c, 15th story, 4th apartment from north at east

    Apr 27, 2026 · Apt 15C

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt fh, 6th story, 1st apartment from west at north

    Nov 6, 2025 · Apt FH

    Closed — Violation closed
  • B

    Abate the infestation consisting of vermin ants in the entire apartment located at apt 1a, 1st story, 2nd apartment from north at east

    Jun 20, 2023 · Apt 1A

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the floor in the 1st room from north located at apt 1a, 1st story, 2nd apartment from north at east

    Jun 20, 2023 · Apt 1A

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the at floor in the 2nd room from north located at apt 1a, 1st story, 2nd apartment from north at east

    Jun 20, 2023 · Apt 1A

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 2nd apartment from north at east

    Jun 20, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hopper door at trash chute at compactor closet, 1st story

    Jun 20, 2023

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the floor in the 3rd room from north located at apt 1a, 1st story, 2nd apartment from north at east

    Jun 20, 2023 · Apt 1A

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective vinyl tiles at floor in the 3rd room from north located at apt 1a, 1st story, 2nd apartment from north at east

    Jun 20, 2023 · Apt 1A

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective wood mouldings in the 3rd room from north located at apt 1a, 1st story, 2nd apartment from north at east

    Jun 20, 2023 · Apt 1A

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at floor in the 3rd room from north located at apt 1a, 1st story, 2nd apartment from north at east

    Jun 20, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Remove all obstructions and repair all defects in at bathtub in the bathroom located at apt 1a, 1st story, 2nd apartment from north at east

    Jun 20, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Remove all obstructions from water closet at water closet in the bathroom located at apt 1a, 1st story, 2nd apartment from north at east

    Jun 20, 2023 · Apt 1A

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 17, 2023

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south and west walls in the 2nd room from north at west located at apt 3f, 2nd story, 3rd apartment from south at west

    Jan 10, 2023 · Apt 3F

    Closed — Violation closed
  • A

    Properly repair the broken or defective door at base cabinet at sink, in the kitchen located at apt 9d, 9th story, 1st apartment from south at west

    Nov 7, 2022 · Apt 9D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceiling, in the entire apartment located at apt 9d, 9th story, 1st apartment from south at west

    Nov 7, 2022 · Apt 9D

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at fire stairs '' a '' at public hall, 9th story

    Nov 7, 2022

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at fire stairs ''a'' and ''b'' at public hall, 8th story

    Nov 7, 2022

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department east wall, at public hall, 2nd story

    Nov 7, 2022

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department east wall, at public hall, 10th story

    Nov 7, 2022

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material east wall, at public hall, 10th story

    Nov 7, 2022

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hopper at refuse closet at public hall, 6th story

    Nov 7, 2022

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hopper at refuse closet at public hall, 13th story

    Nov 7, 2022

    Closed — Violation closed

DOB building violations · 72

  • Construction other optional

    Failure to maintain building in code compliant manner. observed: exp 1 spalling/defected balcony slab 3 and 4th floor. crack at 8th and 10 floor. exposure 2 damaged joints. exposure 3 broken window pane at 6 damaged joints, damaged post/rails at exit steps. roof area:open/ loose fence & open joints at bulkhead. remedy: repair and/or replace

    Jun 20, 2024

    Dob violation - active
  • Construction other optional

    Vacate order due to cracked and defective balcony slabs at exp1 north elev and exp3 south elev.remedy:immediately vacate all balconies/terra ces at exp1 and exp3

    Jun 20, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - dismissed
  • Construction other optional

    Emergency work order due to unsecured fence at areas along parapet railing.remedy immediately make repairs.restored fence at paraet areas

    Sep 28, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Construction other optional

    Ftm exterior bldg facade and appurtenances. deteriorated/open mortar joints on exp2 north elev spalled concrete at balcony slab on exp1 west elev. remedy: maintain exterior bldg facade, repair damaged facade as per 1rcny-103-04

    Nov 16, 2022

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Aug 20, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2019

    Aug 19, 2022

    Dob violation - dismissed
Show 40 more ↓
  • Construction other optional

    Ftm exterior building walls and appurtenances. observed on exp1 and 2 west and north elev: damaged,spalling mortar joints at several floors exp1 west elev: cracks in brick and mortar joints at several floors damaged crack balcony slabs at several floors. remedy: maintain exterior bldg walls and appurteances,repair damaged facade

    Aug 2, 2022

    Dob violation - active
  • Construction other optional

    Failure to maintain building facade and appurtenances. degraded mortar joint and crack observed various location. exp1 spalled concrete at balcony slab, also observed crack multiple location remedy: maintain exterior building facade, repair damaged facade as per 1 rcny 103-04

    May 11, 2022

    Dob violation - active
  • Construction other optional

    Ftm building walls or appurtenances. observed vertical crack next to 11th floor balcony on exp 1 west elevation, multiple vertcal cracks on areas next to 4,5,6,7,8 floor balconies. on exp 3 east elevation also observed a step crack on lower building on exp 1 west elevation remedy: maintain exterior building wall

    Oct 1, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 6, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 6, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 15, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 15, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 16, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 16, 2018

    Dob violation - resolved
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Mar 2, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 28, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 28, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 28, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 28, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 28, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 21, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 21, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 20, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 20, 2016

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 23, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 22, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 21, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 28, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 28, 2014

    Dob violation - resolved
  • Facade facade optional

    Cycle 7 unsafe report filed

    Oct 15, 2013

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 24, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 24, 2013

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 21, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 21, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 18, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 18, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2010

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 5, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 5, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 17, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 17, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 8, 2007

    Dob violation - resolved

ECB violations · 57

  • Class - 2

    Failure to comply with commissioner's order contained in summons #39061585r issued on 05/04/2022, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert

    Jan 8, 2025 · Penalty $3,125

    Resolve
  • Class - 2

    At a occupied building i observed a sidewalk shed with expired permit x00374809 since 03/28/2024.permit shall be active for the duration the temporary equipment.

    Aug 20, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Expired sidewalk shed permit. note: permit #x00374809-i1-sh expired on03-28-2024. no permit posted on database. remedy: renew permit.

    Jun 20, 2024 · Penalty $3,125

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification: note: loose/damaged parapet panel at expsoure 1 and 3. damaged mud sill at exposure 1 and detached cross brace. remedy: comply with code.

    Jun 20, 2024 · Penalty $2,400

    Active
  • Class - 2

    Atoi observed sidewalk shed in place due to unsafe facade not maintained per code 3307.6.5.3 -1 rotting mudsills 2 missing bolt caps 3 not tight to facade 4 missing high visible markings 5 obstruction of bus s

    Apr 10, 2024 · Penalty $10,000

    Active
  • Class - 2

    At time of inspection of 22 story residential building observed sidewalk shed in place with permit x00374809 expired 3-28-24

    Apr 10, 2024 · Penalty $3,125

    Resolve
  • Class - 2

    Atoi of a 22-story building with a sws erected at exposure# 1. i observed at the driveway vertical members missing high visibly marking creating a potential collapse putting pedestrians in danger. marking are r

    Feb 28, 2024 · Penalty $6,250

    Active
  • Class - 2

    Sidewalk shed does not meet code specifications. damaged mudsills observed on exposure #1 west elevation. damaged cross brace observed on exposure #1 west elevation. remedy: conform shed to code specifications

    Nov 16, 2022 · Penalty $2,400

    Active
  • Class - 2

    Expired permit. sidewalk shed permit expired. #x00374809-i1-sh (expired 9/22/2022). remedy: renew permit

    Nov 16, 2022 · Penalty $625

    Resolve
  • Class - 1

    Failure to maintain building in code complaint manner i observed on the c level floor in the laundry room sprinkler head being blocked by vent lines which does not give the full coverage of the sprinkler head.

    Jul 7, 2022 · Penalty $1,250

    Resolve
Show 40 more ↓
  • Class - 1

    I observed on the c level floor in the laundry room using residential flex hoses being used for 12 commercial gas dryers refer to " ppn 13/25 of 1994" also vent to gas dryers is back pitched and going through a

    Jul 7, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    I observed in the cellar in the laundry room on the c level floor gas lines removed and new gas lines was installed for six stackable commercial gas dryers therefore no test, perform test

    Jul 7, 2022 · Penalty $6,250

    Resolve
  • Class - 1

    I observed in the cellar in the laundry room on the c level floor gas lines removed and new gas lines was installed for six stackable commercial gas dryers without a permit work done 100 percent, obtain permit

    Jul 7, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications.at time of inspection observed exp #1 #3 sidewalk shed underneath light bulb not working in multiple locations.sws damaged mud sills various locations mis

    May 11, 2022 · Penalty $625

    Resolve
  • Class - 2

    As per hpd section of law. 27-2033 boiler access notice. signs not posted conspicuously in lobby of building; post signs.

    May 4, 2022 · Penalty $625

    Active
  • Class - 2

    Failure to provide pedestrian protection.at time of my inspection at an occupied 22 story building with a sidewalk shed erected,i noticed failure to maintain sidewalk shed in a safe condition:1)loose missing de

    Mar 9, 2022 · Penalty $10,000

    Active
  • Class - 2

    Failure to file acceptable amended cycle 7b & 8b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#808113. agg2 history og noncompliance on

    Oct 8, 2021 · Penalty $1,250

    Active
  • Class - 2

    Sidewalk shed parapet information panel. note: at the time of inspection observed a heavy duty sidewalk shed at excp#1,in front of bldg. pedestrian walking under the sidewalk shed. also observed parapet informa

    Feb 12, 2021 · Penalty $1,250

    Active
  • Class - 2

    Failure to file acceptabel amended cycle 7b and 8b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #808113 agg1:prior nov 37012075n under

    Jun 3, 2020 · Penalty $10,000

    Active
  • Class - 2

    Failure to safegaurd public & property at the of inspection, i observed the protective netting from the side walk shed hanging off the vertical members and flapping in the wind onto the dedicated pedistrian

    Jan 25, 2019 · Penalty $625

    Active
  • Class - 2

    Failure to file acceptable amended cycle 8b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#808113. remedy: file acceptable report

    Aug 1, 2018 · Penalty $3,125

    Active
  • Class - 1

    Partial swo issued for suspended scaffold pursuant 28-207.2 & posted on premises. unqualified workers performing work on scaffold. noted: attime of inspection following workers: segindo condo &(large)saquiapull

    Apr 7, 2017 · Penalty $2,400

    Active
  • Class - 1

    Partial swo issued for suspended scaffold pursuant 28-207.2 & posted on premises. failure to provide guardrails. noted: at time of inspection no guardrails are provided at the top of the sidewalk shed where

    Apr 7, 2017 · Penalty $2,400

    Active
  • Class - 2

    Sec. 3307.6.5.3 failure to maintain sidewalk shed in order. noted: at time of inspection consturction materials & debris are stored on top of the sidewalk shed. netting is loose & does not cover the entire heig

    Apr 7, 2017 · Penalty $800

    Active
  • Class - 2

    Temporary construction equipment on site-exp permit. noted: at time of inspection permit for sidewalk shed at exp#1 exp on 9-7-16. remedy: renew shed permit.

    Apr 7, 2017 · Penalty $2,000

    Resolve
  • Class - 1

    Sec. 3314.6.3 partial swo issued for suspended scaffold pursuant 28-207.2 & posted on premises. failure to attach life lines & tiebacks to a different point of anchorage. noted: at time of inspection lifeline &

    Apr 7, 2017 · Penalty $1,600

    Active
  • Class - 1

    Partial swo issued for suspended scaffold pursuant 28-207.2 & posted on premises. no record of daily inspection of suspended scaffold at site. noted: at time of inspection suspended scaffold is being used at ex

    Apr 7, 2017 · Penalty $2,400

    Active
  • Class - 1

    Sec. 3314.4.2.4 partial swo issued for suspended scaffold pursuant 28-207.2 & posted on premises. supervisor is not present at the site. noted: at time of inspection suspended scaffold at exp#1 being used w/o

    Apr 7, 2017 · Penalty $1,600

    Active
  • Class - 2

    08v01,05l10,34o02,39o02,70o02/(05)cab door not closing properly slamming;(34)clean entire shaftway.

    Jan 9, 2017

    Resolve
  • Class - 2

    Failure to file acceptable amended report indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file acceptable amended report.

    Nov 7, 2016 · Penalty $800

    Active
  • Class - 2

    15,50a,50b,50c. 50a-leaking coil plate (gasket) on #2 boiler that running down front of boiler; 50b-need to clean up oil in back of boiler room; 50c-found outside on street 1 oil tank (temp) without barricades

    Apr 8, 2016 · Penalty $500

    Active
  • Class - 1

    Failure to comply w/an order of the commissioner. noted at time of in spection outrigger beams were disassembled.no notification was filed with department. this condition is direct noncompliance with stop work

    Apr 29, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    3314.4.1.5 partial swo issued for suspended scaffold pursuant 28-207.2and posted on premises. notification of adjustable suspended scaffold noted: at time of inspection suspended scaffold installed at exp3 w/o

    Apr 3, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Sidewalk shed does not meet code specifications. - missing parapet panels. - storing wood planking on shed. remedy: conform to shed b code specifications.

    Aug 19, 2013 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to provide approved accepted plans at job site at time of inspection. stop work order. no cd-5 on site. two outriggers set up exp#1.rmdy:provide plans,partial stopwork order on suspended scaffold at exp

    May 6, 2013 · Penalty $250

    Resolve
  • Class - 2

    Failed to notify dept/obtain permit prior to use/inst off outrigger beams in connection with suspended scaffold.no outrigger notification; foreman on site naeem saleem cert number 321755.rmdy:notify the dept

    May 1, 2013 · Penalty $400

    Resolve
  • Class - 2

    Temporary construction equipment on site expire permit. expired shed permit. rmdy: comply with code.

    May 1, 2013

    Resolve
  • Class - 2

    Temporary construction equipment on site expired permit. expired shed permit. rmdy: comply w/code.

    Apr 4, 2013 · Penalty $800

    Resolve
  • Class - 2

    05e10,10h10,05h10,44h10,52k10,60x10. 05-car door rollers and car door gibs are worn; 44-stowing uneven groove wear; 52-hoist ropes are rusted with rouge and showing crown wear.

    Jan 9, 2013

    Resolve
  • Class - 2

    52k10 - hoist ropes are rusted with rouge and crown wear.

    Jan 9, 2013

    Resolve
  • Class - 2

    Work w/o permit. -no permit for shed -permit is in process 2/9/12. remedy: comply w/code.

    May 4, 2012 · Penalty $4,000

    Resolve
  • Class - 2

    34o02 39o02 40o02 39q03 42o02 52m07 60q03 61t07 45q03 68m07 70o02 73o02 74o02 97o02 39x10-repair light top of car 39q03-install gaurd for light top of car 52m07 -provide spin out for hoist ropes 61t07-provide c

    Aug 10, 2010

    Resolve
  • Class - 2

    Failure to file an amended 6 round report acceptable to this dept indicating corrections of unsafe conditions described in initial local law11/98 report.36006019lrem:file an amended report following remedial re

    Jun 11, 2010 · Penalty $8,000

    Resolve
  • Class - 2

    Sidewalk shed does not meet code specifications. missing vandal proof fixtures history of now compliance. remedy: conform shed to code.

    Aug 4, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept.indicating correction of unsafe conditions described in inital local law 11/98 report remedy:file an amended report following remedial repa

    Dec 5, 2008 · Penalty $4,000

    Resolve
  • Class - 3

    39o02.39q03.620q03.71q03.77q03.40q03.98y15.100bb05.39q03 install guardfor light top of car 77q03 install guard for light under car 40q03 install cover on electrical bx in moter rm 100bb05 file & perform 2yr tes

    Aug 12, 2008

    Resolve
  • Class - 2

    Sec 27-misc,28 misc. miscellaneous violation defect noted: sidewalk shed overload w/ bricks and sandbags at the southern section of the shedpermit #210003878 expires 12/31/08 "storage is not permitted on this

    Jul 10, 2008

    Resolve
  • Hazardous

    No record of daily inspection of scaffolds performed by an authorized person on site. remedy: provide record of daily inspection.

    Apr 2, 2008 · Penalty $1,250

    Resolve
  • Hazardous

    Licensed rigger failed to ensure that the scaffold workers met minimumrequirements. no certificate of fitness workers on scaffold do not posses a valid certificate of fitness. remedy: obtain certificate of fitn

    Apr 2, 2008 · Penalty $1,500

    Resolve
  • Hazardous

    Licensed rigger failed to name a designated foreman or an unqualified foreman. no designated foreman id present on site @ time of inspection.

    Apr 2, 2008 · Penalty $500

    Resolve

Complaints

  • Electric

    Lighting

    Sep 28, 2026 · Apt 15C

    Close
  • Water leak

    Heavy flow

    Sep 27, 2026 · Apt 15C

    Close
  • Paint/plaster

    Ceiling

    Sep 27, 2026 · Apt 15C

    Close
  • Paint/plaster

    Wall

    Sep 27, 2026 · Apt 15C

    Close
  • Flooring/stairs

    Floor

    Sep 18, 2026 · Apt 15C

    Close
  • Paint/plaster

    Wall

    Sep 18, 2026 · Apt 15C

    Close
  • Plumbing

    Water supply

    Sep 18, 2026 · Apt 15C

    Close
  • Paint/plaster

    Radiator

    Sep 18, 2026 · Apt 15C

    Close
  • Plumbing

    Water supply

    Sep 18, 2026 · Apt 15C

    Close
  • Paint/plaster

    Wall

    Jun 12, 2026 · Apt 15C

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    May 30, 2026 · Apt 15C

    Close
  • Paint/plaster

    Wall

    May 30, 2026 · Apt 15C

    Close
  • Paint/plaster

    Ceiling

    May 30, 2026 · Apt 15C

    Close
  • Paint/plaster

    Wall

    May 30, 2026 · Apt 15C

    Close
  • Plumbing

    Water supply

    May 26, 2026 · Apt 22

    Close
  • Unsanitary condition

    Mold

    May 13, 2026 · Apt 15C

    Close
  • Water leak

    Slow leak

    May 6, 2026 · Apt 15C

    Close
  • Flooring/stairs

    Floor

    Apr 23, 2026 · Apt 15C

    Close
  • Paint/plaster

    Wall

    Apr 23, 2026 · Apt 15C

    Close
  • Door/window

    Window frame

    Apr 23, 2026 · Apt 15C

    Close
  • Door/window

    Door frame

    Apr 23, 2026 · Apt 15C

    Close
  • Plumbing

    Radiator

    Apr 23, 2026 · Apt 15C

    Close
  • Door/window

    Door

    Apr 23, 2026 · Apt 15C

    Close
  • Water leak

    Damp spot

    Apr 20, 2026 · Apt 15C

    Close
  • Unsanitary condition

    Mold

    Apr 20, 2026 · Apt 15C

    Close
  • Electric

    Power outage

    Nov 17, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 27, 2025 · Apt 15A

    Close
  • Plumbing

    Water supply

    May 27, 2025 · Apt WHOLEB

    Close
  • Plumbing

    Water supply

    May 27, 2025 · Apt 14H

    Close
  • Plumbing

    Water supply

    May 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 4, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2024 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Apr 1, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 17, 2023 · Apt BLDG

    Close
  • Plumbing

    Toilet

    Jun 13, 2023 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Jun 13, 2023 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    Jun 13, 2023 · Apt 1A

    Close
  • Unsanitary condition

    Sewage

    Jun 13, 2023 · Apt 1A

    Close
  • Unsanitary condition

    Sewage

    May 16, 2023 · Apt 1A

    Close
  • Plumbing

    Toilet

    May 9, 2023 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    May 9, 2023 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Apr 25, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 23, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 11, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2023 · Apt 6A

    Close
  • Heat/hot water

    Entire building

    Mar 24, 2023 · Apt 15C

    Close
  • Water leak

    Heavy flow

    Mar 6, 2023 · Apt 3B

    Close
  • Water leak

    Heavy flow

    Mar 6, 2023 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Feb 26, 2023 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D4)
Year built
1965
Floors
22
Residential units
171
Building area
232,808 ft²
Lot area
53,000 ft²
Zoning
R6
Community board
208
Council district
11
Block / lot
3258 / 73
Assessed value
$5,058,900
Landmark / historic district
No

HPD registration #221536, last renewed Sep 29, 2025.

Questions about 3400 Ft Independence St

Who owns 3400 Ft Independence St?

The owner of record in NYC Department of City Planning PLUTO data is Cannon Heights INC.

Does 3400 Ft Independence St have violations?

Yes. NYC HPD has recorded 84 housing violations at this property.

Is 3400 Ft Independence St rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 3400 Ft Independence St built?

City records list 1965 as the year it was built.

How many apartments are in 3400 Ft Independence St?

It has 171 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.