roofy

2755 Kingsbridge Terrace

Bronx, NY 10463BBL 2-03256-0098Map

Owner of record: 2753 East Kingsbridge Terrace INC.

2755 Kingsbridge Terrace is a walk-up apartment building built in 2010 in Bronx, 10463. It has 3 residential units across 3 floors. The owner of record is 2753 East Kingsbridge Terrace INC.. HPD has recorded 131 housing violations here, most recently on October 11, 2026. 44 of the 50 most recent violations are still open.

HPD violations
131
DOB violations
3
ECB violations
4
HPD complaints
73

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 131

  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story

    Oct 11, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story

    Oct 11, 2026

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling at public hall, 3rd story

    Oct 11, 2026

    Open — Nov sent out
  • A

    Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 1st story

    Oct 11, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Oct 11, 2026

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Oct 11, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Oct 11, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 11, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 11, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Oct 11, 2026 · Apt 3

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Oct 11, 2026 · Apt 3

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from east at south

    Oct 11, 2026 · Apt 3

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 31, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    May 31, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    May 31, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less than 2 square feet at ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from east at south original violation 18810313 issued 23-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Apr 23, 2026 · Apt 3

    Open — Not complied with
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 23, 2026

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 2 square feet at ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from east at south

    Apr 23, 2026 · Apt 3

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Apr 23, 2026 · Apt 3

    Open — Not complied with
  • C

    M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Apr 16, 2026 · Apt 3

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Mar 26, 2026 · Apt 3

    Open — Notice of issuance sent to tenant
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 26, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Mar 26, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 26, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Mar 26, 2026

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Mar 26, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Mar 26, 2026

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 20, 2026

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the entire apartment located at apt 3, 3rd story, 3rd apartment from east at south

    Mar 20, 2026 · Apt 3

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Mar 20, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Mar 20, 2026

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 20, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Mar 20, 2026

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum of 130 degrees at hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Mar 14, 2026 · Apt 3

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings that is missing.

    Mar 4, 2026

    Open — Nov sent out
  • A

    Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided.

    Mar 4, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Mar 4, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Mar 4, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Mar 4, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox that is missing.

    Mar 4, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing.

    Mar 4, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Mar 4, 2026

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system lock door at boiler room at boiler room

    Mar 4, 2026

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Mar 4, 2026 · Apt 2

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 4, 2026 · Apt 2

    Open — Notice of issuance sent to tenant
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 4, 2026 · Apt 2

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 4, 2026 · Apt 2

    Open — Nov sent out
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ,, in the 5th room from east located at apt 3, 3rd story, 1st apartment from east at south

    Mar 4, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective silicone caulking around bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from east at south

    Mar 4, 2026 · Apt 3

    Open — Nov sent out

DOB building violations · 3

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 18, 2010

    Dob violation - dismissed

ECB violations · 4

  • Class - 1

    Work w/o permit.work noted:permit#201115373-01 expired on 7/23/10 while work is being performed.workers were installing finish flooring,plaster work & a retaining wall @ rear of premises.stop all work & obtain

    Aug 13, 2010 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain retaining wall.retaining wall @ rear of premises on exp#2 has collapsed.the wall is approx 8'-0" in height & erected w/ concrete masonry units w/ no reasons or ties to support the soil.wall

    Aug 13, 2010 · Penalty $1,000

    Resolve
  • Non-hazardous

    Filinf a false certificate of correction with the nyc dob pursuant to ac section 26-126.2 noted: respondent files a certificate of correction on 06/21/07 for ecb no 34499182r. on 01/10/08 an inspection revealed

    Jan 10, 2008 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to comply w/ the commissioners order to correct violating condition and file a cert of correction with nyc dob for ecb notice of violation 34499182r. remedy: correct violating condition and file a valid

    Jan 10, 2008 · Penalty $2,500

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Apr 26, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Apr 20, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Apr 10, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Apr 3, 2026 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Apr 2, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Mar 29, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Mar 23, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Mar 18, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Mar 14, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Mar 13, 2026 · Apt 3

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Mar 12, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Mar 4, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Mar 3, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 28, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 27, 2026 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Feb 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 25, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 24, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 24, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 23, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 22, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 21, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 17, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 17, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 10, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 8, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 6, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 6, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 3

    Close
  • Water leak

    Slow leak

    Dec 30, 2025 · Apt 3

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 24, 2025 · Apt BLDG

    Close
  • Electric

    Lighting

    Sep 17, 2025 · Apt 3

    Close
  • Safety

    Fire escape

    Sep 9, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 9, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Aug 19, 2025 · Apt 2

    Close
  • Plumbing

    Water supply

    Apr 21, 2025 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Apr 8, 2025 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Apr 8, 2025 · Apt 3

    Close
  • General

    Bell/buzzer/intercom

    Apr 8, 2025 · Apt 3

    Close
  • Electric

    Lighting

    Apr 8, 2025 · Apt 3

    Close
  • Plumbing

    Water supply

    Apr 8, 2025 · Apt 3

    Close
  • Electric

    Lighting

    Apr 7, 2025 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Apr 1, 2025 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2025 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2025 · Apt 3

    Close
  • Plumbing

    Water supply

    Feb 24, 2025 · Apt 3

    Close
  • Outside building

    Roofing

    Feb 24, 2025 · Apt 3

    Close
  • Water leak

    Slow leak

    Feb 24, 2025 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
2010
Floors
3
Residential units
3
Building area
3,417 ft²
Lot area
1,658 ft²
Zoning
R6
Community board
208
Council district
14
Block / lot
3256 / 98
Assessed value
$57,540
Landmark / historic district
No

HPD registration #226745, last renewed Jul 18, 2025.

Questions about 2755 Kingsbridge Terrace

Who owns 2755 Kingsbridge Terrace?

The owner of record in NYC Department of City Planning PLUTO data is 2753 East Kingsbridge Terrace INC..

Does 2755 Kingsbridge Terrace have violations?

Yes. NYC HPD has recorded 131 housing violations at this property.

Is 2755 Kingsbridge Terrace rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2755 Kingsbridge Terrace built?

City records list 2010 as the year it was built.

How many apartments are in 2755 Kingsbridge Terrace?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.