3055 Sedgwick Avenue
Bronx, NY 10468BBL 2-03253-0226Map
Owner of record: Sedgwick Ave NY LLC
3055 Sedgwick Avenue is an elevator apartment building built in 2021 in Bronx, 10468. It has 20 residential units across 6 floors. The owner of record is Sedgwick Ave NY LLC. HPD has recorded 17 housing violations here, most recently on January 11, 2026.
- HPD violations
- 17
- DOB violations
- 3
- ECB violations
- 18
- HPD complaints
- 4
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 11, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6b, 6th story, 1st apartment from south at west
Jan 11, 2026 · Apt 6B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6b, 6th story, 1st apartment from south at west
Jan 11, 2026 · Apt 6B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6b, 6th story, 1st apartment from south at west
Jan 11, 2026 · Apt 6B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electric hvac split system at west wall in the 2nd room from north at west located at apt 6b, 6th story, 1st apartment from south at west
Jan 11, 2026 · Apt 6B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6b, 6th story, 1st apartment from south at west
Jan 11, 2026 · Apt 6B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electric hvac split system at west wall in the 1st room from north at west located at apt 6b, 6th story, 1st apartment from south at west
Jan 11, 2026 · Apt 6B
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 26, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Apr 26, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Apr 26, 2025
Closed — Violation closed
Show 7 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 1st apartment from north at east
Apr 26, 2025 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Apr 26, 2025
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 26, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Apr 26, 2025
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Apr 26, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Apr 26, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 26, 2025
Closed — Violation closed
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Sep 1, 1992
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Sep 1, 1992
V%*-dob violation - dismissed
ECB violations · 18
- Class - 2
At time of inspection on an active jobsite, i observed wall-hung fire extinguishers throughout the jobsite and no monthly inspection tags or record of logs were available upon request. in addition observed one
Jul 28, 2022 · Penalty $625
Resolve - Class - 2
Failure to maintain/display onsite docs required by bcch33-no preshift,toolbox talk,orientation log onsite.note:atoi observed competent person&plumbers,sprinkler workers onsite&work in progress.upon request to
Apr 29, 2022
Resolve - Class - 2
3301.13.13 const super failure to maintain logbook as per code.note:atoi observed competent person&workers onsite interior work in progress.upon request to cs logbook competent provide logbook&that book never s
Apr 29, 2022 · Penalty $1,250
Resolve - Class - 2
Exterior walls on exposures 1, 2, 3 and 4 at 1st floor were installed without 2" (r-10ci.) continuous insulation between cmu and brick veneer contrary to comcheck and exterior walls details as per plans., confo
Aug 12, 2021
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.at timeof a complaint in regards to work while on stop work order.i noticed 6workers and competent person onsite perform brick and cement work.full
Jun 24, 2021
Resolve - Class - 1
Unsafe storage of combutible material a at time of my inspection of a proposed 6 story building at 2nd floor level.i noticed gas container on 1st floor level approx 4 rid gas cannot stored as per fine code requ
Jun 24, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain safety temporary guardrail at time of my inspection of a proposed 6 story building at 2nd floor level approx 10 feet height.i noticed at exposure#2,3,4 no temporary guardrail system has been
Jun 24, 2021 · Penalty $2,500
Resolve - Class - 1
Unsafe storage of material during construction at time of my inspection of a proposed 6 story building at 2nd floor level approx 10 feet height.i noticed at exposure#2 wooden pallets with concrete blocks stored
Jun 24, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to renew permit for construction fence.at time of inspection of a proposed 6 story nb observed construction fence in place that has an expired permit dated 06/05/2021.when according to building code whe
Jun 21, 2021 · Penalty $625
Resolve - Class - 1
Failure to provide sidewalk shed where required.at time inspection on a proposed 6 story new building to reach a height of 67 feet when topped off i osberved no sidewalk shed in place with structural steel beam
Jun 18, 2021 · Penalty $10,000
Resolve
Show 8 more ↓
- Class - 1
Underpinning work contrary to construction documents. at the time of my inspection,i observed that the underpinning work for the foundation of the adjoining property's building at exposure#4 was constructed con
Nov 23, 2020 · Penalty $2,500
Resolve - Class - 1
Bc 3307.7 inadequate construction fence. at the time of my inspection,i observed several defects in the const fence at exposures#2-4 which left the site accessible to the public and adjoining properties. specif
Nov 23, 2020 · Penalty $2,500
Resolve - Class - 1
Missing documents to be kept on site. at the time of my inspection,i observed that the construction superintendent did not have any vibration or monitoring reports for the adjoining property at exposure#4 which
Nov 23, 2020 · Penalty $1,250
Resolve - Class - 2
Inadequate log book. at the time of my inspection,i observed that the project log book did not include a complete record of unsafe conditions and non-conforming work. specifically,the log book did not include t
Nov 23, 2020 · Penalty $2,500
Resolve - Class - 2
Jobsite fence does not meet code specifications.@time of inspection o f demo sign off inspection noted that the job site fence was intalled incorrectly.attached to existing 6' wroughtiron fence with wire.the
Jan 8, 2019
Resolve - Non-hazardous
Work doesn't conform to approved plans - plumbing. additional fictures added. remedy: conform to approved plans.
Jan 8, 2003 · Penalty $250
Resolve - Non-hazardous
Violation of parking regulation si a residential district note: 5 motor vehicles parked in driveway at time if inspection remedy: discontinue unlwaful use
Oct 10, 2001
Resolve - Non-hazardous
Failure to maintain.defect is: 1,accumulation of construction debris throughout yard and around house. 2,windows glass on the second fl. level broken. remedy:remove debris and repair glass from windows.
Sep 30, 1992
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 9, 2026 · Apt 6B
Close - Paint/plaster
Wall
Jan 9, 2026 · Apt 6B
Close - Plumbing
Water supply
Nov 18, 2025 · Apt 4D
Close - Heat/hot water
Entire building
Apr 25, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2021
- Floors
- 6
- Residential units
- 20
- Building area
- 16,531 ft²
- Lot area
- 4,950 ft²
- Zoning
- R6A
- Community board
- 208
- Council district
- 14
- Block / lot
- 3253 / 226
- Assessed value
- $1,433,250
- Landmark / historic district
- No
HPD registration #229157, last renewed Aug 7, 2025.
Questions about 3055 Sedgwick Avenue
Who owns 3055 Sedgwick Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Sedgwick Ave NY LLC.
Does 3055 Sedgwick Avenue have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 3055 Sedgwick Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3055 Sedgwick Avenue built?
City records list 2021 as the year it was built.
How many apartments are in 3055 Sedgwick Avenue?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.