2854 Kingsbridge Terrace
Bronx, NY 10463BBL 2-03253-0133Map
Owner of record: 2854 Kingsbridge Ter LLC
2854 Kingsbridge Terrace is a walk-up apartment building built in 1920 in Bronx, 10463. It has 3 residential units across 3.5 floors. The owner of record is 2854 Kingsbridge Ter LLC. HPD has recorded 38 housing violations here, most recently on August 18, 2026. 27 of the 38 most recent violations are still open.
- HPD violations
- 38
- DOB violations
- 0
- ECB violations
- 4
- HPD complaints
- 38
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 38
- CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Lead docs submitted, not acceptable - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, east wall in the 5th room from east located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 5th room from east located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from south at west wall, south wall, 1st window frame from east at south wall in the 4th room from east located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from south at west wall in the private hallway located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the bathroom located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from west at north wall, 1st window frame from east at south wall in the 2nd room from east at south located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from south at west wall, 1st window frame from east at south wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st window frame from north at east wall in the 1st room from east at north located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued
Show 28 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 5th room from east located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from south at west wall, south wall, 1st window frame from east at south wall in the 4th room from east located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from south at west wall in the private hallway located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the bathroom located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from west at north wall, 1st window frame from east at south wall in the 2nd room from east at south located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from south at west wall, 1st window frame from east at south wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st window frame from north at east wall in the 1st room from east at north located at apt 2, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 2
Open — Defect letter issued - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 17, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 2, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 28, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 11, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 14, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2015
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 3, 3rd story
Feb 15, 2011 · Apt 3
Open — Not complied with - BHazardous
Repair or replace the smoke detector that is missing in the entire apartment located at apt 3, 3rd story
Feb 15, 2011 · Apt 3
Open — Not complied with - BHazardous
Properly secure the loose 2nd, 3rd and 4th tread up at public hall stairs, 2nd story
Feb 15, 2011
Open — Not complied with
DOB building violations · 0
No DOB violations on record
ECB violations · 4
- Non-hazardous
Work without a permit work noted in that of having removed spiral stairs leading from basement to 1st.fl.installed kitchen,bathroom & removed partitions throughout 1st.story apt.remedy:obtain permit,file plans
May 2, 2000 · Penalty $2,500
Active - Non-hazardous
Work without a permit. work noted: bsmt public hallway rated wall enxlosure has been removed. new plumbing & electric at 1st & 2nd story. remedy: obtain approval & permit.
Oct 31, 1997 · Penalty $1,000
Active - Non-hazardous
Work withou a permit noted (1) basement public hall rated wall encloure has been removed - new electic drishbuer -new plumbing gas meters * basement 1st story 2nd story *aic remedy:(1) stop all work (2) obtain
Oct 18, 1996 · Penalty $350
Active - Hazardous
Failure to safely and safely remove material debris from construction site noted:dischange and storage of construction debris from first story basement onto public side walk *stop work order sewed work w/09 per
Oct 18, 1996 · Penalty $175
Active
Complaints
- Water leak
Slow leak
Aug 3, 2026 · Apt APT2
Close - Paint/plaster
Ceiling
Aug 3, 2026 · Apt APT2
Close - Paint/plaster
Ceiling
Aug 3, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Oct 25, 2025 · Apt APT2
Close - Heat/hot water
Entire building
Nov 13, 2020 · Apt ENTIRE
Close - Heat/hot water
Entire building
Nov 12, 2020 · Apt ENTIRE
Close - Heat/hot water
Entire building
Jan 23, 2016 · Apt BLDG
Close - Heat/hot water
Apartment only
Sep 22, 2015 · Apt 2
Close - Heating
Heat related
Dec 10, 2013 · Apt NA
Close - Plumbing
Water-leaks
Jul 12, 2013 · Apt PLP
Close
Show 28 more ↓
- General
Cabinet
Jul 12, 2013 · Apt PLP
Close - General
Mold
Jul 12, 2013 · Apt PLP
Close - Heating
Heat related
Feb 3, 2012 · Apt 2
Close - Heating
Heat related
Jan 29, 2012 · Apt 2
Close - Heating
Heat related
Feb 11, 2011 · Apt 3
Close - Nonconst
Vermin
Aug 21, 2009 · Apt B
Close - Paint/plaster
Wall
Aug 21, 2009 · Apt B
Close - Paint/plaster
Wall
Aug 21, 2009 · Apt B
Close - Paint/plaster
Ceiling
Aug 21, 2009 · Apt B
Close - Paint/plaster
Wall
Aug 21, 2009 · Apt B
Close - Nonconst
Rubbish
Aug 21, 2009 · Apt B
Close - Heating
Heat related
Dec 25, 2008 · Apt 2
Close - Heating
Heat related
Dec 12, 2008 · Apt 1FL
Close - Heating
Heat related
Dec 5, 2008 · Apt BLDG
Close - Heating
Heat related
Oct 20, 2008 · Apt 2
Close - Heating
Heat related
Mar 30, 2008 · Apt 3
Close - Heating
Heat related
Dec 6, 2007 · Apt 3FL
Close - Heating
Heat related
Nov 21, 2007 · Apt 2FL
Close - Heating
Heat related
Feb 5, 2007 · Apt 3
Close - Electric
Wiring
Apr 19, 2005 · Apt 3
Close - Heating
Heat related
Dec 20, 2004 · Apt 1
Close - Heating
Heat related
Dec 14, 2004 · Apt 3FL
Close - Nonconst
Rubbish
Feb 24, 2004 · Apt 3 FL
Close - Paint/plaster
Cabinet
Feb 24, 2004 · Apt 3 FL
Close - Plumbing
Water-leaks
Feb 24, 2004 · Apt 3 FL
Close - General
Doors
Feb 24, 2004 · Apt 3 FL
Close - Paint/plaster
Ceiling
Feb 24, 2004 · Apt 3 FL
Close - Heating
Heat related
Feb 24, 2004 · Apt 3 FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1920
- Floors
- 3.5
- Residential units
- 3
- Building area
- 4,620 ft²
- Lot area
- 4,900 ft²
- Zoning
- R6
- Community board
- 208
- Council district
- 14
- Block / lot
- 3253 / 133
- Assessed value
- $79,440
- Landmark / historic district
- No
HPD registration #217292, last renewed Jan 29, 2026.
Questions about 2854 Kingsbridge Terrace
Who owns 2854 Kingsbridge Terrace?
The owner of record in NYC Department of City Planning PLUTO data is 2854 Kingsbridge Ter LLC.
Does 2854 Kingsbridge Terrace have violations?
Yes. NYC HPD has recorded 38 housing violations at this property.
Is 2854 Kingsbridge Terrace rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2854 Kingsbridge Terrace built?
City records list 1920 as the year it was built.
How many apartments are in 2854 Kingsbridge Terrace?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.