2811 Sedgwick Avenue
Bronx, NY 10468BBL 2-03253-0123Map
Owner of record: Agbaeze , Gabriel
2811 Sedgwick Avenue is a walk-up apartment building built in 1925 in Bronx, 10468. It has 3 residential units across 2.75 floors. The owner of record is Agbaeze , Gabriel. HPD has recorded 25 housing violations here, most recently on March 3, 2015. 22 of the 25 most recent violations are still open.
- HPD violations
- 25
- DOB violations
- 2
- ECB violations
- 4
- HPD complaints
- 87
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- CImmediately hazardous
Provide temporary seal at all accessible opennings erp installed slide bolt and pad lock
Mar 3, 2015
Closed — Violation closed - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for # 3 (vacate # 121999) located at apt, 1st apartment from south at west
Feb 23, 2015
Open — Info nov sent out - BHazardous
Properly repair with similar material the broken or defective 4th and 5th wood riser up from bottom at public hall stairs, 2nd story
Jan 29, 2015
Open — Nov sent out - BHazardous
Replace with new the missing ceiling light fxture in the 1st room from east located at apt 3, 3rd story
Jan 29, 2015 · Apt 3
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at south and west electric outlet in the 2nd room from east located at apt 3, 3rd story
Jan 29, 2015 · Apt 3
Open — Nov sent out - BHazardous
Properly secure the loose handrail at stairs in the private hallway located at apt 3fl, 3rd story
Jan 29, 2015 · Apt 3FL
Open — Nov sent out - BHazardous
Section 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy
Jan 29, 2015
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at ceiling light fixture in the kitchen located at apt 3, 3rd story
Jan 29, 2015 · Apt 3
Open — Nov sent out - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk
Jan 29, 2015
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range installed at kitchen created at illegal apartment created at attic
Jan 29, 2015
Open — Nov sent out
Show 15 more ↓
- BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections behind walls and under floors at bathroom and kitchen created at illegal apartment created at attic
Jan 29, 2015
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at 1st room from east at attic.
Jan 29, 2015
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of electric cord at floor from kitchen to room e1, attic.
Jan 29, 2015
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass pane lower window sash in the bathroom, at attic
Jan 29, 2015
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass pane upper and lower sashes at south window, in the kitchen, attic.
Jan 29, 2015
Open — Nov sent out - CImmediately hazardous
Replace with new the missing upper and lower sashes at west window, in the kitchen, attic
Jan 29, 2015
Open — Nov sent out - CImmediately hazardous
Properly secure the loose handrail at public hall, attic
Jan 29, 2015
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible in the attic
Jan 29, 2015
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range. in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Nov 18, 2013 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Nov 18, 2013 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Nov 18, 2013 · Apt 2
Open — Nov sent out - BHazardous
Remove the illegal fastening double cylinder lock, at apt. door. in the entrance located at apt 2, 2nd story, 1st apartment from east at south
Nov 18, 2013 · Apt 2
Open — Nov sent out - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for attic room
Aug 7, 2007
Open — Info nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections ;; in the entire apartment located at apt 3, 3rd story, apartment at east
Mar 14, 2007 · Apt 3
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible ;; in the entire apartment located at apt 3, 3rd story, apartment at east
Mar 14, 2007 · Apt 3
Open — Nov sent out
DOB building violations · 2
- Construction other optional
C-construction other optional
May 2, 2007
Dob violation - active - Construction other optional
C-construction other optional
Sep 18, 2004
Dob violation - dismissed
ECB violations · 4
- Class - 3
Masonry cracks at exp.#1 and 2 first floor level. missing/dislodged facade materials including roof shingles at exp.#1 and 2 attic and first floor level., repair and or replace
Apr 5, 2022 · Penalty $500
Active - Hazardous
Occupancy contrary to that allowed by c of o.attic converted from ordinary use into a class'a' apt w/ full kitchen and bathroom thereby increasing bldg occupancy. remedy:restore to prior legal condition
Jul 26, 2007 · Penalty $10,000
Active - Hazardous
Occupancy contrary to that allowed by c of o attic converted from ordinary use into a class"a" apt w/ full kitchen and bathroom area,thereby increasing bldg occupancy.remedy:restore to prior legal condition
Mar 14, 2007 · Penalty $2,500
Active - Hazardous
Occupancy contrary to building department records new building application #221 of 1920: legal use- one family dwelling. illegal use- three family dwelling one apartment created on each floor 1st, 2nd and third
Nov 16, 1999 · Penalty $800
Resolve
Complaints
- Electric
Lighting
Feb 27, 2015 · Apt 3RDFLR
Close - Unsanitary condition
Garbage/recycling storage
Feb 27, 2015 · Apt 3RDFLR
Close - Electric
Wiring
Feb 27, 2015 · Apt 3RDFLR
Close - Flooring/stairs
Floor
Feb 27, 2015 · Apt 3RDFLR
Close - Door/window
Window pane
Feb 27, 2015 · Apt 3RDFLR
Close - Door/window
Window pane
Feb 27, 2015 · Apt 3RDFLR
Close - Heat/hot water
Apartment only
Feb 27, 2015 · Apt 3RDFLR
Close - Door/window
Window frame
Feb 27, 2015 · Apt 3RDFLR
Close - Electric
Power outage
Feb 27, 2015 · Apt 3RDFLR
Close - Electric
Outlet/switch
Feb 27, 2015 · Apt 3RDFLR
Close
Show 40 more ↓
- Electric
Outlet/switch
Feb 27, 2015 · Apt 3RDFLR
Close - Paint/plaster
Ceiling
Feb 27, 2015 · Apt 3RDFLR
Close - Water leak
Damp spot
Feb 27, 2015 · Apt 3RDFLR
Close - Electric
Wiring
Feb 27, 2015 · Apt 3RDFLR
Close - Paint/plaster
Ceiling
Feb 16, 2015 · Apt 3
Close - Unsanitary condition
Mold
Feb 16, 2015 · Apt 3
Close - Unsanitary condition
Garbage/recycling storage
Feb 16, 2015 · Apt 3
Close - General
Mailbox
Feb 16, 2015 · Apt 3
Close - Electric
No lighting
Feb 16, 2015 · Apt 3
Close - Electric
Outlet/switch
Feb 16, 2015 · Apt 3FL
Close - Door/window
Window pane
Feb 16, 2015 · Apt 3FL
Close - Paint/plaster
Ceiling
Feb 16, 2015 · Apt 3FL
Close - Heat/hot water
Apartment only
Feb 16, 2015 · Apt 3FL
Close - Door/window
Window pane
Jan 24, 2015 · Apt 3FL
Close - Door/window
Window pane
Jan 24, 2015 · Apt 3FL
Close - Flooring/stairs
Stairs
Jan 24, 2015 · Apt 3FL
Close - Plumbing
Bathtub/shower
Jan 24, 2015 · Apt 3FL
Close - Water leak
Damp spot
Jan 24, 2015 · Apt 3FL
Close - Paint/plaster
Ceiling
Jan 24, 2015 · Apt 3FL
Close - Electric
Power outage
Jan 24, 2015 · Apt 3FL
Close - Door/window
Window pane
Jan 22, 2015 · Apt 3
Close - Door/window
Window pane
Jan 22, 2015 · Apt 3
Close - Plumbing
Bathtub/shower
Jan 22, 2015 · Apt 3
Close - Paint/plaster
Wall
Jan 22, 2015 · Apt 3
Close - Electric
Power outage
Jan 22, 2015 · Apt 3
Close - Plumbing
Basin/sink
Jan 13, 2015 · Apt 3
Close - Plumbing
Basin/sink
Jan 13, 2015 · Apt 3
Close - Electric
Power outage
Jan 13, 2015 · Apt 3
Close - Electric
No lighting
Jan 13, 2015 · Apt 3
Close - Plumbing
Bathtub/shower
Jan 13, 2015 · Apt 3
Close - Plumbing
Toilet
Jul 24, 2014 · Apt 3FL
Close - Plumbing
Bathtub/shower
Jul 24, 2014 · Apt 3FL
Close - Door/window
Window pane
Jul 24, 2014 · Apt 3FL
Close - Door/window
Window pane
Jul 24, 2014 · Apt 3FL
Close - General
Cabinet
Jul 13, 2014 · Apt 2
Close - Plumbing
Bathtub/shower
Jul 13, 2014 · Apt 2
Close - Plumbing
Basin/sink
Jul 13, 2014 · Apt 2
Close - Water leak
Heavy flow
Jul 13, 2014 · Apt 2
Close - Paint/plaster
Ceiling
Jul 13, 2014 · Apt 2
Close - Plumbing
Bathtub/shower
Jun 19, 2014 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1925
- Floors
- 2.75
- Residential units
- 3
- Building area
- 3,198 ft²
- Lot area
- 2,944 ft²
- Zoning
- R6
- Community board
- 208
- Council district
- 14
- Block / lot
- 3253 / 123
- Assessed value
- $52,800
- Landmark / historic district
- No
Questions about 2811 Sedgwick Avenue
Who owns 2811 Sedgwick Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Agbaeze , Gabriel.
Does 2811 Sedgwick Avenue have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 2811 Sedgwick Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2811 Sedgwick Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 2811 Sedgwick Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.