2250 Aqueduct Avenue East
Bronx, NY 10453BBL 2-03208-0031Map
Owner of record: Spaxel Cbre Aqueduct LLC
2250 Aqueduct Avenue East is an elevator apartment building built in 2023 in Bronx, 10453. It has 56 residential units across 7 floors. The owner of record is Spaxel Cbre Aqueduct LLC. HPD has recorded 48 housing violations here, most recently on April 21, 2017.
- HPD violations
- 48
- DOB violations
- 10
- ECB violations
- 34
- HPD complaints
- 79
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 48
- CImmediately hazardous
Provide re seal up of all accessible openings
Apr 21, 2017
Closed — Violation closed - CImmediately hazardous
Provide seal up all accessible opening entire building
Sep 23, 2016
Closed — Violation closed - CImmediately hazardous
Provide seal up to all accessible openings at all stys of vacant dwelling
Sep 15, 2016
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 31, 2016
Closed — Violation closed - CImmediately hazardous
Provide proper seal up windows and doors of the entire building
Aug 26, 2016
Closed — Violation closed - CImmediately hazardous
Provide a temporary seal to all accessible openings
Jun 2, 2014
Closed — Violation closed - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for entire building (vacate #116637)
May 15, 2014
Closed — Violation closed - CImmediately hazardous
Provide temporary sealup of all accesible openings
Apr 24, 2014
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of wood studs and sheetrock and vinyl siding erected from floor to ceiling creating an addtional room. approx. 10'w x 8'd x 9'h. built over garage with two doors installed.
Apr 24, 2014
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures thru-out in the entire apartment located at apt, 2nd story
Apr 24, 2014
Closed — Violation closed
Show 38 more ↓
- CImmediately hazardous
Provide adequate supply of hot water for the fixtures troughout in the entire apartment located at apt, 2nd story
Apr 24, 2014
Closed — Violation closed - CImmediately hazardous
Remove all obstructions from water closet in the bathroom located at apt ph, 2nd story, apartment at north
Apr 17, 2014 · Apt PH
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures in the kitchen and bathroom in the entire apartment located at apt ph, 2nd story, apartment at north
Apr 17, 2014 · Apt PH
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at the kitchen and bathroom in the entire apartment located at apt ph, 2nd story, apartment at north
Apr 17, 2014 · Apt PH
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2sty, 2nd story, apartment at north
Apr 17, 2014 · Apt 2STY
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of walls erected floor to ceiling using sheetrock and studs creating illegal class 'a'' apt at 1st sty , 1st story
Mar 27, 2014
Closed — Violation closed - CImmediately hazardous
Make safe by properly repairing the structural defect. wooden floor joists partially collapsed in bathroom located at apt ph, 2nd story
Mar 27, 2014 · Apt PH
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of illegal class ''a'' apartment using sheetrock and studs created at 1sty. located at apt ph, 2nd story
Mar 27, 2014 · Apt PH
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections inside wall at full bathroom at illegally created class ''a'' apt at 1st sty , 1st story
Mar 27, 2014
Closed — Violation closed - CImmediately hazardous
Remove all obstructions and repair all defects in waste line at shower stall , 1st story
Mar 27, 2014
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections at full bathroom created at 1 sty located at apt ph, 2nd story
Mar 27, 2014 · Apt PH
Closed — Violation closed - CImmediately hazardous
Make safe by properly repairing the structural defect. cement and ceramic floor tile collapsing located at apt ph, 2nd story
Mar 27, 2014 · Apt PH
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective slopping wood floor in the kitchen located at apt ph, 2nd story
Mar 27, 2014 · Apt PH
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the entire apartment located at apt ph
Mar 27, 2014 · Apt PH
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass pane at lower sash window in the 1st room from east at south located at apt ph, 3rd story
Mar 27, 2014 · Apt PH
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass panel at sliding door at bathtub in the bathroom located at apt ph, 3rd story
Mar 27, 2014 · Apt PH
Closed — Violation closed - BHazardous
Replace with new the broken or defective entrance door located at apt ph, 2nd story
Mar 27, 2014 · Apt PH
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of cascading water from west side of bldng , 1st story
Jan 25, 2014
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story
Jan 25, 2014 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures throughout apt in the entire apartment located at apt 2, 2nd story
Jan 25, 2014 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures throughout apt in the entire apartment located at apt 2, 2nd story
Jan 25, 2014 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story
Jan 25, 2014 · Apt 2
Closed — Violation closed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1fl, 1st story
Jan 16, 2014 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures in the bathroom and in the kitchen located at apt 1fl, 1st story
Jan 16, 2014 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures in the bathroom and in the kitchen located at apt 1fl, 1st story
Jan 16, 2014 · Apt 1FL
Closed — Violation closed - BHazardous
Replace the broken or defective bathtub in the bathroom located at apt 1stfl, 1st story, apartment at east
Sep 10, 2013 · Apt 1STFL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls in the entire apartment located at apt 1stfl, 1st story
Sep 10, 2013 · Apt 1STFL
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at basement
Sep 10, 2013
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet toilet in the bathroom located at apt 1stfl, 1st story
Sep 10, 2013 · Apt 1STFL
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
Sep 10, 2013
Closed — Violation closed - BHazardous
Replace the broken or defective washbasin in the bathroom located at apt 1stfl, 1st story
Sep 10, 2013 · Apt 1STFL
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1stfl, 1st story
Sep 10, 2013 · Apt 1STFL
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... ceiling in the bathroom located at apt 1stfl, 1st story
Sep 10, 2013 · Apt 1STFL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor at public hall, 1st story
Sep 10, 2013
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the entire apartment located at apt 1stfl, 1st story
Sep 10, 2013 · Apt 1STFL
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of rodents rats at basement
Sep 10, 2013
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... ceiling in the 1st room from east located at apt 1stfl, 1st story
Sep 10, 2013 · Apt 1STFL
Closed — Violation closed - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at apt 1stfl, 1st story
Sep 10, 2013 · Apt 1STFL
Closed — Violation closed
DOB building violations · 10
- Construction other optional
Due to fire
Nov 22, 2017
Dob violation - dismissed - Immediate emergency anythingoptional
Erect fence around premises to safeguard public and proterty
Nov 22, 2017
Dob violation - dismissed - Immediate emergency anythingoptional
Fully demolish the building
Nov 22, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 23, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 2, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 2, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 2, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2012
Dob violation - dismissed
ECB violations · 34
- Class - 1
At the time of my inspection of a 7 story new building approximately 7,263 square feet, site was closed and there was no construction activity. upon shouting at perimeter and banging on fence to alert watchpers
Dec 29, 2025 · Penalty $5,000
Resolve - Class - 2
Bc 3307.1 scope. at the time of inspection, observed crane operations on street. noticed full street was closed. asked workers to provide department of transportation(dot) to substantiate work with crane on str
Apr 26, 2024 · Penalty $1,250
Resolve - Class - 2
Observed sidewalk shed at exposure 1 3 and 4. upon request to see sidewalk shed approved drawing, none were provided at time of inspection. as per code, all document pertaining to a job must be on site.provide/
Apr 26, 2024 · Penalty $1,250
Resolve - Class - 2
At time of inspection i observed concrete washout being performed at back of dump truck with plastic liner being used. upon request for design drawings for back of dump truck used for concrete washout none was
Dec 4, 2023 · Penalty $2,500
Resolve - Class - 2
Inadequate guardrails. at time of inspection i observed guardrails inadequately maintained at 1story excavation pit area and not properly secured as required to with stand 200 pounds of pressure.properly repair
Dec 4, 2023
Resolve - Class - 2
At time of inspection at active jobsite i observed pipe scaffold inadequately maintained with missing baseplates and planks not properly secured with material stored on top creating a hazardous condition ( coll
Dec 4, 2023 · Penalty $2,500
Resolve - Class - 2
Placing of soil or foundation work equipment and excavated material. at time of inspection i observed excavator placed on loose soil and at leading edge creating a hazardous condition of machinery tipping over
Dec 4, 2023 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35078697r issued on 5/1/14 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Jul 7, 2014 · Penalty $800
Resolve - Class - 2
Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the dept. of bldg for notice of vio. # 35084733x issued on 04/09/14 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a certif
Jun 16, 2014 · Penalty $800
Resolve - Class - 1
Failure to comply with the commissioner's order contained in notice of violation #3795769j issued on 06/28/12.note:@ first story,plumbing,partitions + electric no permits.rem:comply with the commissioner's orde
Jun 6, 2014
Resolve
Show 24 more ↓
- Class - 1
Failure to maintain.defect is rear garage,extension & rear bathroom are rotted & in danger of collapse.rem:continue to comply with pending partial vacate order,obtain permits repair defects immediately.
May 1, 2014 · Penalty $2,500
Resolve - Class - 1
Fail to maintain bldg in code-compliant manner.note:rear of home in disrepair,in danger of collapse & danger to pedestrians & tenants alike.( )water damage thruout,beams & joist rotted,partial vacate,entire rea
Apr 9, 2014 · Penalty $1,000
Resolve - Class - 1
Failure to comply with the commissioner's oder contained in notice of violation #37951769j issued on 06/28/12.note:@ 1st story plumbing,par titions,electrical no permits.rem:comply with the commissioner's order
Mar 28, 2014
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34951769j issued on 6/28/12. note: at 1st story plumbing,partitions & electrical no permits. remedy: comply w/the comm's order.
Jan 9, 2014
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34951769j issued on 6/28/12. note: at 1st story plumbing,partitions & electrical no permits. remedy: comply w/the comm's order.
Nov 18, 2013
Resolve - Class - 1
Failure to comply w/commissioner's order contained in nov#34951769v issued on 6/28/12. note: at 1st story plumbing,partitions & electricity.no permits rmdy: comply w/commissioner's order.
Sep 16, 2013
Resolve - Class - 1
Failure to comply w/commissioner's order contained in nov#34951769y issued on 6/28/12.noted: at 1st story plumbing partitions & electricity.no permits. rmdy: comply w/commissioner's order.
Jul 31, 2013
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34951769y issued on 6/28/12. note: at 1st story plumbing,partitions & electrical no permits. remedy: comply w/the comm's order.
May 21, 2013
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34951769y issued on 6/28/12. note: at 1st story plumbing,partitions & electrical no permits. remedy: comply w/the comm's order.
Mar 18, 2013
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34986763n issued on 8/21/12 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Jan 2, 2013 · Penalty $4,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34937369y issued on 8/16/12 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Jan 2, 2013 · Penalty $4,000
Resolve - Class - 1
Failure to comply w/commissioner's order contained in nov#34951769y issued on 6/28/12. note: at 1st story installed plumbing, partitions an d electric no permit. remedy: comply w/commissioner's order.
Jan 2, 2013 · Penalty $12,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34957768m issued on 6/28/12 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Jan 2, 2013 · Penalty $4,000
Resolve - Class - 2
Failure to comply with commissioner's order to file a certificate of correction with the dob for nov#34957768m issued on 6/28/12 pursuant to28-204.4 & 1rcny 102-01.remedy:file a certificate of correction.
Oct 17, 2012 · Penalty $8,000
Resolve - Class - 2
Failure to comply with commissioner's order to file a certificate of correction w/dob for nov#34986763n issued on 8/21/12 pursuant to 28-2 04.4 & 1rcny 102-01.remedy:file a certificate of correction.
Oct 17, 2012 · Penalty $8,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34957769y issued on 6.28.12. note: at 1st sty installed plumbing, partition and electric. no permits. remedy: comply w/the commissioner's order.
Oct 17, 2012 · Penalty $24,000
Resolve - Class - 1
Failure to maintain bldg in a code-compliant manner. noted: roof of attached 2 car garage has holes, w/water/insect damaged roof joists which have failed due to excessive rot. (roof partially collapsed). *make
Aug 21, 2012 · Penalty $10,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #34951768m issued on 6.28.12 pursuant to 28-204.4 & 1rcny 102-01 for occupancy contrary to the c/o. remedy: file a c/c.
Aug 21, 2012 · Penalty $8,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34951769y issued on 6.28.12 for work w/o a permit at the 1st sty installed plumbing, partitions and electric. remedy: comply w/the commissioner's
Aug 21, 2012 · Penalty $24,000
Resolve - Class - 1
Failure to maintain exterior building. defect at rear,exposures,the 2 car garage is in disrepair. the roof membrane & wood joist are rotted & have holes. remedy: maintain & make all neccessary repairs.
Aug 16, 2012 · Penalty $2,500
Resolve - Class - 1
Work w/o a permit. noted: at 1st story erected partitions to create a 1 class 'a' apt w/1 bedroom and kitchen/living room area. also installed water/waste lines for (1) 3 pc bathroom (toilet,sink,shower), a
Jun 28, 2012 · Penalty $4,000
Resolve - Class - 1
Occupancy contrary to that allowed by the c/o. noted: c/o #11386 of 10.2.1952 indicates bldg to be used legally as 1 family at 2nd & 3rd flrs. 1st flr c/o indicates to be boiler room, storage and 2 car garage
Jun 28, 2012 · Penalty $6,000
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner. use of prohibited door and/or hardware per bc 1008.1.8; 27-371(j). noted: at 3rd sty installed 2 double cylinder locks & @ 1st sty installed 2 double cylinder
Jun 28, 2012 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner. defect noted: at rear 2 car garage on 1st flr, roof membrane and wood members some are rotten and roof has some holes. @ front entrance steel stairs at 2nd flr
Jun 28, 2012 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Mold
Jul 30, 2015 · Apt 2FL
Close - Heat/hot water
Entire building
Apr 16, 2014 · Apt 2STY
Close - Plumbing
Toilet
Apr 15, 2014 · Apt PH
Close - Plumbing
Water supply
Apr 15, 2014 · Apt PH
Close - Door/window
Door
Apr 3, 2014 · Apt 1FLR
Close - Door/window
Window frame
Mar 26, 2014 · Apt PH
Close - Door/window
Door
Mar 26, 2014 · Apt PH
Close - Flooring/stairs
Floor
Mar 26, 2014 · Apt PH
Close - Plumbing
Basin/sink
Mar 26, 2014 · Apt PH
Close - Paint/plaster
Ceiling
Mar 26, 2014 · Apt PH
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Mar 26, 2014 · Apt PH
Close - Water leak
Slow leak
Mar 26, 2014 · Apt PH
Close - Electric
Power outage
Mar 26, 2014 · Apt PH
Close - Safety
Fire escape
Mar 26, 2014 · Apt PH
Close - Door/window
Window frame
Mar 26, 2014 · Apt PH
Close - Door/window
Door
Mar 26, 2014 · Apt PH
Close - Paint/plaster
Ceiling
Mar 26, 2014 · Apt PH
Close - Door/window
Door
Mar 26, 2014 · Apt PH
Close - Flooring/stairs
Floor
Mar 26, 2014 · Apt PH
Close - Plumbing
Basin/sink
Mar 26, 2014 · Apt PH
Close - Paint/plaster
Ceiling
Mar 26, 2014 · Apt PH
Close - Plumbing
Bathtub/shower
Mar 26, 2014 · Apt PH
Close - Water leak
Slow leak
Mar 26, 2014 · Apt PH
Close - Electric
Power outage
Mar 26, 2014 · Apt PH
Close - Safety
Fire escape
Mar 26, 2014 · Apt PH
Close - Paint/plaster
Ceiling
Mar 26, 2014 · Apt PH
Close - Door/window
Door
Mar 26, 2014 · Apt PH
Close - Door/window
Door
Mar 21, 2014 · Apt 1FL
Close - Door/window
Door
Mar 21, 2014 · Apt 1FL
Close - Door/window
Door
Mar 21, 2014 · Apt 1FL
Close - Door/window
Door frame
Mar 21, 2014 · Apt 1FL
Close - Heating
Heat related
Jan 23, 2014 · Apt NA
Close - Plumbing
Water supply
Jan 22, 2014 · Apt 1FL
Close - Plumbing
Water supply
Jan 22, 2014 · Apt 1FL
Close - Heating
Heat related
Jan 22, 2014 · Apt 1FL
Close - Heating
Heat related
Jan 9, 2014 · Apt NA
Close - Plumbing
Water supply
Jan 9, 2014 · Apt 1FL
Close - Heating
Heat related
Jan 9, 2014 · Apt 1FL
Close - Heating
Heat related
Jan 9, 2014 · Apt NA
Close - Heating
Heat related
Jan 6, 2014 · Apt NA
Close - Heating
Heat related
Jan 4, 2014 · Apt NA
Close - Heating
Heat related
Jan 4, 2014 · Apt NA
Close - Heating
Heat related
Nov 25, 2013 · Apt NA
Close - Heating
Heat related
Nov 25, 2013 · Apt 1FL
Close - Heating
Heat related
Oct 25, 2013 · Apt NA
Close - General
Mold
Sep 8, 2013 · Apt 1STFL
Close - Plumbing
Water-leaks
Sep 8, 2013 · Apt 1STFL
Close - General
Mold
Sep 8, 2013 · Apt 1STFL
Close - Plumbing
Toilet
Sep 8, 2013 · Apt 1STFL
Close - Plumbing
Water-leaks
Sep 8, 2013 · Apt 1STFL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2023
- Floors
- 7
- Residential units
- 56
- Building area
- 56,341 ft²
- Lot area
- 11,175 ft²
- Zoning
- R7-1
- Community board
- 205
- Council district
- 14
- Block / lot
- 3208 / 31
- Assessed value
- $3,942,450
- Landmark / historic district
- No
Questions about 2250 Aqueduct Avenue East
Who owns 2250 Aqueduct Avenue East?
The owner of record in NYC Department of City Planning PLUTO data is Spaxel Cbre Aqueduct LLC.
Does 2250 Aqueduct Avenue East have violations?
Yes. NYC HPD has recorded 48 housing violations at this property.
Is 2250 Aqueduct Avenue East rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2250 Aqueduct Avenue East built?
City records list 2023 as the year it was built.
How many apartments are in 2250 Aqueduct Avenue East?
It has 56 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.